- ML20073D460 + (08:58:05, 15 December 2024)
- PY-CEI-NRR-1861, Submits Addl Info to Answer Questions Raised During NRC Review of Util 930311 & 1221 Responses to NRC Bulletin 90-001,Suppl 1 + (08:58:06, 15 December 2024)
- ML20073D456 + (08:58:07, 15 December 2024)
- ML20073D450 + (08:58:07, 15 December 2024)
- ML20073D446 + (08:58:08, 15 December 2024)
- ML20073D445 + (08:58:10, 15 December 2024)
- ML20073D441 + (08:58:10, 15 December 2024)
- ML20073D439 + (08:58:11, 15 December 2024)
- RC-94-0251, Provides 10CFR50.46 30 Day Rept,Documenting Changes to Current ECCS Evaluation Model Due to Boiling Heat Transfer Correlation Errors,Steam Line Isolation Logic Errors & Core Node Zirc Oxide Initialization Error + (08:58:11, 15 December 2024)
- 05000335/LER-1983-018-03, /03L-0:on 830309,during Local Leak Rate Testing, Valve FCV-25-3 Leaked Excessively & Check Valves V-27101 & V-27102 Stuck Open.Caused by Dirt Preventing Closure. Valves Adjusted & Cleaned + (08:58:13, 15 December 2024)
- ML20073D436 + (08:58:14, 15 December 2024)
- ML20073D433 + (08:58:15, 15 December 2024)
- ML20073D432 + (08:58:16, 15 December 2024)
- ML20073D431 + (08:58:17, 15 December 2024)
- ML20073D430 + (08:58:18, 15 December 2024)
- ML20073D427 + (08:58:19, 15 December 2024)
- ML20073D425 + (08:58:20, 15 December 2024)
- 05000348/LER-1994-004, :on 940602,valve Actuator Spacer Bolts Found to Be of Incorrect Matl.Bolts of Correct Matl Installed in Actuator & Turbine Steam Admission Valve + (08:58:22, 15 December 2024)
- ML20073D422 + (08:58:23, 15 December 2024)
- ML20073D418 + (08:58:24, 15 December 2024)
- 05000296/LER-1983-019-03, /03L-0:on 830312,while Performing Surveillance Instruction SI 4.3.C (Scram Timing),Control Rod Drive 38-31 Failed to Scram Upon Signal.Caused by O-ring on Valve Out of Position.Valve Rebuilt + (08:58:25, 15 December 2024)
- ML20073D411 + (08:58:26, 15 December 2024)
- ML20073D409 + (08:58:27, 15 December 2024)
- ML20073D408 + (08:58:28, 15 December 2024)
- ML20073D405 + (08:58:29, 15 December 2024)
- ML20073D404 + (08:58:30, 15 December 2024)
- 05000254/LER-1994-008-07, :on 940820,unit 1 Reactor Was Manually Scrammed by Procedure to Achieve Shutdown Condition Required by Tss. Caused by Work Practices Associated W/Crimping Terminal Lug. Wire Terminal Lugs Were Replaced W/New Parts + (08:58:31, 15 December 2024)
- 05000259/LER-1983-015-03, /03L-0:on 830310,temp Switch TS-71-2L Operated at 2049F,exceeding Tech Spec Requirements.Caused by Temp Switch Calibr Drift.Switch Replaced,Functionally Tested & Returned to Svc + (08:58:33, 15 December 2024)
- RC-94-0244, Forwards TS Pages Due to Discovery of Missing Page (Page 6-16a) from TS Change TSP 940003,Suppl 1 Request for Administrative Changes, + (08:58:34, 15 December 2024)
- 05000296/LER-1983-019, Forwards LER 83-019/03L-0 + (08:58:35, 15 December 2024)
- ML20073D393 + (08:58:35, 15 December 2024)
- 05000259/LER-1983-015, Forwards LER 83-015/03L-0 + (08:58:36, 15 December 2024)
- RC-94-0245, Forwards IST Relief Request NRR 940001,Suppl 1,per 940914 Telcon.Relief Request Pertains to Bolting Exams (VT-3) Following Bolted Connection Leakage Occurring During Sys Pressure Test + (08:58:36, 15 December 2024)
- ML20073D383 + (08:58:37, 15 December 2024)
- BSEP-83-1102, Ro:On 830221,fire Barrier Penetration Limiting Conditions for Operation 1-83-115 Issued to Permit Work on 20-ft Elevation of Svc Water Bldg Required for Installation of Plant Mod.Due to Work complexity,7-day Time Frame Exceeded + (08:58:38, 15 December 2024)
- ML20073D376 + (08:58:38, 15 December 2024)
- ML20073D371 + (08:58:39, 15 December 2024)
- ML20073D367 + (08:58:42, 15 December 2024)
- 0CAN099406, Forwards Summary of Four Resolved Commitments,Including Procurement Restrictions on Cardinal Industrial Products, Tagging Voltmeters to Require Operations Supervisor Approval Prior to Removal from Svc & Radioiodine Measurements + (08:58:43, 15 December 2024)
- HL-4698, Responds to Violations Noted in Insp Rept 50-321/96-16. Corrective Actions:Main Steam Line High Flow Isolation Analytical Limits Reviewed & Correct Limits Calculated + (08:58:44, 15 December 2024)
- ML20073D354 + (08:58:44, 15 December 2024)
- PY-CEI-NRR-1852, Forwards Changes to Emergency Response Data System Dpl for Perry Nuclear Power Plant,Unit 1 + (08:58:45, 15 December 2024)
- ML20073D350 + (08:58:45, 15 December 2024)
- HL-4678, Requests Relief from Liquid PT Examination Requirements & Ultrasonic Examination Schedule Contained in NUREG-0619,as Modified by GL 88-11 + (08:58:46, 15 December 2024)
- ML20073D345 + (08:58:46, 15 December 2024)
- 05000321/LER-1983-032-03, /03L-0:on 830308,600-volt Motor Control Ctr 1R24-S001 Component 3A Tripped 1A Standby Gas Treatment Sys During Drywell Venting.Caused by Loose Wire Resulting in Blown Fuse in Sys Fan Starter Control Circuit + (08:58:48, 15 December 2024)
- ML20073D330 + (08:58:49, 15 December 2024)
- SNRC-2183, Forwards Amend 6 to Indemnity Agreement B-87 + (08:58:49, 15 December 2024)
- ML20073D325 + (08:58:50, 15 December 2024)
- ML20073D323 + (08:58:51, 15 December 2024)
- HL-4695, Application for Amend to License DPR-57,requesting Temporary Change to Unit 1 TSs Re Emergency Diesel Generator Operability Requirements During Reactor Shut Down Conditions + (08:58:52, 15 December 2024)