ML20073D350

From kanterella
Jump to navigation Jump to search
Forwards Rev 3 to IST Program,Containing Individual Review Sheets to Add 17 Valves Added to Station Through Design Change Process to IST Program.Three Revised Pump Review Sheets Also Encl
ML20073D350
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 09/20/1994
From: Miltenberger S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20073D352 List:
References
NLR-N94167, NUDOCS 9409270161
Download: ML20073D350 (3)


Text

f.

Public service Electric and Gas Company r

Staven E. Mittenberger Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1100 t

v,c.e,m e,ocw noc"' "

SEP 2 01994 NLR-N94167 f

United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

INSERVICE TESTING PROGRAM HOPE CREEK GENERATING STATION DOCKET NO. 50-354 Public Service Electric & Gas Company (PSE&G) hereby provides Revision 3 to the Inservice Testing (IST) Program for Hope Creek Nuclear Generating Station.

Revision 2 to the IST Program was submitted by letter dated December 23, 1988.

Attachments 1 through 5 to this letter contain the revised pages

{

for the IST Program.

Seventeen valves have been added to the station through the design change process. Attachment 1 contains the individual review sheets to add these valves to the IST Program.

Relief requests for five valves were denied by the NRC in the Hope Creek IST Safety Evaluation Report, dated September 27, 1990. contains the review sheets for these valves, revised to delete the relief request, and the deleted relief requests.

Three pump review sheets were revised to reflect the testing requirements of relief request P3. contains the revised review sheets for these pumps.

Two valves have been changed to include a cold shutdown justification.

The review sheets associated with these valves are contained in.

Two valves had the testing requirements changed from a three month exercise to an eighteen month disassembly and j

inspection. contains the review sheets for these valves.

i l

i j

billi 'n 94o920 j

tS92;gggkosooggg4 e

SEP 2 01994 Document Control Desk 2

NLR-N94167 Should there be any questions with regard to this submittal, please do not hesitate to contact us.

Sincerely, A

G l

l}

[

5%~

I l

C Mr.

T.

T.

Martin, Administrator - Region I l

U.

S.

Nuclear Regulatory Commission

)

475 Allendale Road i

i l

King of Prussia, PA 19406 l

Mr.

D.

Moran, Licensing Project Manager - Hope Creek U.

S.

Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 j

j Mr. R Summers - Hope Creek (S09)

USNhC Senior Resident Inspector Mr.

K.

Tosch, Manager, IV NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625

r 8 y e

r Y

f i

i ATTACHMENT # 1 i

1 s

l l

I 3

1 i

I u--

_