Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20077E548 + (06:48:13, 15 December 2024)
- PLA-1755, Part 21 Rept Re Insufficient Clearance on GE 250-volt Dc Control Ctrs.Initially Reported on 830721.Corrective Measures Will Be Determined Upon GE Insp Completion.Separate Rept Per 10CFR50.55(e) Forthcoming + (06:48:14, 15 December 2024)
- ML20077E540 + (06:48:15, 15 December 2024)
- ML20077E536 + (06:48:15, 15 December 2024)
- PY-CEI-NRR-1355, Forwards Seventeenth Quarterly Rept Cleveland Electric Illuminating Co Seismic Monitoring Network Jan-Mar 1991 for Info,Reflecting Monitoring of Area in Vicinity of Two Waste Injection Wells Operated by Ici Americas (Formerly Calhio) + (06:48:16, 15 December 2024)
- ML20077E525 + (06:48:16, 15 December 2024)
- ML20077E517 + (06:48:17, 15 December 2024)
- ML20077E514 + (06:48:18, 15 December 2024)
- ML20077E511 + (06:48:18, 15 December 2024)
- ML20077E502 + (06:48:19, 15 December 2024)
- ML20077E501 + (06:48:19, 15 December 2024)
- ML20077E500 + (06:48:20, 15 December 2024)
- ML20077E496 + (06:48:21, 15 December 2024)
- ML20077E483 + (06:48:22, 15 December 2024)
- ML20077E471 + (06:48:23, 15 December 2024)
- ML20077E463 + (06:48:24, 15 December 2024)
- ML20077E461 + (06:48:24, 15 December 2024)
- L-91-146, Forwards Rev 0 to Physical Security Plan & Rev 0 to Safeguards Contingency Plan.Revs Withheld (Ref 10CFR2.790(a)(3)) + (06:48:25, 15 December 2024)
- ML20077E455 + (06:48:25, 15 December 2024)
- ML20077E450 + (06:48:26, 15 December 2024)
- ML20077E439 + (06:48:26, 15 December 2024)
- ML20077E436 + (06:48:27, 15 December 2024)
- ML20077E437 + (06:48:27, 15 December 2024)
- ML20077E435 + (06:48:28, 15 December 2024)
- ML20077E433 + (06:48:28, 15 December 2024)
- 05000440/LER-1994-021, :on 941108,maint Mechanic Identified Bridge Clamp Installed on Div 2 DG Testable Rupture Disc.Caused by Inadequate Work Procedure & Personnel Error/Failure to Follow Procedure.Restored Div 2 DG + (06:48:30, 15 December 2024)
- ML20077E427 + (06:48:31, 15 December 2024)
- ML20077E426 + (06:48:31, 15 December 2024)
- ML20077E422 + (06:48:32, 15 December 2024)
- ML20077E416 + (06:48:33, 15 December 2024)
- ML20077E417 + (06:48:33, 15 December 2024)
- ML20077E412 + (06:48:34, 15 December 2024)
- 3F0591-11, Forwards Special Rept 91-02,including Summary of Eddy Current Testing & List of Tube Indications + (06:48:35, 15 December 2024)
- ML20077E411 + (06:48:35, 15 December 2024)
- ML20077E403 + (06:48:36, 15 December 2024)
- 05000341/LER-1994-008, :on 941108,unrecognized Entry Into TS Action Statements Occurred.Caused by Poor Communication Among Entire Shift Team.Individuals Involved Counseled on Need to Specifically Review Applicable TS + (06:48:37, 15 December 2024)
- ML20077E400 + (06:48:40, 15 December 2024)
- ML20077E387 + (06:48:44, 15 December 2024)
- RBG-41096, Responds to NRC Re Violations Noted in Insp Rept 50-458/94-19.Corrective Actions:Maint Lifting Procedures (Mlp) 7506, Refueling Platform & 7504, Fuel Handling Platform Will Be Revised + (06:48:45, 15 December 2024)
- ML20077E386 + (06:48:45, 15 December 2024)
- ML20077E370 + (06:48:46, 15 December 2024)
- ML20077E369 + (06:48:46, 15 December 2024)
- ML20077E366 + (06:48:47, 15 December 2024)
- ST-HL-AE-4947, Requests That Term Ambient, in Surveillance Requirement 4.8.1.1.2.a.2 Be Changed to Standby, Re Proposed Amend to Licenses NPF-76 & NPF-80 for South Tx Project by Revising TS 3.8.1.1, Electrical Power Sys-ac Sources-Operating + (06:48:48, 15 December 2024)
- ML20077E354 + (06:48:49, 15 December 2024)
- ML20077E346 + (06:48:50, 15 December 2024)
- ML20077E348 + (06:48:50, 15 December 2024)
- ML20077E342 + (06:48:51, 15 December 2024)
- ML20077E338 + (06:48:52, 15 December 2024)
- ML20077E340 + (06:48:52, 15 December 2024)
- ML20077E336 + (06:48:53, 15 December 2024)