Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GO2-83-837, Revised Final Deficiency Rept 271 Re Anchor Darling Valves W/Antirotation Collars (LPCS-V-121).Startup Problem Rept M-2720 Issued to Document deficiency.L-shaped Key Used for Valves Subj to Heavy Vibration + (05:57:50, 15 December 2024)
- ML20078B398 + (05:57:50, 15 December 2024)
- 05000306/LER-1994-004-02, :on 941220,discovered That CWS Snubber Was Not Tested as Required.Caused by Oversight by Project Engineer. Removed Snubber for Further Testing & Installed Replacement Snubber + (05:57:52, 15 December 2024)
- PY-CEI-NRR-1876, Responds to NRC Re Violations Noted in Insp Rept 50-440/94-11 on 940707-0818.Corrective Actions:Event Has Been Reviewed W/I&C Personnel Involved W/Planning of Work Order Package + (05:57:56, 15 December 2024)
- LD-83-143, Responds to NRC Re Violations Noted in IE Insp Rept 50-528/83-31.Corrective Actions:Startup Personnel to Ensure All Procedure Action Statements Complete.Const Power Cable Removed & Returned to Const for Disposition + (05:57:57, 15 December 2024)
- ML20078B381 + (05:57:57, 15 December 2024)
- 05000321/LER-1994-011, :on 940930,unplanned Automatic Start of EDG Occurred Due to Personnel Error.Involved Electrician Made Aware of Mistake & Consequences + (05:57:59, 15 December 2024)
- ML20078B362 + (05:58:00, 15 December 2024)
- ML20078B356 + (05:58:01, 15 December 2024)
- ML20078B359 + (05:58:01, 15 December 2024)
- 05000301/LER-1994-002-01, :on 940713,quarterly TS Test of PORV Block Valve Not Performed.Caused by Improper Temporary Change to IST Procedure IT-25.Temporary Change Approved on 940707 + (05:58:03, 15 December 2024)
- ML20078B345 + (05:58:04, 15 December 2024)
- ML20078B348 + (05:58:04, 15 December 2024)
- ML20078B344 + (05:58:05, 15 December 2024)
- ML20078B342 + (05:58:06, 15 December 2024)
- ML20078B341 + (05:58:07, 15 December 2024)
- ML20078B337 + (05:58:07, 15 December 2024)
- NRC-94-0095, Confirms All Actions in Response to NRC Bulletin 93-002, Suppl 1 Completed + (05:58:08, 15 December 2024)
- ML20078B331 + (05:58:08, 15 December 2024)
- ML20078B321 + (05:58:09, 15 December 2024)
- 05000454/LER-1994-014-04, :on 940915,declared DG Inoperable in Mode 5 Due to Misinterpretation of TS Requirements.Revised Procedures & Electronic Work Control Sys + (05:58:11, 15 December 2024)
- 05000325/LER-1994-012-01, :on 940922,declared HPCI Inoperable Due to Failure of Lube Oil Cooling Water Supply Valve Control Power Fuse.Caused by Inadequate self-checking & Job Scope Walkdown.Disciplined Involved Workers + (05:58:13, 15 December 2024)
- ML20078B307 + (05:58:14, 15 December 2024)
- ML20078B304 + (05:58:14, 15 December 2024)
- BSEP-95-0012, Forwards Nonproprietary Version of Brunswick Steam Electric Plant,Unit 1 Feedwater Nozzle Fracture Mechanics Analysis, NEDC-30634,Rev 1.Requests That Copies of Document Originally Submitted by Util Be Destroyed + (05:58:15, 15 December 2024)
- 05000457/LER-1994-006-09, :on 940920,chemical & Volume Control Sys Snubber Was Removed in Order to Work on Adjacent Containment Spray Valve.Caused by Programmatic Deficiency. Work Control Procedure Will Be Revised + (05:58:16, 15 December 2024)
- HL-4716, Submits Proposed Operator Licensing Examination Schedule for FY95-98 + (05:58:17, 15 December 2024)
- ML20078B244 + (05:58:22, 15 December 2024)
- 3F1094-02, Forwards Crystal River Unit 3 Operational Safeguards Response Evaluation Rept.Rept Withheld + (05:58:23, 15 December 2024)
- 05000354/LER-1994-013-01, :on 940915,control Room Shift Manning Requirements of TS 6.2.2.a Were Not Met.Caused by Personnel Error.Administrative Procedure Revised & Operators Trained + (05:58:24, 15 December 2024)
- ML20078B202 + (05:58:25, 15 December 2024)
- GO2-83-815, Final Deficiency Rept 251 Re Limitorque Motor Operators W/ Motors from Baldor Electric Co Unqualified Per IEEE 382-1972.Initially Reported on 830422.Limitorque Will Replace Motors W/Units That Meet NUREG-0588 Requirements + (05:58:26, 15 December 2024)
- ML20078B195 + (05:58:26, 15 December 2024)
- NRC-95-0002, Forwards 940707 Internal DE Memo Re Facility Turbine Generator Event of 931225,at Request of T Colburn. Understands That Reason Memo Requested Was Because Memo Discussed Info About Shaft Bow + (05:58:27, 15 December 2024)
- ML20078B155 + (05:58:28, 15 December 2024)
- ML20078B153 + (05:58:29, 15 December 2024)
- ML20078B154 + (05:58:29, 15 December 2024)
- ML20078B139 + (05:58:30, 15 December 2024)
- ML20078B150 + (05:58:30, 15 December 2024)
- 05000302/LER-1994-014, :on 941031,determined That RB Fan/Cooler Operation Develops Cooling Sys Flow Imbalance Due to Personnel Error.Design Basis Configuration Document Will Be Revised + (05:58:32, 15 December 2024)
- ML20078B103 + (05:58:33, 15 December 2024)
- ML20078B098 + (05:58:34, 15 December 2024)
- ML20078B085 + (05:58:34, 15 December 2024)
- ULNRC-03131, Informs That Util Will Implement Current Order Timing Mod & Current Order Surveillance Test,As Described in Listed WOG Documents During Refuel 7 (Mar-May 1995) in Response to NRC 941215 RAI Re GL 93-04 + (05:58:35, 15 December 2024)
- ML20078B073 + (05:58:36, 15 December 2024)
- ML20078B078 + (05:58:36, 15 December 2024)
- ML20078B039 + (05:58:37, 15 December 2024)
- ML20078A960 + (05:58:41, 15 December 2024)
- 05000302/LER-1994-008, :on 941011,inattention to Detail Caused Incompleted Surveillance Test within Designated Time Period & Resulted in Violation of Ts.Conducted Presentation on Attention to Detail,Communication & Teamwork + (05:58:42, 15 December 2024)
- HL-4694, Forwards Revised Physical Security Plan.Plan Withheld Per 10CFR73.71 + (05:58:43, 15 December 2024)
- ML20078A948 + (05:58:47, 15 December 2024)