ML20078B304

From kanterella
Jump to navigation Jump to search
Submits Results from Capability Test Sample 9407-NRC-16 from DOE Radiological & Environ Sciences Lab That Was Analyzed Using Normal Plant Operating Procedures
ML20078B304
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 01/17/1995
From: Stratman R
CENTERIOR ENERGY
To: House J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
PY-CEI-OIE-0417, PY-CEI-OIE-417, NUDOCS 9501250341
Download: ML20078B304 (1)


Text

-

0 CENYEMOR

. ENERGY PERRY NUCLEAR POWER PLANT Mail Address:

Robert A.Stratman to CENTER ROAD P RRY, O 10 44081 PERRY. OHIO 44081 (216) 259-3737 January 17, 1995 PY-CEI/0IE-0417L United States Nuclear Regulatory Commission 801 Warrenville Rd.

Lisle, Illinois 60532-1351 Attention: Dr. Tohn House Capability Test Sample 9407-NRC-16 Docket No. 50-440

Dear Dr. House:

The Perry Nuclear %ver Plent (PNPP) received a capability test sample (9407-NRC-16) from the United States Department of Energy Radiological and Environmental Sciences Laboratory. This sample was analyzed using normal plant operating procedures with the following results:

Nuclide Activity 11-3 3.44 E-2 uci/l Pe-55 1.377 E-2 uci/l 3r-89 6.009 E-4 uci/l Sr-90 1.371 E-3 uci/l In ac.cordance with the documentation transmitting the sample these results vere previously submitted to Dr. J. Blair Nicholas, Nuclear Regulatory Commission, Region IV.

t If you have questions or require additional information, please contact Mr. James D. Kloosterman, Manager - Regulatory Affairs at (216) 280-5833.

Sincerely yours,

/

n -

AfylAK

)

DHL i

cc: Document Control Desk l

9501250343 950117 PDR ADOCK 05000440 P

PDR Operating Companies I,

p Clevelond Electnc liluminating

{

Toledo Edtson I