3F1094-02, Forwards Crystal River Unit 3 Operational Safeguards Response Evaluation Rept.Rept Withheld
| ML20078B235 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 10/13/1994 |
| From: | Beard P FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 3F1094-02, 3F1094-2, NUDOCS 9410240171 | |
| Download: ML20078B235 (1) | |
Text
.
Florida Power
- SAFEGUARDS INFORMATION co omon
= " O' ENCLOSURE CONTAINS SAFEGUARDS INFORMATION.
October 13, 1994 UPON SEPARATION TH:5 3F1094-02 PAGE IS DECONTROLLED.
V. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555
Subject:
Crystal River Unit 3 Operational Safeguards Response Evaluation Report
Reference:
NRC to FPC letter, 3N0894-10, dated August 11, 1994
Dear Sir:
Florida Power Corporation provides the attached as our response to the subject The attachment contains Safeguards Information and, as such, evaluation report.
shall be withheld from public disclosure and protected in accordance with 10 CFR 73.21.
Sincerely, P. M. Beard, Jr.
Senior Vice President Nuclear Operations PMB/JL8:ff Attachment Regional Administrator, Region II xc:
NRR Project Manager Senior Resident Inspector
- SAFEGUARDS INFORMATION ***
cmsTAL mD1 ENEFGY COMPLEC 15790 W Power Urw a e Crymd Fever, RoMa M435470s. poq 7964486 A Horide Progrees Compov i
i 11Nant7;
.a5,
- .r)nng 3c
%[ 7 7[h, e
A cl YID M 0l])
L l
I