Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20078K957 + (05:28:02, 15 December 2024)
- ML20078K948 + (05:28:03, 15 December 2024)
- ML20078K943 + (05:28:04, 15 December 2024)
- ML20078K940 + (05:28:04, 15 December 2024)
- ML20078K927 + (05:28:05, 15 December 2024)
- ML20078K939 + (05:28:05, 15 December 2024)
- ML20078K925 + (05:28:06, 15 December 2024)
- ML20078K920 + (05:28:07, 15 December 2024)
- NRC-94-4118, Forwards Errata to Rev 1 to Westinghouse Electric AP600 Ssar + (05:28:08, 15 December 2024)
- ML20078K903 + (05:28:08, 15 December 2024)
- ML20078K879 + (05:28:09, 15 December 2024)
- ML20078K892 + (05:28:09, 15 December 2024)
- ML20078K874 + (05:28:10, 15 December 2024)
- ML20078K873 + (05:28:11, 15 December 2024)
- ML20078K863 + (05:28:15, 15 December 2024)
- ML20078K831 + (05:28:16, 15 December 2024)
- ML20078K815 + (05:28:17, 15 December 2024)
- BECO-94-127, Application for Amend to License DPR-35,revising Mode Conditions Under Scram Discharge Instrument vol-scram Trip Bypass in Table 3.2.C.1,required to Be Operable & Changes Associated Functional Test Frequency from Quarterly + (05:28:18, 15 December 2024)
- ML20078K796 + (05:28:18, 15 December 2024)
- ML20078K788 + (05:28:19, 15 December 2024)
- ML20078K786 + (05:28:19, 15 December 2024)
- ML20078K785 + (05:28:20, 15 December 2024)
- 0CAN119405, Forwards Response to Violations Noted in Insp Repts 50-313/94-18 & 50-368/94-18.Corrective Actions:Licensee Notification Communicators Provided Training on Clarification on Use of Def/Vs Fax Machine + (05:28:21, 15 December 2024)
- ML20078K774 + (05:28:21, 15 December 2024)
- 05000416/LER-1983-138-03, /03L-0:on 830831,Div I Diesel Generator Failed to Automatically Trip Following Unexpected High Bearing Temp Alarm & Was Shutdown.Caused by Leaky Pneumatic Temp Sensor Mfg by California Controls.Device Replaced + (05:28:23, 15 December 2024)
- IR 05000182/1994001 + (05:28:25, 15 December 2024)
- ML20078K760 + (05:28:26, 15 December 2024)
- ML20078K764 + (05:28:26, 15 December 2024)
- ML20078K758 + (05:28:27, 15 December 2024)
- ML20078K756 + (05:28:28, 15 December 2024)
- ML20078K753 + (05:28:28, 15 December 2024)
- AECM-83-0650, RO 83-098/0:on 830915,fire-rated Door 1A203 Blocked Open to Support Planned Maint Activities.Fire Watches Established Per Tech Spec 3.7.7 Until 831006 + (05:28:34, 15 December 2024)
- HL-4699, Forwards Corrected Pages Showing Chemistry Factor for Weld Seam 301-871 to Be 35.45 & Deleting Note 6 from Attachment 2 of Util 940701 Response to GL 92-01,Rev 1, Reactor Vessel Structural Integrity + (05:28:35, 15 December 2024)
- 05000387/LER-1983-118-03, /03L-0:on 830829,during Calibr of Main Steam Line A,Low Pressure Switch PSL-B21-1N015A Setpoint Found Below Tech Spec Allowable Value.Setpoint Failed Acceptance Criteria.Switch Replaced + (05:28:36, 15 December 2024)
- ML20078K736 + (05:28:37, 15 December 2024)
- 05000325/LER-1983-039-03, /03L-0:on 830923,during Equipment & Instrument Channel checks,PT-01.14 Revealed Drywell & Suppression Chamber Water Temp Indications Differed.Caused by Misaligned Point Indicator TR-778.Indicator Adjusted + (05:28:39, 15 December 2024)
- ML20078K728 + (05:28:42, 15 December 2024)
- ML20078K727 + (05:28:42, 15 December 2024)
- ML20078K723 + (05:28:43, 15 December 2024)
- ML20078K725 + (05:28:43, 15 December 2024)
- 05000333/LER-1983-032-03, /03L-0:on 830903,during post-mod Scram Test at 50% Rod Density,Two of Four Scram Instrument Vol Drain Valves Failed to Close in Specified Time Frame.Caused by Contact Between Handwheels & Object + (05:28:45, 15 December 2024)
- ML20078K718 + (05:28:46, 15 December 2024)
- ML20078K717 + (05:28:46, 15 December 2024)
- ML20078K715 + (05:28:48, 15 December 2024)
- 05000298/LER-1994-016, :on 940804,determined That DG 2 Not in Compliance W/Alternate Shutdown Requirements.Caused by Narrow Interpretation of Isolation Requirements for Dg. Design Change Implemented + (05:28:49, 15 December 2024)
- ML20078K706 + (05:28:51, 15 December 2024)
- ST-HL-AE-4925, Monthly Operating Repts for Oct 1994 for South Texas Project Electric Generating Station Units 1 & 2 + (05:28:51, 15 December 2024)
- ML20078K703 + (05:28:52, 15 December 2024)
- ML20078K701 + (05:28:54, 15 December 2024)
- ML20078K698 + (05:28:54, 15 December 2024)
- ML20078K696 + (05:28:55, 15 December 2024)
- ML20078K687 + (05:28:55, 15 December 2024)