8 OPERATING DATA REPORT DOCKET NO.
50-286 DATE 09/01/83 COMPLETED BY L.
Keliv TELEPHONE
'914) 739-8200 OPERATING STATUS
- 1. Unit Name: Indian Point No. 3 Nuclear Power Plant Notes
- 2. Reporting Period:
August 1983
- 3. Licensed Thermal Power (MWt):
3025
- 4. Nameplate Rating (Gross MWe):
1013 965
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
1000
- 7. Maximum Dependable Capacity (Net,MWe):
965
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
This Month Yr.-to-Date Cumulative 744 5831.0 61,392.0
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 0
333.7 34,424.5
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generator On Line 0
229.1 33,142.2
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 0 282,244 86,425,645
- 17. Gross Electrical Energy Generated (MWH) 0 68,310 26,366,610 0
60,735 25,244,178
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 0
3.9 54.0
- 20. Unit Availability Factor o
3.9 54.0
- 21. Unit Capacity Factor (Using MDC Net) 0 1.1 42.6
- 22. Unit Capacity Factor (Using DER Net) 0 1.1 42.6 100 88.6 18.0
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
Januaw 1984 25 If Shut Down At End Of Report Period. Estimated Date of Startup:
26 Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY
]d COMMERCIAL OPERATION 8310190202 830901
(
PDR ADOCK 05000286 R
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-286 UNIT Indian Point #3
=
DATE September 1, 1983 COMPLETED BY L-Keliv TELEPHONE - (914)739-8200 MONTH Auoust 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
'2 0
gg 0
3 0
39 0
4 0
20 0
5 0
21 0
0 6
22 0
7 0
3 o
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
0 14 30 0
15 0
33 0
16 0
l
(
INSTRUCTIONS On this format, list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
~
UNIT SifUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-286 UNIT NAME No. 3 DATE september 1, 1983 REPORT MONTH August 1983 COMPLETED BY f,. Kelly TELEPHONE 914-739-R200 4 u, E c
c e.
Licensu gg gm, Cause & Corrective No Date F
k _$
?jg
~
Ei 3 0
6gx Event 3.?
@"3 Action to CO
$ 5l Report a mO O
Prevent Recurrence 6
03 830618 F
744 A
3 N/A N/A Electrical malfunction in the main generator.
I 2
3 4
F: Forced Reason:
Method:
Exhibit F-Instructions S: Ssheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Repost ILER) File tNUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operato Training & License Examination F-Administ rative 5
G-Operational Estor (Explain) 1:xhibit II-Same Source 19/77)
Il Other (Explain)
H N
3 T
O 8
N I
9 O
T 1
M C
e A
r t
i s
E w
u V
g I
n u
T e
A C
k E
o R
r R
b OC der iape R
NO I
e T
T r
R C
i O
N w
P U
E F
e R
L c
A a
E M
r C
t NA t
N a
E e
T h
N I
n A
e M
ko Y
r L
B HTN OM TN e
E c
O M
a e
P r
I T
UQ t
E ae I
I 3
d3 i#c Ati cu i c rr oi BC ETA 3
D 8/9/8 I
2 R
1 W
8 M
3
MONTHLY I & C CATEGORY I REPORT August 1983 Month W.R. #
DATE EQUIPMENT HALFUNCTION CORRECTIVE ACTION l
IC-1-2118 l 6-15-83 l Component Cooling Radiation Local meter in control room Replaced meter I
! Monitor (R17B) defective IC-1-2196
! 7-21-83 Reactor Protection Train A Relay blows fuses on control Replaced relay l
l Source Range Trip Relay NC31DX drawer I
I
'IC-1-2222 l 6-20-83 Steam Cenerator Blowdown Meter reads low Cleared ground on i
Radiation Monitor (R19) detector cable l
l l
I I
i i
I l
l l
i l
l l
I
SUMMARY
OF OPERATING EXPERIENCE August 1983 Indian Point Unit 3 remains in a forced outage caused by a malfunction in the main electrical generator.
Repairs are now in nrogress an'd it is estimated that the unit will be returned to service in January 1984.
i i
l l
D Indian Point 3 Nuclear Power Plant P.O. Box 215 Buchanan, Newttk 10511 D
914 739.8200
- > NewYorkPbwer 4# Authority September 9, 1983 IP-LK-2958 Director, Nuclear Reactor Regulation Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Sir:
Encloseo you will find two copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of August, 1983.
Verytrulyyo N
Yt N#
John C. Brens jResident Manager LK/gg Enclosures cc: Director, Office of Inspection & Enforcement (40 Copies) c/o Distribution Services Branch, DDC, ADM U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. Thomas E. Murley, Regional Administrator Region 1 U. 3. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. Leroy W. Sinclair New York Power Authority 123 Main Street White Plains, New York 10601 IP 3 Resident Inspector's Office pLf George Wilverding (SRC), WP0 J. P. Bayne, WP0 INPO Records Center Suite 1500 1100 circle 75 Parkway Atlanta, Georgia 30339
-