Monthly Operating Rept for Aug 1983
ML20078K698
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 09/01/1983
From: Brons J, Kelley L
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
IP-LK-2958, NUDOCS 8310190202
Download: ML20078K698 (7)


Text

..

8 OPERATING DATA REPORT DOCKET NO.

50-286 DATE 09/01/83 COMPLETED BY L.

Keliv TELEPHONE

'914) 739-8200 OPERATING STATUS

1. Unit Name: Indian Point No. 3 Nuclear Power Plant Notes
2. Reporting Period:

August 1983

3. Licensed Thermal Power (MWt):

3025

4. Nameplate Rating (Gross MWe):

1013 965

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

1000

7. Maximum Dependable Capacity (Net,MWe):

965

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,If Any (Net MWe):
10. Reasons For Restrictions.If Any:

This Month Yr.-to-Date Cumulative 744 5831.0 61,392.0

11. Hours in Reporting Period
12. Number Of Hours Reactor Was Critical 0

333.7 34,424.5

13. Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On Line 0

229.1 33,142.2

15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 0 282,244 86,425,645
17. Gross Electrical Energy Generated (MWH) 0 68,310 26,366,610 0

60,735 25,244,178

18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 0

3.9 54.0

20. Unit Availability Factor o

3.9 54.0

21. Unit Capacity Factor (Using MDC Net) 0 1.1 42.6
22. Unit Capacity Factor (Using DER Net) 0 1.1 42.6 100 88.6 18.0
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:

Januaw 1984 25 If Shut Down At End Of Report Period. Estimated Date of Startup:

26 Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY

]d COMMERCIAL OPERATION 8310190202 830901

(

PDR ADOCK 05000286 R

PDR

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-286 UNIT Indian Point #3

=

DATE September 1, 1983 COMPLETED BY L-Keliv TELEPHONE - (914)739-8200 MONTH Auoust 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

'2 0

gg 0

3 0

39 0

4 0

20 0

5 0

21 0

0 6

22 0

7 0

3 o

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

0 14 30 0

15 0

33 0

16 0

l

(

INSTRUCTIONS On this format, list the average daily unit power levelin MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77)

~

UNIT SifUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-286 UNIT NAME No. 3 DATE september 1, 1983 REPORT MONTH August 1983 COMPLETED BY f,. Kelly TELEPHONE 914-739-R200 4 u, E c

c e.

Licensu gg gm, Cause & Corrective No Date F

k _$

?jg

~

Ei 3 0

6gx Event 3.?

@"3 Action to CO

$ 5l Report a mO O

Prevent Recurrence 6

03 830618 F

744 A

3 N/A N/A Electrical malfunction in the main generator.

I 2

3 4

F: Forced Reason:

Method:

Exhibit F-Instructions S: Ssheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Repost ILER) File tNUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operato Training & License Examination F-Administ rative 5

G-Operational Estor (Explain) 1:xhibit II-Same Source 19/77)

Il Other (Explain)

H N

3 T

O 8

N I

9 O

T 1

M C

e A

r t

i s

E w

u V

g I

n u

T e

A C

k E

o R

r R

b OC der iape R

NO I

e T

T r

R C

i O

N w

P U

E F

e R

L c

A a

E M

r C

t NA t

N a

E e

T h

N I

n A

e M

ko Y

r L

B HTN OM TN e

E c

O M

a e

P r

I T

UQ t

E ae I

I 3

d3 i#c Ati cu i c rr oi BC ETA 3

D 8/9/8 I

2 R

1 W

8 M

3

MONTHLY I & C CATEGORY I REPORT August 1983 Month W.R. #

DATE EQUIPMENT HALFUNCTION CORRECTIVE ACTION l

IC-1-2118 l 6-15-83 l Component Cooling Radiation Local meter in control room Replaced meter I

! Monitor (R17B) defective IC-1-2196

! 7-21-83 Reactor Protection Train A Relay blows fuses on control Replaced relay l

l Source Range Trip Relay NC31DX drawer I

I

'IC-1-2222 l 6-20-83 Steam Cenerator Blowdown Meter reads low Cleared ground on i

Radiation Monitor (R19) detector cable l

l l

I I

i i

I l

l l

i l

l l

I

SUMMARY

OF OPERATING EXPERIENCE August 1983 Indian Point Unit 3 remains in a forced outage caused by a malfunction in the main electrical generator.

Repairs are now in nrogress an'd it is estimated that the unit will be returned to service in January 1984.

i i

l l

D Indian Point 3 Nuclear Power Plant P.O. Box 215 Buchanan, Newttk 10511 D

914 739.8200

  1. > NewYorkPbwer 4# Authority September 9, 1983 IP-LK-2958 Director, Nuclear Reactor Regulation Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Sir:

Encloseo you will find two copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of August, 1983.

Verytrulyyo N

Yt N#

John C. Brens jResident Manager LK/gg Enclosures cc: Director, Office of Inspection & Enforcement (40 Copies) c/o Distribution Services Branch, DDC, ADM U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. Thomas E. Murley, Regional Administrator Region 1 U. 3. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. Leroy W. Sinclair New York Power Authority 123 Main Street White Plains, New York 10601 IP 3 Resident Inspector's Office pLf George Wilverding (SRC), WP0 J. P. Bayne, WP0 INPO Records Center Suite 1500 1100 circle 75 Parkway Atlanta, Georgia 30339

-