Text
_
m q
ARKANSAS POWER & LIGHT COMPANY gf Arkansas Nuclear One TRLE: TRANSMITTAL FORM NO.
1013.02H REV. # 12 PC #
Arkansas Nuclear One Russellville/83
~ Arkansas Date 10/2 MEMORANDUM
/06 - AMC )t)Mlgn To:
FROM:
ANO DOCUMENT CONTROL
SUBJECT:
ANO MASTER PLANT MANUAL UPDATE PROCEDURE NUMBER 1903.10 REV. ( 11 PC #
TC #
PROCEDURE TITLE EMERGENCY ACTION LEVEL RESPONSE PROCEDURE NUMBER REV. #
PC #
TC #
PROCEDURE TITLE PROCEDURE NUMBER REV. #
PC #
TC #
PROCEDURE TITLE The following pages of the indicated procedure (s) contains items which involve personal privacy or proprietary material. PLEASE REMOVE THE INDICATED MATERIAL PRIOR TO DISTRIBUTION TO PUBLIC DOCUMENT ROOMS, TC.
PROCEDURE (S)
PAGE (S) 1903.10 10,11,12,20,21,22,24,33-36,47-50, 57-67.
I l PROCEDURE (S) HAS BEEN PLACED IN YOUR SET OF THE PLANT MANUAL.
I PROCEDURE (S) SHOULD BE PLACED IN YOUR SET OF THE PLANT MANUAL.
NOTE: PLEASE RETURN SIGNED TRANSMITTAL TO DOCUMENT CONTROL - 4TH FLOOR:
SIGNATLTE DATE UPDATED 8310190295 831014 PDR ADOCK 05000313 F
l ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One
- RECORD OF CHANGES AND REVISIONS FORM NO. 1000.06A EMERGE 'CY PLAN PROCEDURE REV. # 12 FC # f I
s.
%r '
Safety Related YES SI NO O EMERGENCY ACTION LEVEL RESPONS:
1903 11
~*
[1t0110.Rev.rL0 V *{
4g PAGE REV PC#
PAGE REV PC#
PAGE REV PC#
PAGE REV PC#
PAGE REV PC#
1 11 41 11 2
11 42 11 3
11 43 11 4
11 44 11 l
5 11 45 11 l
6 11 46 11 7
11 47 11 8
11 48 11
(
9 11 49 11 10 11 50 11 11 11 51 11 12 11 52 11 13 11 53 11 14 11 54 11 15 11 55 11
, ()
16 11 56 11 17 11 57 11 18 11 58 11 19 11 59 11 20 11 60 11 21 11 61 11 22 11 62 11 23 11 63 11 24 11 64 11 25 11 65 11 26 11 66 11 27 11 67 11 28 11 29 11 30 11 l
31 11 32 11 33 11 34 11 35 11 36 11 37 11 38 11 39 11 4U 1 1 APPROVED BY:
APPROVAL DATE e !/[f3 ~
uf /hf REQUIRED EFFECTIVE DATE:
7 (General Manager)
gggUgTION:
PROCEDURE / WORK PLAN TITLE NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 1 01 D#
Q ARKANSAS NUCLEAR ONE asvision 11 o*TE u9/z"/63
\\~/
CHANGE DATE 1.0 PURPOSE This procedure defines conditions requiring response, delineates responsi-bilities for action and establishes required actions for each of four "Emer-gency Action Levels (EAL's)".
2.0 SCOPE This procedure is applicable to Units 1 and 2 in all modes; it does not in-clude specific plant casualty procedures or systems operations requirements, but rather provides administrative processes on'.y.
This procedure describes actions for events which meet the criteria for the Emergency Action Levels only.
3.0 DESCRIPTION
3.1 This procedure is divided in four sectio'ns arranged in order of in-creasing severity, each defining and setting response requirements for individual EAL's.
Each section is broken down into four subsections which include EAL classification criteria, personnel responsibilities and required actions, termination or escalation guidance and applicable forms.
('h 3.2 This procedure is divided into the following sections:
SECTION TITLE PAGE 3.2.1 6.0 Unusual Event 4
3.2.2 7.0 Alert 14 3.2.3 8.0 Site Emergency 25 3.2.4 9.0 General Emergency 38
4.0 REFERENCES
4.1 References Used in Procedure Preparation:
4.1.1 Arkansas Nuclear One Emergency Plan 4.2 References Used in Conjunction with this Procedure:
4.2.1 1903.32, " Area Evacuation" 4.2.2 1904.02, "Offsite Dose Projection - Pocket Computer Method" O
'r,Y l
g3gUgSyTION:
PROCEDURE / WORK PLAN TITLE:
NO:
PROCEDURE F.MERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 4 OI 0'
O ARKANSAS NUCLEAR ONE aevision 22 o*Te
- /e*'a'
/
CHANGE DATE 4.3 Related ANO Procedures:
4.3.1 1043.06, " Bomb Threat" 4.3.2 1202.40, " Refueling Accidents" 4.3.3 1202.44, " Natural Emergencies" 4.3.4 1903.20, " Toxic Gas Release" 4.3.5 1903.21, "Arkla Natural Gas Line Rupture" 4.3.6 1903.22, " Fire or Explosion" 4.3.7 1903.23, " Personnel Emergency" 4.3.8 1903.40, " Duties of the Emergency Evacuation Team" 4.3.9 1903.41, " Duties of the Emergency Fire Team" 4.3.10 1903.42, " Duties of the Emergency Nedical Team" 4.3.11 1903.43, " Duties of the Emergency Radiation Team"
(#)
4.4 Regulatory correspondence containing NRC commitments which are im-plemented in this procedure include:
4.4.1 OCAN018306 A.
Section 6.2.3.B B.
Section 7.2.3.B C.
Section 8.2.3.B D.
Section 9.2.3.B 4.4.2 OCAN068320 A.
Section 7.1.7 5.0 DEFINITIONS 5.1 Courtesy Call - A notification made to the NRC and/or the Arkansas Depart-ment of Health for cond,itions/ events other than those constituting an EAL.
Courtesy calls made to the Arkansas Departmer.t of Health should be limited to Reactor trips only.
5.2 Emergency Action Levels (EAL's) - A system of classification of unusual 7-
'( 3) or emergency situations which categorizes the spectrum of possible emer-gency situations into four groups. Each classification is asscciated with a particular set of actions to be taken to cope with the situa-tions included in that classification. The emergency action levels are
gggugTION:
PROCEDURElWORK PLAN TITLE:
NO:
PROCEDURE IMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE
- OI n
ARKANSAS NUCLEAR ONE aavision 22 o*Ts u*'e*/*3 V
CHANGE DATE graded to allow a situation to be escalated or de-escalated from one level to another should the severity of the situation change. The four emergency action levels are:
Unusual Event Alert Site Emergency General. Emergency 5.3 Unusual Event - This is the least severe of the four Emergency Action Levels.
It includes those situations which, unless complicated by other factors, pose no harm to the public but for which contact is established with state and federal officials to provide them with current information on unusual events which are occuring or have occurred at ANO.
Typically these situations are brought under control and terminated in less time than it takes to activate the emergency response organization. One of the purposes for this Emergency Action Level is to provide a random, unschedule'd test of the communication link between the plant and state and federal officials.
5.4 Alert - This Emergency Action Level includes those situations for which plant, state and federal officials are notified in order to assure that emergency personnel are available to respond should the
(~}
situation become more serious. These situations, unless upgraded to a more severe Emergency Action Level, pose no harm to the public but confirmatory radiation monitoring by the state may be desired in order to verify that no harm has occurred.
5.5 Site Emergency - This Emergency Action Level includes those situations for which plant, state and federal officials are mobilized so that emergency response centers are manned, and personnel required for evacuation of near site areas are available should the situation become more serious. Situations classified under the Site Emergency Action Level should also be those for which it is prudent to provide early i
I warning to the population within the Emergency Planning Zone so they may be in a state of readiness should the situation become more serious.
5.6 General Emergency - This is the most severe of the four Emergency Action Levels. This Emergency Action Level includes those situations for which plant, state and federal officials are nctified so they may take predetermined protective actions, such as sheltering or evacuation l
of the public, in order to minimize the potential for radiological exposure of the public.
For these situations, early warning is pro-vided to the population within the Emergency Planning Zone so they may be ready to take protective action.
5.7 Emergency Planning Zone (EPZ) - The EPZ considered by this procedure is the Inhalation Zone - that area within approximately a 10 mile radius of ANO.
(
~
5.8 Onsite - The area within the Exclusion Area Boundary.
5.9 Offsite - Those areas not covered by Section 5.7.
gggAgTION:
PROCEDURE / WORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 4 Of DI o/
ARKANSAS NUCLEAR ONE atvision 22 o*TE
- /z /s3 CHANGE DATE 5.10 Technical Support Center - The location within the ANO Administration Building equipped with instrumentation and communication systems and f acilities useful in monitoring the course of an accident; this center is located in the 3rd Floor Conference Room.
5.11 Operational Support Center - The ANO Administration Building; the normal work location for an individual is used as the reporting area in this center with the following exceptions:
5.11.1 Site Engineering Supervisor - Plant Analysis Superintendent's Office.
5.11.2 Radwaste Coordinator - individual's supervisor's office in the Administration Building.
5.11.3 Emergency Team Personnel A.
Evacuation - Main Guard Station (Material Management Personnel); Emergency Control Center [ Secondary Operational Support Center (Training Personnel)]
B.
Fire - 2nd floor conference room
/ )'T
~
C.
Medical - First Aid Room /2nd floor break room L.
D.
Radiation - (onsite team) Maintenance Coordinator's office area ( First Floor Administration Building)
E.
Recovery - same as 5.10.3.D 6.0 UNUSUAL EVENT 6.1 Classification Criteria 6.1.1 Projected summed releases from either unit exceed 1MPC for one hour at the site boundary assuming annual average x/Q.
6.1.2 Abnormal RCS Conditions:
A.
Margin to saturation of the RCS as indicated on margin-to-saturation meters or as calculated is less than 20 F for greater than 5 minutes.
B.
RCS steady-state I dose equivalent activity in excess of the allowable Technical Specification limit.
'C.
Failure of the pressurizer relief valve to re-close after lifting.
I)
D.
Plant transients which result in emergency core cool-ing systems actuation.
I
gggUgTION:
PROCEDURElWORK PLAN TITLE:
NO:
PROCEDURE IMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE D 01 O/
n ARKANSAS NUCLEAR ONE aevision 22 oare u"/zo/63 L/
CHANGE DATE 6.1.3 Ongoing security compromise on site, but outside the Pro-tected Area Security Fence. Attempted entry or sabotage which has been stopped before an Alert, Site Emergency or General Emergency can be declared.
6.1.4 Rapid depressurization of the steam generator secondary sys-tem which results in automatic steam generator secondary isolation.
6.1.5 Reactor shutdown required by the Limiting Conditions for Operation of the unit's Technical Specifications.
6.1.6 Loss of ability to assess off-site radiological doses, or loss of radio communication with off-site agencies.
6.1.7 The occurrence of other unusual events:
A.
Fire in a vital area not under control within 10 minutes.
B.
Aircraft crash onsite.
C.
Train derailment onsite.
D.
Explosion on site resulting in equipment damage and/or personnel injury requiring hospitaliza ion.
(~')
E.
Toxic or flammable gas release onsite or affecting the site which requires a plant evacuation.
F.
Medical emergency which requires transporting a radio-logically contaminated individual from the site to an offsite hospital.
G.
Any tornado causing facility damage.
6.2 Personnel Responsibilities and Required Actions For the Unusual Event Emergency Action Level, the following actions shall be taken by members of the Initial Response Organization, as described in the Arkansas Nuclear One Emergency Plan:
l 6.2.1 shift operations Supervisor A.
Once the Shift Operations Supervisor has determined that the Unusual Event Emergency Action Level should be declared, he shall:
1.
Assure the appropriate procedures are being imple-mented to mitigate the consequences of the Unusual Event.
2.
Implement the Unusual Event Emergency Action Level notifications, and record these notifications as shown on Form 1903.10A of this procedure.
!}
~
\\.-
3.
Continue to monitor plant conditions in order to determine if upgrading to a higher Emergency Action Level becomes necessary.
I gggApgTION:
PROCEDURE / WORK T LAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE O 01 DI O
ARKANSAS NUCLEAR ONE aavision 22 o^te ""/" /""
CHANGE DATE 4.
Direct the activities of the Initial Response Organ-ization (if activated) until relieved by the Duty Emergency Coordinator.
5.
Direct operations personnel and unit operations.
6.2.2 Shift Technical Advisor A.
The Shift Technical Advisor shall assist the Shift operations Supervisor in incident assessment.
6.2.3 Shift Administrative Assistant A.
When directed by the Shift operations Supervisor the Shift Administrative Assistant shall initiate the Un-usual Event Shift Administrative Assistant Notification List and Record, Form 190_3.10B of this procedure. The Shift Administrative Assistant shall also respond to inecming calls to the control room during the incident for notification authentication.
B.
In the absence of the Shift Adminstrative Assistant, the Shift Operations Supervisor shall appoint an in-(,,)
dividual to initiate the Unusual Event Shift Adminis-trative Assistant Notification List and Record. If additional assistance is needed, the Shift operations Supervisor may appoint individuals to assist in per-forming notifications (e.g. the Shift Administrative Assistant from the unaffected unit).
C.
The Shif t Administrative Assistant shall assist opera-tions personnel as directed by the Shif t operations Supe rvisor.
6.2.4 Duty Emergency Coordinator A.
If not on site, and if deemed necessary, the Duty Emer-gency Coordinator may report to the site to direct any necessary emergency response operations, so as to free the Shift operations Supervicor to direct reactor opera-tions.
B.
The Unusual Event Duty Emergency Coordinator Notifi-cation List and Record, Form 1903.10C of this procedure, shall be initiated by the Duty Emergency Coordinator.
C.
At the termination of the event, the Duty Emergency Coor-dinator shall verbally close out the event and prepare a y
written summary. The written summary and all forms,_
y_)
logs, notes, etc. shall be forwarded to the Emergency Planning Coorcinator.
i
gggUgTION:
PROCEDURE / WORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 y
PAGE
/ OI O
ARKANSAS NUCLEAR ONE REVISION 11 DATE U9/20/06
\\'
CHANGE DATE 6.3 Termination or Escalation of Emergency Action Level 6.3.1 The Unusual Event Emergency Action Level may be terminated by the Duty Emergency Coordinator after review of the event and implementation of appropriate corrective action.
6.3.2 The Unusual Event Emergency Action Level may be escalated to a higher Emergency Action Level if the Criteria of Sections 7.0, 8.0, or 9.0 are met.
6.3.3 The Unusual Event Emergency Action Level may be closed out after being terminated by a verbal summary from the Duty Emer-gency Coordinator to offsite authorities who were contacted during the event. All documentation generated from the Un-usual Event shall be handled in acccrdance with Section 5.4 of procedure 1072.004, " Administration of the Emergency Plan and Implementing Procedures".
6.4 Forms 6.4.1 The following forme describe the notifications and records to be made by the appropriate individuals for the Unusual Event Emergency Action Level. Date the form where indicated (if
(')
the date changes before the form is complete, indicate the new date on the appropriate initial / time line). As notifica-tions are completed, initial and time should be placed on the line in the right hand margira by each step.
Other pertinent data (e.g. person contacted) may also be noted adjacent to each step, as appropriate.
6.4.2 Form 1903.10A - Unusual Event Shif t Operations Supervisor Notification List and Record.
6.4.3 Form 1903.10B - Unusual Event Shif t Administrative Assistant Notification List and Record.
6.4.4 Form 1903.10C - Unusual Event Duty Emergency Coordinator Notification List and Record.
(o)
W pgy,ggAgTION:
PROCEDURE / WORK PLAN TITLE:
NO:
PROCEDURE IMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE O OI D/
O ARKANSAS NUCLEAR ONE aavision "
oare uv'eo/*3 CHANGE DATE i
ARKANSAS POWER & LIGHT COMPANY F
Arkansas Nuclear One
! ". ""7
" rur e
--v.cerne r emr recenver
,nm REV #
PC'I' UNUSUAL EVENT Page 1 of 2 SHIIT OPERATIONS SUPERVISOR NOTIFICATION LIST AND RECORD DATE INITIALS / TIME 1.
Unusual Event Emergency Action Levei has been declared
/
based on the following conditions (List):
O 2.
Direct the Shift Technical Advisor to the Control Room.
/
3.
Determine which of the following sections of the Staff Aug-mentation Group are needed, if any, to report onsite to aid in mitigating the consequences of the emergency situation..
(inform the Shift Administrative Assistant of the section(s) that must Le notified):
3.1 Health Physics 3.2 Engineering / Technical Support Section 3.3 None of the above 4.
Direct the designated Shift Administrative Assistant to
/
initiate the notifications specified on Form 1903.10B (the order of notification may be re-arranged as necessary).
Assign / contact personnel to assist, as necessary.
5.
If a radiological release is involved:
C 5.1 Direct appropriate personnel to perform the calcul-
/
ations per 1904.02, "Offsite Dose Projection -
Pocket Computer Method".
CS O
~
-=
b gggUgTION:
PROCEDURDWORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE V OI O/
O ARKANSAS NUCLEAR ONE REVISION 11 DATE UV/40/06 CHANGE DATE ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One TITLE:
EMERGENCY ACTION LEVEL RESPONSE l FORM NO._
1903.10A REV. #
PC #
Page 2 of 2 DATE INITIALS / TIME 5.2 Provide radiological release information to the per-sonnel responsible for making follow-up reports (SAA, TSC, ECC, ETC).
5.3 Direct the implementation of appropriate onsite pro-tective actions.
6.
Direct operating personnel to closely monitor plant para-meters, (particularly those which are associated with the need to escalate to a higher Emergency Action Level).
O 7.
Perform tne duties of the Duty Emergency Coordinator until relieved of those responsibilities (refer to Form 1903.10C).
8.
Maintain a log of the incident (this may be delegated to other personnel as available).
9.
At the termination of the event, this Notification List and Record should be turned over to the Duty Emergency Coordinator.
SHIFT OPERATIONS SUPERVISOR C5 O
-=
b E-
C gw!4{MAMUALgTION:
PROCEDUREN/ORK PLAN TITLE:
NO:
n c.n u r g
PROCEDURE EMERGEHCY ACTION LEVEL RESPONSE 1903.10 PAGE lb or o/
n$a ARKANSAS NUCLEAR ONE aEvisiOu 2 oare
- 'a
"-=
e CHANGE DATE ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One l==
=
azv.,,
wr Page 1 of 2 UNUSUAL EVENT SHIFT ADMINISTRATIVE ASSISTANT NOTIFICATION LIST AND RECORD Date INITIALS /T!?iE 1.
Complete as much of Form 1903.10M, "EAL Notification" as avail-able information and tin.e allows.
NOTE: The order of notification may be rearranged as dictated by the situation with approval of tie Shif t Operations Supervisor.
These groups should be contacted by the most expedient means available (paging, contacting appropriate response center for relaying information, direct phone call, radio contact, etc.).
The phone numbers (plant personnel) provided are for use if an individual is not onsite, the appropriate response center has not been manned, etc.
2.
ProvidetheinitialinfobationonForm 1903.10M to the following groups:
2.1 Duty Emergency Coordinator (a duty roster is maintaiced
/_
in the Control Room area; beeper available; refer to Attachment I for telephone numbers as necessary).
{
2.2 Arkansas Department of Health [*
,J (or contact the
/
OES at
- or via the OES radio channel and request them to nottty the Health Department)]. (This notification is required to be made within 15 minutes of an EAL declaration.)
l 2.3 Staff Augmentation Group (as directed by the Shif t Oper-ations Supervisor); (a duty roaster / call list is main-tained in the Control Room area).
NOTE: The following minimum information should be provided to the section leader: affected unit, EAL declared, app 4opriate plant conditions /param-ters, required response.
2.3.1 Health Physics Section (Beeper available)
/
2.3.2 Engineering / Technical Scpport Section (Eceper
/
available) 2.4 Nuclear Regulatory Commission [ Hotline; or *
/
or 301-427-4056; or Health Physics Network phone (22); or 301-492-7000j.
THE MATERIAL CohTAINED WITilIN fHE SYSTEMS (*) IS PRUPRIETARY OR FRIVAIE INFORMATION.
- ^
p
~
-W Y 4e
r-gg3ppuggTION:
PROCEDURE / WORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 y4 5
i PAGE 11 OE acviSion 1 o^1e u"/zo'o3
'=
C-ARKANSAS NUCLEAR ONE CHANGE DATE p,
ARKANSAS POWER & LIGHT COMPANY rh Arkansas Nuclear One I
s mte EMERCENCY ACTION LEVEL RESPON3E l FORM NO.1903.10B REV. # 7 PC #
Page 2 of 2 DATE INITIALS / TIME 2.5 Emergency Teams requiring immediate response only (refer to the individual attachment for call list if team personnel are not currently on site):
NOTE:
The following minimum information should be provided to the team leader: affected unit, EAL declared, appropriate plant conditions / parameters, required response.
2.5.1 Security Personnel (*
) or Evacuatior.
/
Team (Attachment 2) y 2.5.2 Fire Team (Attachment 3)
/
2.5.3 Medical Team (Attachment 4)
/
NOTE: !f the Health Physics section of the Staff Augmentation Group has been activated, the personnel on the Radiation Team are already being contacted.
2.5.4 Radi tion Team (Attachment 5)
/
2.6 Little Rock Control Center (*
i; or contact
/
either the OES or the MSS Dispatch Center and request them to notify the LRCC).
2.7 General Manager (*
')
/
2.8 NRC Resident Inspectors (either one):
/
2.8.1
- J.
Cummins t
/
2.8.2
- L.J. Callan Provide updates, as necessary, to the fo'llowing groups:
3.1 Duty Emergency Coordinator 3.2 Nuclear Regulatory Comission (Include all available radiological C
release information) 3.3 Arkansas Department of ifealth 3.4 Little Rock Control Center 4.
At the termination of the event, this fonn and other applicable information should be turned over to the Oaty Emergency Coordinator.
s_.
Shaft Administrative Assistant THE MATERIAL CONfAihED WITillN TiiE SYMBOLS (*) IS PEOPRIETARY OR FRIVATE INFORMATION.
Ar
.4
- - - - - - ~ ' ~ ~ '~~
T s
r.
gggguygTION:
PROCEDUREN/ORK PLAN TITLE:-
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 g
PAGE 14 or os g
M-ARKANSAS NUCLEAR ONE aevision 22 o^Te " '
CHANGE DATE ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One M EMERCENCY ACTION LEVEL RESPONSE l FON Na 1901.10C REV. # /
PC #
UNUSUAL EVEhT Page 1 of 2 DLTTY EMERGENCY COORDINATOR NOTIFICATION LIST AND RECORD DATE INITIALS / TIME 1.
Notified that an Unusual Event Emergency Action Level has
/
been declared, based on the following conditions (List):
2.
If on-site, or if deemed'necessary to report to site,
/
record the tire that the Shif t Operations Supervisor was relieved of Duty Emergency Coordinator responstbilities.
3.
If a radiological release is involved:
3.1 Relieve the Shif t Operations Supervisor of respon-
/
sibilities for calculating offsite dose projections.
4 Provide updates to the following groups, as necessary:
4.1 General Manager *.
4.2 NRC Resident Inspector (initially contacted) l (Include all available radiological release information) 4.2.1 eJ. Cummins 1*
4.2.2
- L.J. Callan i*
L-5.
At the termination of the event, provide a verbal summary to:
l 5.1 Nuclear Reg'alatory Commission (Hotline; l
or *
- )
/
/
5.2 Arkansas Department of Health *(
s__.
[
TllE MATERI AL CONTAINED WITHIN 111E SYMBOLST*T IS PROPRIETARY l
OR PRIVATE INFORMATION.
l
[
e 1
l
~ '[f <
f['.'f'}-[y W ~u
r--
[jpg3p{gUgyTION:
PROCEDURE / WORK PLAN TITLE:
NO:
t (
PROCEDURE E!!ERGEf1CY ACTIOll LEVEL RESPO!:SE 1903.10 PAGE 13 Of O#
~
w Ea-ARKANSAS NUCLEAR ONE aevision 2
oare uv/z /oe CHANGE DATE ARKANSAS POWER & LIGHT COMPANY
,II Arkansas Nuclear One m
TITLF r.,r o cry, u,., ~,, r, r, lF W NO.,n,,
c r e o ~,e e REV. #
- 1) PC #
Page 2 of 2 DATE INITI AL5 /TII'E I6.
Provide a written sw: nary of the event to the Emergency Planning Coordinators.
~Id55EU~C'[~C66N6]IlliCR D U T'a' L e
l c=
CT Y-D
(
ggg)$gTION:
PROCEDUREAVORX PLAN TITLE-NO:
f PROCEDURE EMERGENCY ACTION LEVEL RESPOW3E 1903.10 PAGE 24 01 D#
/1 i
C2 ARKANSAS NUCLEAR ONE atvision 22 o^te ""/ x / * '
CHANGE DATE 7.0 ALERT 7.1 Classification Criteria 7.1.1 Projected summed releases from either unit exceed 10 times MPC for one hour at the site boundary assuming annual average x/Q.
7.1.2 Abnormal RCS conditions:
A.
Margin to saturation of the RCS as indicated on in-stalled instrumentation or as calculated is less than 20 F for 10 minutes with no indication for immediate recovery.
131 B.
RCS I dose equivalent activity is greater than 100 pCI/gm.
a C.
RCS leakage is greater than normal makeup capacity.
D.
Inability to make or maintain the reactor subcritical when intended.
I 7.1.3 Ongoing security threat within the protected area security fence, but outside of plant buildings.
7.1.4 Evacuation of the control Room required.
7.1.5 Loss of all redundant means of core cooling.
7.1.6 All safety-related annunicators lost for more than 5 minutes when above cold shutdown.
7.1.7 The occurrrence of other unusual events:
A.
Earthquakes resulting in 0.lg trigger alarms actuation.
(Refer to Attachment 9, " Emergency Telephone Numbers".
B.
Lake Dardanelle level is greater than or equal to 350' (above sea level).
7.1.8 Radiation levels at two or more area radiation monitors in the Reactor Building increase by 2,000 mR/hr, or radiation levels at two or more area radiation monitors in the Auxi-liary Building or the Fuel Building increase by 100 mR/hr due to a, severe degradation in the control of radioactive materials.
Q'fJg8gAgTION:
PROCEDURE / WORK PLAM TITLE:
RO:
)
PROCEDURE EMERGENCY ACTION LEVEL RESPCNSE 1903.10 PAGE lb of 6/
ARKANSAS NUCLEAR ONE aevision 22 oa's o*/z '"5 CHANGE DATE 7.2 Personnel Responsibilities and Required Actions Responsibility for notification and Protective Action Recommendations shall be transferred from (1) the Shift Supervisor (acting as the Duty Emergency Coordinator) to (2) the Duty Emergency Coordinator to (3) the Recovery Manager to (4) the Incident Response Director. This transfer shall be accomplished only after a formal turnover has been completed and documented by a log entry.
For the Alert Emergency Action Level, the following actions shall be takgn by members of the Initial Response Organization, as defined in the ' Arkansas Nuclear One Emergency Plan:
7.2.1 shift Operations Supervisor A.
Once the shift Operations Supervisor has determined that the Alert Emergency Action Level should be placed into effect, he shall:
l.
Assure the appropriate procedures are being imple-mented to mitigate the consequences of the unusual plant conditions.
2.
Implement the Alert Emergency Action Level notifi-cations, and record these notifications as shown on Form 1903.10D of this procedure.
3.
Continue to monitor plant t2nditions in order to determine if upgrading to a higher Emergency Ac-tion Level becomes necessary, 4.
Direct the activities of the Initial Response Organization until relieved by the Duty Emergency coordinator.
5.
Direct Operations personnel and unit operations.
7.2.2 Shift Technical Advisor A.
The Shif t Technical Advisor shall assist the shift Operations Supervisor in incident assessment.
l Shift Administrative Assistant 7.2.3 A.
When directed by the Shift Operations Supervisor, the Shif t Administrative Assistant shall initiate the Alert Shift Administrative Assistant Notification List and Record, Form 1903.10E of this procedure. The Shift Administrative Assistant shall also respond t,o incoming calls to the control room during the incident.
a
[,,1.g'gu$gTION:
PROCEDUREN/ORK PLAMllTLE:
RO:
{
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10
~
))
PAGE 16 or b/
r ARKANSAS NUCLEAR ONE aevision 21 oaTE u9/z6/o*
CHANGE DATE B.
In the absence of the Shif t Administrative Assistant, the Shift Operations Supervisor shall appoint an individual to initiate the Alert Shift Administrative Assistant Notification List and Record.
If additional assistance is needed, the Shift Operations Supervisor may appoint individuals to assist in performing notifi-cations (e.g. the Shift Administrative Assistant from the unaffected unit).
C.
The Shift Adminstrative Assistant shall assist operations personnel as directed by the Shift operations Supervisor.
7.2.4 Duty Emergency Coordinator A.
If not on site, the Duty Emergency Coordinator shall report to the site when notified of an Alert. He shall direct emergency re,sponse operations so as to free the Shift operations Supervisor to oversee reac-tor operations.
B.
The Duty Emergency Coordinator shall initiate the Alert Duty Emergency Coordinator Notification List and Record, Form 1903.10F of this procedure.
7.2.5 Emergency Response Team Leaders A.
The Emergency Response Team Leaders or Alternates are notified by the Shif t Administrative Assistant that an Alert has been declared.
B.
For situations requiring the support of a particular Emergency Response Team, the Team Leader or Alternate shall be requested to call out and assemble the team.
The Team Leader or Alternate shall report to the Duty Emergency Coordinator when the team is assembled.
C.
For situations not requiring the immediate support of an Emergency Response Team, the Team Leader or Alter-nate shall contact the other team members and appraise them of the situation. The team members shall remain on call until notified that the Emergency Action Level has been terminated.
7.3 Termination or Escalation of Emergency Action Level 7.3.1
.The Alert Emergency Action Level may be de-escalated to a lower Emergency Action Level or be terminated by recovery from the event.
7.3.2 The Alert Emergency Action Level may be escalated to a higher Emergency Action Level if the criteria of Sections 8.0 or 9.0 is met.
gggAgTION:
PROCEDURE / WORK PLAN TITLE:
NO:
PROCEDURE ENERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 1/ OI b/
O ARKANSAS NUCLEAR ONE aavision 22 oa's "" '*"
CHANGE DATE 7.3.3 The Alert Emergency Action Level may be closed out after being terminated by a verbal summary to offsite authorities who were contacted during the event. All documentation generated from the Alert shall be handled in accordance with Section 5.4 of procedure 1072.004, " Administration of the Emergency Plan and Implementing Procedures".
7.4 Forms 7.4.1 The following forms describe the notifications and records to be made by the appropriate individuals for the Alert Emergency Action Level. Date the form where indicated (if the date changes before the form is complete, indicate the new date on the appropriate initial / time line). As notifi-cations are completed, initials and time should be placed on the line,in the right hand margin by each step. Other pertinent data (e.g. person co.ntacted) may also be noted adjacent to each step, as appropriate.
7.4.2 Form 1903.10D - Alert Shift Operations Supervisor Notifi-cation List and Record.
7.4.3 Form 1903.10E - Alert Shift Administrative Assistant Notifi-()
cation List and Record.
7.4.4 Form 1903.10F - Alert Duty Emergency Coordinator Notification List and Record.
(~1 m
I
m i
gggUgTION:
PROCEDUREIWORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 10 OI O#
O ARKANSAS NUCLEAR ONE aevision 22 oare
"#'<a'*'
V CHANGE DATE i
l i
l ARKANSAS POWER & LIGHT COMPANY l
Arkansas Nuclear One
\\ ~*
_g. r-
~,. _.-.. -,,~,,,,, -- - -
i ALERT Page 1 of 2 SHIFT OPERATIONS SUPERVISOR NOTIFICATION AND RECORD DATE INITIALS / TIME 1.
The Alert Emergency' Action Level has been declared based
/
on the following conditions (List):
O 2.
Direct the Shift Technical Advisor to the Control Room.
/
3.
Determine which of the following sections of the Staff Aug-mentation Group are needed, if any, to report onsite to aid
- in mitigating the consequences of the emergency situation (inform the Shift Administrative Assistant of the section(s) that c:ust be notified):
3.1 Health Physics 3.2 Engineering / Technical Support Section 3.3 None of the above 4.
Direct the Shift Administrative Assistant to initiate the
/
the notifications specified on Form 1903.10E (the order of notifications reay be rearranged as necessary). Assign /
contact personnel to assist, as neces ary.
5.
If a radiological release is involved (unless previously relieved of this responsibility):
CT 5.1 Direct appropriate personnel to perform the calcul-
/
ations per 1904.02, "Offsite Dose Projection -
Pocket Computer Method" 5.2 Provide radiological release inform tion to the per-sonnel responsible for making follow-up reports (SAA, c=
O
-=
m gggUgTION:
PROCEDURE / WORK PLAN TITLE:
NO:
PROCEDURE
?!!ERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE IV OI Ol m)
O ARKANSAS NUCLEAR ONE aevisioN 22 o*TE uv/za/63 CHANGE DATE ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One I'I* EMERGENCY ACTION LEVEL RESPONSE l FOW NO. 1901.10D REV. # 8 PC f Page 2 of 2 DATE INITIALS / TIME 5.3 Direct the implementation of appropriate onsite pro-tective actions.
6.
Direct the Facilities Maintenance Coordinatbr (D. Moore or
/
Bobby Cole; see Attachment 8) to activate the Emergency Control Center.
7.
Notify onsite personnel that an Alert has been declared and
/
describe the nature of the alert.
8.
Direct operating personnel to closely monitor plant para-O meters (particularly those identified with the need to escalate to a higher Emergency Action Level.)
9.
Perform the duties of the Duty Emergency Coordinatcr i.ntil relieved of those responsibilities (refer to Form 1903.10F).
- 10. Maintain a log of the incident (this may be delegated to '
other personnel as available).
- 11..At the termination of the Emergency Action Level, this Notification List and Record should be turned over to the Duty Emergency Coordinator.
~
- Sit!FT OPERATIONS SUPERVISOR E.::
~~
C5 O
~
-=
k
er I
gggUggTION:
PROCEDUREfNORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 4U OI 0#
a P
ARKANSAS NUCLEAR ONE aEvision
- 2 o^Te ""/ "*/ 6 >
CHANGE DATE ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One N
..eeer.,~ 3 ~ ~r,e,yr, lFORmANO.
r e r e t,~,e r REV. #Il PC f ALERT Pagt 1 of 4 SHIFT ADMINISTRATIVE ASSISTANT NOTIFICATION LIST AND RECORD DATE INITIALS / TIME 1.
Complete as much of Form 1903.10M, "EAL Notification" as avail-able information and time allows.
J NOTE:
The order of notification may be rearranged as the situation dictates with approval of the Shif t Operations Supervisor.
These groups should be contacted by the m_ost expedient means i
available (paging, contacting appropriate response center for j
relaying information, direct phone call, radio contact, etc.).
J The phone numbers (plant personnel) provided are for use if an individual is not ensite, the appropriate response center has not been manned, etc.
2.
Provide the initial information on Form 1903.10M to the following
)
groups:
2.1 Duty Emergency Coordinator (a duty roster is maintained in
/
the Control Room area; beeper available; refer to Attach:hent 1 for telephone numbers as necessary).
2.2 Arkansas Department of Health [*661-2136* or contact '
/
the OES (+374-120l*) or use the OES radio channel] and request them to notify the Health Department. (This noti-fication is required to be made within 15 minutes of an EAL declaration.)
2.2.1 If a decision is made by the Arkansas Department of Health to activate the Early Warning System, the SAA will receive the following message via telephone:
"This is I am the Arkansas D=partment of Health Staf f Duty Officer for the week.
I a.4 requesting that you disable the emergency radio repeater on Mt. Nebo in order to allow activation of the Early Warning System. Please standby for notification of completion of system activation."
1 Ensure that the Unit 1 Master Radio Console is I
(
selected to Channel 3 and then depress the push-I butten switch labeled " repeater" The SAA should maintain an open line of telephone communication with the Staff Duty Officer until the following i
message is received u
" Activation is complete, return system to prior l
status".
/
THE MATERIAL CONTAINED WITHIN THE SYMBOLS (*) IS FROPRIETARY CA PRIVATE INFORMATION.
O
-=
E
{y
[
m,
w
r.
%ANIM.mU A' e.CTIOM:
PROCEDURE / WORN PLAN TITLE:
NO:
Encnut.m t r na j
{
PROCED'a RE EMERGENCY ACTION LEVEL RESPONSE 1903.10
.i PAGE 21 or o/
. n e="
it oA1E use zof u.s
-t CHANGE DATE 7
ARKANSAS POWER & LIGHT COMPANY E
Arkansas Nuclear One Ele n,_
lFOWNo.,
TittE: g, REV. #11 FC #
Page 2 of 4 DATE INITIALS / TIME 2.3 Staf f Augmentation Group (as directed by the Shif t Oper-ations supervisor): (a duty restar/ call list is main-tained in the Control Room area).
NOTE:
The following m.nimum information should be provided to the team leader-affected unit. EAL decla red, ap-propriate plant ccnditions/ parameters, requtred response and suggested protective acticns (if necessary).
2.3.1 Health Physics Section (Beeper available)
/
2.3.2 Engineering / Technical Suppor* Section (Beeper
/
available) 2.4 Nuclear Reculatory Commission [ Hotline; or =
/
or Health Physics Network phone or
- ].
2.5 Emergency Teams requiring imediate respense (refer to
/
the indicated attachment for call out list if team personnel are not currently on site.)
NOTE:
.The following minimu.m infermatien should be provided to the team leader: affected unit. EAL declared, appropriate plant conditions / parameters. required response and suggested protective actions (if necessary).
2.5.1 Evacuation Team (Attachment 2)
/
2.5.2 Fire Team (Attachment 3)
/
2.5.3 Medical Team (Attach.w nt 4)
/_
NOTE:
If the Health Physics / Radiochemistry section of the Staf f AuTrentation Group has been Cr activated, the persor.nel on the Radiation Team are already being contacted.
2.5.4 Radiation Team (Attachment 5)
/
THE MATERII.L CCtJTAI::ED WITHIN THE SY:20L5 (=) IS FROPRIETARY CR FRIVAIE INFCFCATICN.
w..
6 e.
h
-~ ~
l
-1 gg!gutgpTIOM:
PROCEDURE / WORK PLAN TITLE:
NO:
j PROCEDURE 1:MERGENCY ACTION LEVEL RESPON9E 1903.10 44 OI D #
PAGE f
~- -
aevi= ti oars u"/<o l G
ARKANSAS NUCLEAR ONE CHANGE DATE ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One l FORM NO.
M rs re er..c..
3 ry ru e r.f e r ercer..ee REV. #11 PC #
Page 3 of 4 DATE INITIALS / TIME 2.6 Operations Management (contact one of the following
/
individuals):
2.6.1
- B. A. Baker 2.6.2
- S. J. McWilliams
'e 2.6.3
- R. P. Wewers 2.7 Little Rock Control Center (*
!*; or contact
/
either the OES or the MSS Dispaten Center and request them to notify the LRCC).
2.8 Emergency Teams not requiring immediate response (refer to the indicated attachment for call list team persormel are not currently onsite):
NOTE:
The following minimum information' should be provided to the team leaders affected unit, EAL daclared, appropriate plant conditions / parameters, time team placed "on call."
2.8.1 Evacuation Tear. (Attachment 2)
/
/
2.8.2 Fire Team (Attachment 3) 2.8.3 Medical Team (Attachment 4)
/
2.8.4 Radiation team (Attachment 5)
/
m 2.9 General Manager *
/
2.10 NRC Resid-nt Inspectors (either one)
/
2.10.1
- J. Curt-ins I
Cr 2.10.2 L.J. Callan og
).
3.
Notify the Duty Emergency Coordinator that the initial
/
notifications have been made (inform him of any individuals that contact could not be made with).
i THE 11ATERI AL CONTAI!JED WITHIN THE SY!:BOLS (*) IS FR0iRl'ETAU CFi~PRil5IE IfEiii3fl0iC
~
^~
c7 l
l l
l wr i
?
I
- - - - - ^ - -
u.
!e g
CA#
-./
M4
j m
gggUygTION:
PROCEDURE / WORK PLAN TITLE:
N O-PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 AJ ON O'
PAGE O
ARKANSAS NUCLEAR ONE aevisia "
o^Te "' am CHANGE DATE ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One M
..ce-e.,m s m e.y,rer, l FORM NO., _,
r ti re r,r.,e r j
REV. #11 PC #
Page 4 of 4 t
4.
Provide updates to the following groups until relieved of this responsibility:
4.1 Duty Emergency Coordinator 4.2 Nuclear Regulatory Commission (Include all available radiological release informatien) 4.3 Arkansas Department of Health (at least hourly or as directed) 4.4 Little Rock Control Center (unless otherwise directed) 5.
Unless required to report onsite, at the termination of the
/
event, notify the individua:s contacted in Step 2.8 above to secure from "on call" status.
6.
At the termination of the event, this form and other applicable information should be turned over to the Duty Emergency Coordinator.
Shif t Administrative Assistant i
e
-e 1
I 1
C5 O
-=
k m.g -
r-gggApglON:
PROCEDURETWORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPO!!SE 1903.10 F
PAGE M 01 0/
O ARKANSAS NUCLEAR ONE aevisiON 11 oarE o9/z6/63 CHANGE DATE y
ARKANSAS POWER & LIGHT COMPANY E
Arkansas Nuclear One N
l FORM NO.,
ewcome.m n, vmr, eyer er m.gr REV. #10 PC f ALERT Page 1 of 2 DUTY EMERGENCY COORDINATOR NOTIFICATION LIST AND RECORD DATE INITIALS / TIME 1.
Notified that an Alert Emergency Action Level has been
/
declared, based on the following conditions (list):
2.
Record tima tn t the Shift Operations Supervisor was
/
relieved of the following Duty Emergency Coordinator responsibilities:
2.1 Providing direction to the emergency response personnel.,
2.2 Calculating offsite dose projections.
2.3 Ferforming follow-up notifications to the following groups:
2.3.1 Nuclear Regulatory Commission (Include all available radiological release information) 2.3.2 Arkansas Department of Health (unless other-vise directed) 2.3.4 General Manager.
3.
Dispatch individual to the National Guard Armory to act as the TOCC Liasion with the Department of Health.
)
C 3.1 Refer to Attachment 8, " Technical / Advisory Personnel
/
Roster / Call List".
4.
If deemed necessary, activate the Technical Support Center
/
staff (refer to Attachment 6 for call list as necessary).
5.
If deemed necessary, activate the Operational Support
/
Center staff (refer to Attachment 7 for call list).
c3 THE MATERIAL CONTAINED WITHIN THE SYMBOLS (*) IS FROFRIETARY OR FRIVATE INFOR!!A-
~
TION.
M 4
gy --
-aM
r gggUgpTION:
PROCEC8.1E/ WORK PLAN TITLE-NO:
PROCEDURE 1:MERGENCY ACTION LEVEL RESPONSE 1903.10 y
PAGE D 01 D/
(~)
ARKANSAS NUCLEAR ONE aevision 22 oare u*/z*/83 CHANGE DATE m
ARKANSAS POWER & LIGHT COMPANY g
Arkansas Nuclear One N
l FORM NO.,
eureceirm n -e n.7 y et.e, c e c e -..e e REV. #11 PC #
Page 2 of 2 DATE INITIALS / TIME 6.
If deemed necessary, assign personnel to perform the
/
following duties 6.1 Man open phone links between the Control Room and the Technical Support Center (refer to Attachment 8).
6.2 Man the Secondary Technical Support Center, if *ctivated (QA personnel to be used as communicators: refer to, " Emergency Control Center Communications Personnel Roster / Call List").
6.3 Man the Training Center Switchboard and the ANO Plant
(/
Switchboard (contact M. K. Bishop per Attachment 7).
6.4 Update statts boards.
6.5 Perform offsite dose projections.
6.6 Other duties as necessary to support the incident i
response.
7.
Updatr the Control Room periodically on the status of personnel reporting onsite or emergency response centers being activated.
8.
Ac the termination of the event, the following summaries shall be provided:
i 8.1 A verbal summary to:
8.1.1 Nuclear Regulatory Commission
/
8.1.2 Arkansas Department of Health g7 8.2 A written summary of the event to the Emergency Planning Coordinators.
j Duty Emergency Coordinator C5 O~
~
~=
E"
( w __ - - -
ggggTION:
l PROCEDURE / WORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 40 01 Ol O
ARKANSAS NUCLEAR ONE aevision 22 o^re u"/z '63 CHANGE DATE 8.0 SITE EMERGENCY 8.1 Classifications Criteria 8.1.1 Projected summed off-site dose rates from either unit exceed 50mR/hr whole body or 150 mR/hr thyroid dose rate assuming actual meteorological conditions.
8.1.2 Installed instrumentation or as calculated indicates the RCS is in a saturated condition.
8.1.3 Ongoing security threat within plant buildings, but not within the Control Room or vital areas.
8.1.4 Evacuation of the Control Room required and control of systems required for maintaining the unit in a safe condition cannot be establishe,d.
8.2 Personnel Responsibilities and Required Actions Responsibility for notification and Protective Action Recommendations shall be *ransferred fron. (1) the Shif t Supervisor (acting as the Duty Emergency f_s Coordinator) to (2) the Duty Emergency Coordinator to (3) the Recovery
( )
Manager to (4) the Incident Response Director. This transfer shall be accomplished only after a formal turnover has been completed and documented by a loc entry.
1 For the Site Emergency Emergency Action Level, the following actions l
shall be taken by members of the Initial Response Organization and l
the Emergency Response Organization, as defined in the Arkansas Nuclear One Emergency Plan:
8.2.1 Shift Operations Supervisor A.
Once the Shift operations Supervisor has determined that the Site Emergency Emergency Action Level should be placed into effect, he shall:
1.
Assure the appropriate procedures are being imple-mented to mitigate the consequences of the unusual plant conditions.
2.
Implement the Site Emergency Emergency Action Level notifications, and record these notifications as shown on Form 1903.10G of this procedure.
3.
Continue to monitor plant conditions in order to determine if upgrading to a higher Emergency Action
,y Level becomes necessary.
- %,I
~
I 4.
Direct the activities of the Initial Response Organ-ization until relieved by the Duty Emergency Coor-dinator.
gggugTION:
PROCEDURE / WORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 4/ or o/
O ARKANSAS NUCLEAR ONE Taavision ii o^Te u';/ zo / os CHANGE DATE 5.
Direct operations personnel and unit operations.
S.2.2 Shift Technical Advisor A.
The Shift Technical Advisor shall assist the Shift Operations Supervisor in incident assessment.
8.2.3 Shift Administrative Assistant A.
When directed by the Shift operations Supervisor, the Shift Adminstrative Assistant shall initiate the Site Emergency Shif t Administrative Assistant Notification List and Record, Form 1903.10E of this procedure. The Shift Administrative Assistant shall also respond to incoming calls to the control room during the incident.
B.
In the' absence of the Shift Administrative Assistant, the Shift operations Supe'rvisor shall appoint an in-dividual to initiate the Site Emergency Shift Admin-istrative Assistant Notification List and Record.
If additional assistance is needed, the shift operations Supervisor may appoint individuals to assist in per-forming notifications (e.g. the Shift Administrative (s)
Assistant from the unaffected unit).
C.
The Shift Administrative Assistant shall assist opera-tions personnel as directed by the Shift operations Supervisor.
8.2.4 Duty Emergency Coordinator A.
If not on site, the Duty Emergency Coordinator shall l
report to the site when notified of a Site Emergency.
i He shall direct emergency response operations so as I
to free the Shift operations Supervisor to oversee re-l actor operations.
B.
The Duty Emergency Coordinator shall initiate the Site Emergency Duty Emergency Coordinator Notification List and Record, Form 1903.101 of this procedure.
1 C.
If a radioloyical release is involved, the Duty Emer-l gency coordinator shall direct the implementation of l
appropriate onsite protective actions, and shall pro-vide offsite raclological assessment information to j
offsite authorities responsible for implementing off-i site emergency measures.
7-8.2.5 Emergency Response Team Leaders L./
A.
The Emergency Response Team Leaders or Alternates are l
notified by the Shif t Administrative Assistant that a Site Emergency has been declared.
gggUgpTION:
PROCEDURElWORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 40 01 O#
O ARKANSAS NUCLEAR ONE aEvision 2 o*Ts "*'"
'"3 CHANGE DATE B.
The Emergency Response Team Leader or Alternates shall call out and assemble the teams. The Team Leader or Alternate shall report to the Duty Emergency Coordi-nator when the team is assembled.
8.2.6 Incident Response Director A.
The Incident Response Director is notified by the Little Rock Control Center that a Site Emergency has been declared.
B.
The Incident Response Director shall report to the Emergency Control Center when notified that a site Emergency has been declared.
C.
The Incident Response Director shall activate the General Office portions o_f the Emergency Response organization, as needed.
8.2.7 Recovery Manager A.
The Recovery Manager is notified by the Shift Admin-istrative Assistant that a Site Emergency has been
(,j declared.
B.
The Recovery Manager shall immediately report to the Onsite Technical Support Center when notified that a Site Emergency has been declared.
8.2.8 operations Manager A.
The operations Manager is notified by the Shift Ad-ministrative Assistant that a Site Emergency has been declared.
B.
The operations Manager shall immediately report to the Onsite Technical Support Center when notified that a Site Emergency has been decle. red.
8.2.9 Maintenance Manager A.
The Maintenance Manager is notified by the Shift Ad-ministrative Assistant that a Site Emergency has been declared.
.B.
The Maintenance Manager shall immediately report to the Onsite Technical Support Center when notified that a Site Emergency has been declared.
rw C
g g g Ap g T10N:
PROCEDURElWORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 49 or o/
O-ARKANSAS NUCLEAR ONE aavision ii o*Ta o9/zo/a3 CHANGE DATE 8.2.10 Operations Superintendents A.
The operations Superintendent are notified by the Shift Administrative Assistant that a Site Emergency has been declared.
B.
The Operations Superintendents shall immediately re-port to the Control Rooms of their respective Units and inform the Onsite Technical Support Center of his presence in the Control Room.
8.2.11 Health Physics Superintendent and Technical Analysis Superintendent A.
The Health Physics Superintendent and Technical Analy-sis Superintendent are notified by the Shift Administra-tive Assistant that a Sit.e Emergency has been declared.
B.
The Health Physics Superintendent and Technical Analy-sis Superintendent shall immediately report to the Onsite Technical Support Center when notified that a Site Emergency has been declared.
()
8.2.12 Nuclear and Engineering Support Superintendent A.
The Nuclear and Engineering Support Superintendent is notified by the Shift Administrative Assistant that a Site Emergency has been declared.
B.
The Nuclear and Engineering Support Superintendent shall immediately report.to the Onsite Technical Support Center when notified that a Site Emergency has been declared.
l l
8.2.13 Maintenance Superintendents i
A.
The Maintenance Superintendents are notified by the l
Shift Administrative Assistant that a Site Emergency has been deciared.
l B.
The Maintenance Superintendents shall immediately report to the Onsite operational Support Center when notified that a Site Emergency has been declared.
8.3 Termination or Escalation of Emergency Action Level l
8.3.1 The Site Emergency Emergency Action Level may be de-escalated
)
to a lower Emergency Action Level or be terminated by recovery l
rN.
from the event.
i
(,/
8.3.2 The Site Emergency Emergency Action Level may be esca-lated to a General Emergency Emergency Action Level if the criteria of section 9.0 is met.
i 6
I 1
gggu$gTION:
PROCEDURE / WORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVFL RESPONSE 1903.10 PAGE JU 01 0'
O ARKANSAS NUCLEAR ONE aevision i oare
""/e /**
'd CHANGE DATE 8.3.3 The Site Emergency Emergency Action Level may oe closed out after being terminated by a briefing by the Inci-dent Response Director to the appropriate offsite authorities. All documentation generated from the Site Emergency shall be handled in accordance with Section 5.4 of procedure 1072.004, "A sinistration of the Emergency Plan and Implementint, Procedures".
8.4 Forms 8.4.1 The following forms describe the notifications and records to be made by the appropriate individuals for the Site Emer-gency Emergency Action Level. Date the form where indicated (if the date changes before the form is complete, indicate the new date on the appropriate initial / time line). As notifications are completed, initials and time should be placed on the line in the right hand margin by each step.
Other pertinent data (e.g. person contacted) may also be noted adjacent to each step, as appropriate.
8.4.2 Form 1903.10G - Site Emergency Shif t operations Supervisor Notification List and Record.
(")
8.4.3 Form 1903.10H - Site Emergency shift Administrative Assistant Notification List and Record.
8.4.4 Form 1903.10I - Site Emergency Duty Emergency Coordinatot Notification List and Record.
{
/%
s'
O PLAur un utimi wTION:
PROCEDURE / WORK PLAN TITLE:
NO:
LIiERGt. ULT YEnn PROCEDURE IMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE di Of 0/
O ARKANSAS NUCLEAR ONE aavision 11 o^TE o*/ 6/63 CHANGE DATE ARKANSAS POWER & LIGHT COMPANY F
Arkansas Nuclear One l 'oa" ' o - -
rm,- -,-.,r,r er
.e.
REV. # 7 PC'i SITE EMERGENCY Page 1 of 2 SHIFT OPERATIONS SUPERVISOR NOTIFICATION LIST AND RECORD DATE INITIALS / TIME TheSiteEmergencyNergencyActionLevelhas,beendeclared
/
1.
based on the following conditions (List):
O 2.
Direct the Shif t Technical Advisor to the Control Room.
/
3.
Direct the Shift Administrative Assistant to initiate the
/
notifications specified on Form 1903.10H (the order of notifications may be rearranged as necessary). Assign /
contact personnel to assist as necessary.
4.
If a radiological release is involved (unless previously relieved of this responsibility):
4.1 Direct appropriate personnel to perform the calcul-
/
lations per 1904.02, "Offsite Dose Projection -
Pocket Computer Method".
4.2 Provide radiological release information to the per-sonnel for making follow-up reports (SAA, TSC, ECC, etc.).
' 4.3 Direct the implementation of appropriate onsite protective actions (unless previously relieved of g
this responsibility).
4="5 G
w=
5 W
L a-
.. _. _ ~
m ggguggTION:
PROCEDURE / WORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE M 01 0/
O ARKANSAS NUCLEAR ONE REvislON 11 DATE U9/Zo/63 CHANGE DATE r [i]
ARKANSAS POWER & LIGHT COMPANY Q
Arkansas Nuclear One F
E5frRCENCY ACTIOV LEVEL PFSPONSE l MW Na yggg jpg REV. f 5 PC #
Page 2 of 2 DATE INITIALS / TIME 5.
Notify onsite personnel that a Site Emergency has been
/
declared, and describe the nature of the emergency.
6.
Direct operating personnel to closely monitor plant para-meters (particularly those identified with the need to escalate to a General Emergency Emergency Action Level).
7.
Petform the duties of the Duty Emergency Coordinator until relieved of those responsibilities (refer to 1903.101).
O Maintain a log of the incident (this may be delegated to 8.
other personnel as available).
9.
At the termination of the Emergency Action Level, this Notification List and Record should be turned over to the Recovery f;anager.
SHIFT OPERATIONS.iUPERVISOR I
e C5 O
-=
L L _- -
N
t j T L a *4 7 6 '
g ;;.
J. :.
ii f L V-
} y;-$l' i b-p.-
. :_ ; ACl10!! iFVfi IU. i FO'i Y
}'*
,li-42
PA:
-l R:"'
/.t.
- f.. ;. n c2' A_' y t.
hi u
e-rij <.6,
--u:
, : :n p; pa n:,a 1 '. t. O ;
t ni
- r. '
t - 64.
. s.
s
~
i
. C h ;'
U: (
jt-
[, 0, ' '
'[*O {IC C';-i b k.(*$'j'C h>'
s..
i,.,' > 3 :
e s,. i r,. e,.,
.e,
- p. 6 L
- w..
l h-l' e
1 3:
~~)i F.:_
l SJ E
" 4 -: A-c si.,
NC C C sI!.
L H i' A5:) Mm D.'
i 1
i y
r i
l a
N',
ir.
- i. x ce t-3,,
11 o f ti I t.,
- 5.. c.
.I'< 1 '
i, c
3 re f
re l.
r,'
i i
ir
{
IFr,'
(-
')
a i
a t
2 icos th-t i
.1 inf 1,
c.,
15
. t 5 fm !'
t
(.,
L')
t e, is 2.!
f,- ' y C.,
s s
tl e Shif*.
. >' s o f fi c e), i f na vn-sit -
e t,.
. 1 <, -..,t. a -
3 i
l
\\ it
)
acs < <. s ' e l
l l
r3y be s
- 2 4
l
?
l 2?
A-P' tr crP-l ' '-
t s
tt-(a or y
-J. '(1<
l r.
- f t'
aei '
D-ut s
f r,
e s
't3 E.
,t 15 4
at
)
)
1 2.?.I It, J-is or 3;
ti t'
- + te' S t.
" Tai Ia'"-
A D',:r*
if f it -
far th-6 I am r et.
- ta t
cf r.
r e. ;.
n T e '.
Iva i-g _-
of V-P!
t,o utn..
a.'
r
\\>
~1 ai '?
O 3
f h5 L'
$t l
.(e.]
t j ('
r
. ! ]
3,'
([. if g gj 4 i t}s e 73 5 '
g b ;t t
- v.'
' " r +, 71 t e r '
11
'1' e'
]
n i
i i.
A c t i v.. ' -
is (.:
r-
'i s).
ta ptia*
/
sta: u
[I ".
b'4 : \\i U-M.'
.*; IS'l.s il "i LH I! ', i -
s
"[
~
'w-
e~
fL6*4
""UAL " TION:
PROCEDURE / WORK PLAN TITLE:
NO:
mRA v 1 r nn
[
PROCEDURE mERGEf1CY ACTIOf! LEVEL RESPOJSE 1903.10 J
PAGE N Of
/
ARKANSAS NUCLEAR ONE aevision 11 oa1E w/ 2e/ e CHANGE DATE ARKANSAS POWER & LIGHT COMPANY ryd 6
/
Arkansas Nuclear One 113
!F N-c.wrwv m m vem rern.wr sm,-
REV. # 11 PC #
SITE EMERGENCY Page 1 of 4 SHIFT ADMINISTRATIVE ASSISTANT NOTIFICATION LIST AND RECOFS DATE I5iTIALSN1'ME' 1.
Corcplete as much of Form 1903.10M, "EAL Notification" as avail-able information and time allows.
NOTE:
The order of notification may be rearranged as the situation dictates with approval of the Shift Operations Supervisor.
These groups should be contacted by the mst expedient means available (paging, contacting appropriate response center for relaying information, direct paone call, radio contact, etc.).
The phone numbers (plant personnel) provided are for use if an individual is not onsite, the appropriate respo-se center has not been manned, etc.
2.
2rovide the initial information on Form 1903.10M to the following groups:
2.1 Duty Emergency Coordinator (a duty roster is maintained in
/
the Shift Supervisor's office); if not on-site, refer to Attachment I for telephone numbers as necessary.
NOTE:
If the Technical Operations Control Center has been activated, the Technical Operations Control Of ficer may be contacted in lieu of the Ifealth Department.
2.2 Arkansas Department of Health [I,
_.*; or contact
/
the OES (*
~ or use the OES radio channel) and i
request them to notify the Health Department]. (This notification is required to be made within 15 minates of an EAL declaration.)
2.2.1 If a decision is made by the Arkansas Department of Health to activate the Early Warning System, the SAA will receive the following message via telephone:
"This is I am the Arkansas Department cf health Staff Duty Officer for the week.
I am requesting that you disable the emergency radio repeater on Nt. Nebo in order to allow activation g7 of the Early Warning System. Please standby for notification of completion of system activation."
Ensure triat the Unit 1 Master Radio Console is selected to Channel 3 and then depress the push-button switch labeled " repeater" The SAA should maintain an oren line of telephone communication with the Staf f Duty Officer until the following c
message is received:
" Activation is complete, return system to prior status"
/
THE MATERI AL CONTAINED WITHIN THE SYMBOLS (*) IS FROPRIETARY OR PRIVATE INFORMATION.
W:
Sua.;,4 b2DC
_ ;m-
r.
[gggUgSgE.CTION:
PROCEDUREN/ORK PLAN VITLE:
NO:
j (
PROCEDURE EMERGENCY ACTION LEVEL RESPOIISE 1903.10
/5 PAGE
^ Of D/
rs 1 ARKANSAS NUCLEAR ONE aevision it o^re uv/zo/o>
CHANGE DATE 7
ARKANSAS POWER & LIGHT COMPANY 5
Arkansas Nuclear One EL.
l F0W NO.
m N
eu re,.r.:n s - w.,
r eur, e e e er..c r
'n, un REV. #11 PC i Page 2 of 4 DATE INITIALS /TI:1E 2.3 Staff Augmentation Group (a duty roster / call list is maintained in the Control Room area).
NOTE:
The following minimum information should be provided to the team leader: affected unit. EAL declared, ap-prcpriate plant conditions / parameters, required re-sponse and suggested protective actions (if necessary).
2.3.1 Health Physics Section (Beeper available)
/
2.3.2 Engineering / Technical Support Section (Seepet
/.
available) 2.4 Nuclear Pegulatory Comission [ Hotline; or =
/
or or Health Physics Network phone or 2.5 Emergency Teams requiring immediate respcnse (refer to the indicated attach-ent for call list if tea:n personnel are ' otn cu rently onstte).
NOTE:
The following minimum information should be provided to the team leader: affected unit. EAL declared, appropriate plant conditions / parameters, required respanse and suggested protective acticns (if neces=ary).
2.5.1 Evacuation Team (Attachment 2)
/
2.5.2 Fire Team (Attachment 3)
/
2.5.3 Medical Team (Attachment 4)
/
NOTE: If the Health Fhysics/ Radiochemistry section of the S*af f Augumentation Group has been activated, the personr.el on the Radiation CI Team are being contacted by this means.
2.5.4 Radiation Team (Attachment 5)
/
NOTE: If the Emergency Control Center has been activated, i
the Incident Response Director may be contacted in I
lieu of the Little Rock Control Center.
THE MA!ER!AL CCNTAINED WITH W IHE SYnSOLS (*) IS PfiGFRIETARY CR FRIVAIE INFOR:tA!ICM.
h e-=
~
mmm
~~ ' * * - ~~
y.
h
['*
s
r--
gggAgJTION:
PROCEDURE / WORK PLAN TITLE:
NO:
I PROCEDURE DIERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE ad or o/
A-ARKANSAS NUCLEAR ONE aevision 22 o^Te u'/z"/6*
CHANGE DATE ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One m%e,.r s -r-., m,t l = %,,
e m.-...
REV. ill PC #
Page 3 of 4 DATE INITI ALS/ Til'E 2.6 Little Rock Control Center (*.
.*[orcontacteither
/
the OES or the MSS Dispatch Center and request them to notify the LRCC).
2.7 Emergency Teams not requiring immediate response (refer to the indicated attachnent for call list if, team personnel are not currently onsite).
NOTE :
The following minimum information should be provided to the team leaders affected unit. EAL declared, appropriate plant conditions /paramters, a request to assembly the team onsite and suggested protective actions (if necessary).
2.7.1 Evacuatien Team (Attach. ment 2)
/
2.7.2 Fi.e Team '(Attachment 3)
/
2.7.3 Medical Team (Attachment 4)
/
2.7.4 Radiation Team (Attachment 5 )'
/
NOTE: If the Technical Support Center has been activated, this center may be contacted in lieu of indivicual contacts.
2.8 Technical Support Center Personnel (refer to ' Attachment
/
6 for call list).
2.9 Operations Support Center Personnel (refer to Attachment
/
7 for call list).
2.10 Other Emergency Response Organization personnel (refer to
/
Attachment S for call list).
NOTE:
If the Technical Support Center has been activated, this center may be requested to contact the Resident NRC Inspectors.
C T
2.11 NRC Resident Inspectors (either one)
/
2.11.1
- J.
Cummins
).
2.11.2
- L.J. Callan
).
c.-
THE MATERIA Cof;TAINED WITHIM IHE SYM E S (*) IS FROFRIETARY OR PRIVATE INFCRMATION.
I y
C gggUgSgTION:
PROCEDURE / WORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE e 01 0/
O ARKANSAS NUCLEAR ONE
. aEvisiON ii o*TE */zo/63 CHANGE DATE m
ARKANSAS POWER & LIGHT COMPANY g
Arkansas Nuclear One M
l FORM NO.,
ev e o ne,.m s-ymr y eve, eee r.n,me REV. #11 FC #
Page 4 of 4 D?.TE INITIALS /II!!E 3.
Notify the Duty Emergency Coordinator / Recovery Manager that the
/
initial notifications have been made (inform him of any individuals that contact could not be made with).
4.
Provide updates to the following groups until relieved of responsibility:
4.1 Duty Emergency Coordinator / Recovery Manager 4.2 Nuclear Regulatory Commission (Include all available radiological release information) 4.3 Arkansas Department of Health or Technical Operations Control Center (at least hourly or ss directed).
I 4.4 Little Rock Control Center or Emergency Control Center s
(as directed).
l t
5.
At the termination of the event, this form and other applicable information should be turned over to the Duty Emergency Coordinator / Recovery Manager.
Shift Administrative Assistant THE MATERIAL CONTAINED WITHIN THE SYMBOLS (*) IS PR0fRIETARY OR PRIVATE INFORIGTICN.
l m
C5 m
i
-=
b m
[
w
i 1
m
{gggTION:
PROCEDURElWORK PLAN TITLE:
NO:
PROCEDURE EHERGENCY ACTION LEVEL RESPONSE 1903.10 O
ARKANSAS NUCLEAR ONE.
PAGE dl 01 DI REVISION 11 DATE V'd/ 20/ 07 CHANGE DATE l
}
ARKANSAS POWER & LIGHT COMPANY F
Arkansas Nuclear One m'e l'oa" ao -,,
- ~ ~, -,, -,,.,,,,.
.(
l Page 1 of 3 SITE EMERGENCY DUTY EMERGENCY COORDINATOR NOTIFICATION LIST AND RECORD DATE INITIALS / TIME 1.
Notified that Site Emergency Emergency Action' Level has
/
been declared, based on the following conditions (list):
I f
IlO 2.
Relieve the Shift Operations Supervisor of the following
/
Duty Emergency Coordinator responsibilities, if not previously accomplished:
2.1 Providing direction to emergency response personnel.
2.2 Calculating the offsite dose projections.
2.3 Performingfollow-upnotificationstothef$11owing j
groups:
2.3.1 Nuclear Regulatory Commission j
(Include all available radiological l
release information) 2.3.2 Arkansas Department of Health or Technical Operations Control Center (as directed) 2.3.3 Little Rock Control Center or Emergency g
Control Center (as directed) 2.3.4 General Manager 2.4 Directing onsite protective actions.
/
3.
Activate the Technical Support Center Staff, if not pre-
/
viously done (refer to Attachment 6 for call list as CU neces'sary).
l l
O m
E L.._
N
i r
gggUgTION:
PROCEDURE / WORK PLAN TITLE:
NO:
PROCEDURE ZMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE JO 01 DI O
ARKANSAS NUCLEAR ONE aEvision i2 o*TE
""/ea's3 CHANGE DATE ARKANSAS POWER & LIGHT COMPANY F
Arkansas Nuclear One
= < - - -,sc-P=* -, m
-c REV. # 7 PC #
Page 2 of 3 DATE INITIALS / TIME 4.
Activate the Operational Support Center Staff, if not pre-
/
viously done (refer to Attachment 7 for ca a list as necessary).
(
5.
Notify remaining (plant staff) Emergency Response Organir.a-
/
tion personnel (refer to Attachment 8 for call list as necessary).
I 6.
Assign personnel to perform the following duties if not
/
previously done:
6.1 Man open phone links between the Control Room and the Technical Support Center (refer to Attachment 8).
6.2 Man the Secondary Technical Support Center, if activated (QA personnel to be used as communicators; refer to, " Emergency Control Center Communications.
Personnel Roster / Call List").
6.3 Man the Training Center Switchboard and the ANO Plant Switchboard (contact M. K. Bishop per Attachment 7).
6.4 Update status boards.
6.5 Perform offsite dose projections.
6.6 Maintain a log of personnel reporting to the Technical l
Support Center or the Emergency Control Center.
I i
6.7 Other duties as necessary to support the incident response.
7.
Update the Control Room periodically on the status of per-sonnel reporting onsite or emergency response centers being activated.
g_-
8.
Dispatch the Offsite Radiological Monitoring Section of the
/
Emergency Radiation Team to assess the effects of the situa-tion on the environment.
9.
Consider use of the following protective actions:
CT l
9.1' Limit access to site.
9.2 Plant Evacuation.
9.3 Exclusion Area Evacuatio'n.
l l
5 h
N 1
m gggApgTION:
PROCEDURE / WORK PLAN TITLE:
NO:
PROCEDURE IMERGENCY ACTION LEVEL RESPONSE 1903.10 y
PAGE W OI O/
O ARKANSAS NUCLEAR ONE aevision 22 oaTe uv/zo/a3 CHANGE DATE m
ARKANSAS POWER & LIGHT COMPANY g
Arkansas Nuclear One
" rurocrvrv mine rrrrr eremer I ". #.
im int REV PC #
Page 3 of 3 DATE INITIALS / TIME 9.4 Area Evacuation (if an Area Evacuation is deemed necessary, contact one of the following groups per 1903.32, " Area Evacuation" (call in the order indi-cated until contact is made):
9.4.1 Arkansas Department of Health or Technical Operations Control Center fas directed) 9.4.2 Arkansas Nuclear Planning & Response Program (968-7171) 9.4.3 Appropriate County Sheriff (Refer to Attach-ment 1, " Emergency Telephone Numbers" for phone numbers)
- 10. When the following Emergency Response Organization personnel b
arrive onsite, transfer the indicated responsibilities to them:
10.1 Recovery Manager (Assumes responsibility for direction
/
of corrective and recovery actions) 10.2 Site Security Coordinator (Assumes responsibility for-
/
direction of Security / Evacuation Team personnel) 10.3 Emergency Services Coordinator (Assumes responsibility
/
l for direction of the Fire and Medical Team personnel)
I 10.4 Health Physics & Chemistry Superintendent (Assumes re-
/
sponsibility for direction of the Onsite Radiological Monitoring Section of the Emergency Radiation Team) 10.5 Technical Support Manager (Assumes responsibility for
/
direction of the Offsite Radiological Monitoring Sec-l tion of the Emergency Radiation Team and dose assess-j ment activities).
10.6 Incident Response Director (Assumes responsibilities
/
for direction of the overall response to the incident).
- 11. When item (10) has been completed, turn over this notifi-cation. List and record and other pertinent documents to C_-
the Recovery Manager.
l
- 12. At the termination of the event, the following summaries shall be provided:
12.1 A verbal summary to:
12.1.1 Nuclear Regulatory Commission
/
g3 12.1.2 Arkansas Department of Health
/
12.2 A written summary of the event to the Emergency Planning Coo rdina to rs.
O Duty Emergency Coordinator Cr c
~- -
[g
ggguggTION:
PROCEDURElWORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 4U 01 0/
O
ARKANSAS NUCLEAR ONE aevision 22 o*Te o*/zo/63 CHANGE DATE 9.0 GENERAL EMERGENCY 9'.1 Classification Criteria 9.1.1 Projected or measured dose rates at the site boundary from either unit exceeds 250 mR/hr whole body or 500 mR/hr to the thyroid for actual meterological conditions.
9.1.2 Loss of two out of three fission product barriers with a potential loss of the third barrier. Loss of fuel cladding integrity must involve greater than 1% failed fuel (or equivalent reactor coolant system activity); loss of reactor coolant system integrity must involve leakage in excess of makeup capacity; loss of containment integrity must involve mechanical equipment failure (containment ourge valves not closed, airlock cannot be closed) or structural damage which would' result in uncontrolled leakage from the reactor building.
~
9.1.3 Ongoing security threat within the Control Room or vital areas. Criteria for imposing any of the emergency classi-fications and the appropriate protective action are not
~imted to those listed.
(,;
9.2 Personnel Responsibilities And Required Actions Responsibility for notification and Protective Action Recommendations shall be transferred from (1) the Shift Supervisor (acting as the Duty Emergency Coordinator) to (2) the Duty Emergency Coordinator to (3) the Recovery Manager to (4) the Incident Respon=e Director. This transfer shall be accomplished only after a formal turnover has been completed and documented by a log entry.
For the General Emergency Emergency Action Level, the following actions shall be taken by members of the Initial Response Organization and Emergency Response Organization, as defined in the Arkansas Nuclear One Emergency Plan:
9.2.1 Shift Operations Supervisor A.
Once the Shift operations Supervisor has determined that the General Emergency Action Level should be placed into effect, he shall:
1.
Assure the appropriate procedures are being imple-mented to mitigate the consequences of the unusual plant conditions.
n 2.
Implement the General Emergency Emergency Action U
Level notifications, and record these notifica -
tions as shown on Form 1903.10J of this procedure.
@ggUgpTION:
PROCEDURE / WORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 F
PAGE 41 OI O'
Cx ARKANSAS NUCLEAR ONE aevisiON 22 o*Te u"/e*/">
CHANGE DATE 3.
Direct the activities of the Initial Response organization until relieved by the Duty Emergency coordinator.
4.
Direct Operations personnel and unit operations.
9.2.2 Shift Technical Advisor A.
The Shift Technical Advisor shall assist the Shift Operations Supervisor in incident assessment.
9.2.3 Shift Administrative Assistant A.
When directed by the Shift Operations Supervisor, the Shift Administrative Assistant shall initiate the General Emergency Shift Administrative Assistant Notification List and Record, Form 190,3.10K of this procedure. The Shift Administrative Assistant shall also respond to incoming calls to the control room during the incident.
B.
In the absence of the Shift Administrative Assistant, the Shift Operations Supervisor shall appoint an in-dividual to initiate the General Emergency Shift Ad-
<~(,)
ministrative Assistant Notification List and Record.
If additional assistance is needed, the Shift opera-tions Supervisor may appoint individuals to assist in performing notifications (e.g. the Shift Administra-tive Assistant from the unaffected unit).
C.
The Shift Adminstrative Assistant shall assist opera-tions personnel as directed by the Shift operations Super-visor.
i 9.2.4 Duty Emergency Coordinator 1
A.
If not on site, the Duty Emergency Coordinator shall l
report to the site when notified of a General Emer-l gency. He shall direct emergency response operations l
so as to free the Shift onarations Supervisor to l
oversee reactor operations, l
B.
The Duty Emergency Coordinator shall initiate the General Emergency Duty Emergency Coordinitor Notifi-l cation List and Record, Form 1903.10L of this prcce-dure.
C.
If a radiological release is involved, the Duty Emer-gency Coordinator shall direct the implementation of gx appropriate onsite protective actions, and shall pro-
\\_/
vide offsite radiological assessment-information to offsite authorities responsible for implementing off-site emergency measures.
m gggUgyTION:
PROCEDURE / WORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 F
PAGE 4Z 01 bl C)
ARKANSAS NUCLEAR ONE aavision it o^re u9/zo/63 CHANGE DATE NOTE:
Upon declaration of any General Emergency, make the following recommendations to Arkansas Department of Health personnel: As a minimum, recommend sheltering within a 2-mile radius of the plant and 5 miles in the downwind direction.
9.2.5 Emergency Response Team Leaders A.
The Emergency Response Team Leaders or Alternates are notified by the Shift Administrative Assistant that a General Emergency has been declared.
B.
The Emergency Response Team Leader or Alternates shall call out and assemble the teams. The Team Leader or Alternate shall report to the Duty Emergency Coordina-tor when the team is assembled.
9.2.6 Incident Response Director A.
The Incident Response Director is notified by the Little Rock Control Center that a General Emergency i
has been declared.
i
(,)
B.
The Incident Response Director shall report to the l
Emergency Control Center when notified that a General l
Emergency has been declared.
1 C.
The Incident Response Director shall activate the l
General Office portions of the Emergency Response organization, as needed.
9.2.7 Recovery Manager A.
The Recovery Manager is notified by the Shift Admini-strative Assistant that a General Emergency has been declared.
B.
The Recovery Manager shall immediately report to the Onsite Technical Support Center when notified that a General Emergency has been declared.
9.2.8 operations Manager A.
The Operations Manager is notified by the Shift Admin-istrative Assistant that a General Emergency has been declared.
P B.
The Operations Manager shall immediately report to the Onsite Technical Support Center when notified that a
(_s)
General Emergency has been declared.
{ppggApgTION:
PROCEDURElWORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 4d Of ol O-ARKANSAS NUCLEAR ONE aEvisiON 11 oars o*/zo/83 CHANGE DATE 9.2.9 Maintenance Manager A.
The Maintenance Manager is notified by the Shift Administrative Assistant that a Site E:nergency has been declared.
B.
The Maintenance Manager shall immediately report to the Onsite Technical Support Center when notified that a Site Emergency has been declared.
9.2.10 Operations Superintendents A.
The Operations Superintendents are notified by the Shift Administrative Assistant that a General Emer-gency has been declared.
B.
The Operations Superinten, dents shall immediately re-port to the Control Rooms of their respective Units and inform the Onsite Technical Support Center of his presence in the Control Room.
9.2.11 Health Physics Superintendent and Technical Analysis f-Superintendent N ]3 A.
The Health Physics Superintendent and Technical Analysis Superintendent are notified by the Shift Administrative Assistant that a General Emergency has been declared.
B.
The Health Physics Superintendent and Technical Analysis Superintendent shall immediately report to the Onsite Technical Support Center when notified that a General Emergency has been declared'.
l l
9.2.12 Nuclear and Engineering Support Superintendent A.
The Nuclear and Engineering Support Superintendent is notified by che Shift Administrative Assistant that a General Emergency has been declared.
B.
The Nuclear and Engineering Support Superintendent shall immediately report to the Onsite Technical Support Center when notified that a Ge1.eral Emergency I
has been declared.
9.2.13 Maintenance Superintendents A.
The Maintenance Superintendents are notified by the l
Shift Administrative Assistant that a General Emergency l
<s has been declared.
l (a)
gggUgTION:
PROCEDURE / WORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 44 of ol O'
ARKANSAS NUCLEAR ONE aevision 1
oars o*/ o/o2 CHANGE DATE B.
The Maintenance Superintendents shall immediately report to the Onsite Operational Support Center when notified that a General Emergency has been declared.
9.3 Termination of Emergency Action Level 9.3.1 The General Emergency Emergencey Action Level may be de-escalated to a lower Emergency Action Level or be termi-nated by recovery from the event.
9.3.2 The General Emergency Emergency Action Level may be closed out after being terminated by a briefing by the Incident Response Director of the appropriate offsite authorities.
All documentation generated from the General Emergency shall be handled in accordance with Section 5.4 of proce-dure 1072.004, " Administration of the Emergency Plan and Implementing Procedures".
9.4 Forms 9.4.1 The following forms describe the notifications and records to be made by the appropriate individuals for the General 7s Emergency Action Level. Date the form where indicated (if
( )
the date changes before the form is complete, indicate the new date on the appropriate initial / time line). As noti-fications are completed, initials and time should be placed on the line in the right hand margin by each step. Other l
pertinent data (e.g. person contacted) may also be noted adjacent to each step, as appropriate.
9.4.2 Form 1903.10J - General Emergency Shift Operations Super-viser Notification List and Reco'd.
r 9.4.3 Form 1903.10K - General Emergency Shif t Administrative Assistant Notification List and Record.
9.4.4 Form 1903.10L - General Emergency Duty Emergency Coordinator Notification List and Record.
N,]
~
m gggUgTION:
PROCEDURE / WORK PLAN TITLE:
NO-PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE O OI DI O
ARKANSAS NUCLEAR ONE aEvisioN 21 oarE uv/z'/c" CHANGE DATE Pn ARKANSAS POWER & LIGHT COMPANY g
Arkansas Nuclear One Po= ""
=
r.rm -
.-1, v r.m
-m REV. # 7 PC'i GENERAL EMERG'NCY Page 1 of 2 SHIFT OPERATIONS SUPERVISOR NOTIFICATION LIST AND RECORD DATE INITIAIS/ TIME 1.
The General Emergency Cmergency Action Level has been
/
declared based on tha following conditions (List):
O 2.
Direct the Shift Technical Advisor to the Control room.
/
3.
Direct the Shift Administrative Assistant to initiate the
/
notifications specified on Form 1903.10K (the order of notifications may be rearranged as necessary). Assign /
contact personnel to assist as necessary.
~
4.
'If a radiological release is involved (unless previously relieved'of this responsibility):
4.1 Direct appropriate personnel to perform the calcul-
/
ations per 1904.02, "Of fsite Dose Projection -
Pocket Computer Method".
4.2 Provide radiological release information to the per-sonnel responsible for making follow-up reports (SAA.
4.3 Direct the implementation of appropriate onsite I ro-tective actions (unless relieved of this responsibility).
g C
O
-=
U L
N
9 gggUgTION:
PROCEDURE / WORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10
(
PAGE 46 or b/
g l v ARKANSAS NUCLEAR ONE aevisiON 11 oars ov/zo/63 l
CHANGE DATE l
ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One l Fom m t w pcevry vtTov frwr prepnvee 3,
,1g 7 REV. # 5 PC #
Page 2 of 2 DATE INITIALS / TIME 5.
Notify onsite personnel that a General Emergency has been
/
declared, and describe the nature of the emergency.
6.
Direct operating personnel to continue to closely monitor plant parameters (provide specific parameters as dictated j
by the situation).
l 7.
Perform the duties of the Duty Emergency Coordinator until relieved of those responsibilities (refer to 1903.10L).
8.
Maintain a l'og of the incident (this may be delegated to other personnel as available).
9.
At the termination of the Emergency Action Level, this Notification List and Record should be turned over to the Recevery Manager.
SHIFT OPERATIO'NS SUP'ERVISOR e
C"":
~
~=
^
L,.,,. m -
r Pl.AN%'.AMUA9EE7 TON:
PROCEDUREMORK PLAN TITLE:
NO:
t.Hr.a(sc.n L a a tu d
.w j
[
PRCCEDURE mERGENCY ACTION LEVEL RESPCNSE 1903.10 Q
"M fj PAGE 4/ M D/
ARKANSAS NUCLEAR ONE
-atvisiO" "
o*TE w/ze/a CHANGE JATE
?
g ARKANSAS POWER & LIGHT COMPANY m. I.
Arkansas Nuclear One '
l FORM Na,
N
..e e r e.rv r
. m a.; ecore c.re en..e e REV. #Il PC i Page 1 of 4 GENERAL EMERGENCY SHIFT AOMINISTRATIVE ASSISTANT NOTIFICATICH I.IST AND RECOED DATE
/
INITIALS /IIME 1.
Complete as much of Form 19J3.10M, "EAL Notification" as avail-able information and time allows.
NOTE:
The order of notification may be rearranged as the situation dictates with approval of the Shift operations Supervisor.
These grcups should be centacted by the most expedient means available (paging, centacting apprcpriate response center for relaying information, direct phone call, radio contact, etc.).
The phone nunters (plant persor.nel) provided are for use if an individual is not onsite, the appropriate response center has not been manned, etc.
2.
Provide the initial information on Form 1903.10?! to the follovtng rJroups:
NOTE:
Upon declaration of any General Emerger y. ensure that the follciing recomendstlen is made by the Cuty Emergency Coordinator to Arkansas Depart:::en'. of Health personnel: As a minimun, recommend shelteri g within a 2-mile radius of the plant and 5 miles in the downwind direc-tion.
2.1 Duty Emergency Ccordinator (a duty roster is maintained
/
in the Control Room area); beeper available; refer to Attachment I for telephone nu-ters as necessary.
NOTE:
If the Technical Operatiens Control Center has been activated. the Tech.ical Operations Control Officer may be contacted in lieu of the Health Department.
2.2 Arkansas Deoartment of Health [a
. or contact
_ /
the OES (*
- or Lse the 025 radio channel) and request them to notify the Health Department].
(This noti-fication is required to be made within 15 minutes of an EAL declaration.)
C'"*
2.2.1 If a decisien is made by the Arkan~as Oapart: rent of He alth to activate the Early Warning System, the SAA will receive th-followir.g me ssage via tel ephor.e :
"This i-I am the Arkans s Department of Health Staf f Duty Officer for the week.
I am requesting that you disable the emergency radio repeater on Mt. Nebo in order to allow activation of the Early Warning System. Please standby for notification of corpletion of system activation."
THC MATERIAL CONTAINED WITHIN THE SY:30LS (*) IS FROERIETARY GR FRI U TE IN F0FT.AIION.
w
- - - - ' - - - ~ ' - - * '~~'~
w
c gJg4,UggTION:
PROCEDURENIORK PLAN TITLE:
tJO:
(
PROCEDURE SHERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE O 01 O#
aevisio" ^^
o^TE "'"' "
ARKANSAS NUCLEAR ONE Ea CHANGE DATE m
ARKANSAS POWER & LIGHT COMPANY Q
Arkansas Nuclear One N
r ecc.,-
l FORM NO.,
r n - -,ervre ere on..e -
REV. #11 PC #
Page 2 of 4 DATE INIT!AL5/IIItE Ensure that the Unit 1 Master Radio Console is selected to channel 3 and then depress the push-butten switch labeled " repeater". The SAA should maintain an open line of telephone corrunication with the Staff Duty Officer until the following message is received:
" Activation is complete, return system to prior status".
/
2.3 Staff Augmentaticn Group (a duty roster / call list is i
maintained in the Control Room area).
NOTE:
The following minimum information should be provided to the team leaders affected unit. EAL declared, ap-prcpriate plant ccnditions/ parameters, required re-sponse and suggested protective actions (if necessary).
2.3.1 Health Physics (Beeper available)
/
2.3.2 Engineering / Technical Support Section (Beeper
/
available) 2.4 Nuclear Regulatory Commission [ Hotline: or *
/
. or Health Physics Network phone
. or
- l.
j 2.5 Emergency Teacs requiring immediate response (refer to the in-dicated attachment for call list if team personnel are not currently onsite).
NOTE:
The following minimum information should be provided to the team leaders affected unit. EAL declared, apprcpriate plant conditiens/ parameters, required response and suggested protective actions (if necessary).
C 2.5.1 Evacuation Team (Attachment 2)
/
2.5.2 Fire Team (Attachment 3)
/
1.5.3 Medical Team (Attachment 4)
/
NOTE: If the Health Physics secticn of the Staff Augumentation Group has been activated, the personnel on the Radiation Team are being contacted by this means.
THE MATERIAL CC_. _. - - _. _. _. _ _... _ _ _. _ _ _1TAlt;ED WITHI 1 THE SY:$0LS (*) 15 PRCPRIETARY OR PRIVAIE !!JFORitATION._
I l
ec
e-gg ggTIO{
PROCEDUREAVORK PLAN TITLE-NO:
/
PROCEDURE 31ERGENCY ACTION LEVEL RESPONSE 1903.10 ff PAGE
" OI 0'
CJ" ARKANSAS NUCLEAR ONE aevision it oaTe u'/ea'6' CHANGE DATE ARKANSAS POWER & LIGHT COMPANY j '
Arkansas Nuclear One l FO"" "O' N
+m 3m eur e.-r. -v s m e.! teere cree ~er REV. #11 PC i Page a of 4 DATE INITI ALS / Tit:E 2.5.4 Radiatien Team (Attachment $)
/
NOTE:
If the Emergency Control Center has been activated, the Incident Response Director may be contacted in lieu of the Little Rock Control Center.
2,6 Little Rock Control Center (*
, ; dr contact
/
either the CES or the MSS Dispatch Center and request them to notify the LRCC).
2.7 Emergency Teams not requiring immediate response (refer to the indicated attachment for call list if team per-sonnel are not currently onsite).
NOTE:
The following minimum information should be provided to the team leaders affected unit, EAL declared, apprcpriate plant ccnditions/ parameters. a reqaest to assembly the team onsite and suggested protective actions (if necessary).
2.7.1 Evacustion Team (Attachnent 2)
/
2.7.2 Fire Team (Attachment 3)
/
2.7.3 -
Medical Team (Attachment 4)
/
/
2.7.4 Radiation Team (Attachment 5)
NOTE:
If the Technical Support Center has been activated, I
this center may be centacted in lieu of individual l
contacts.
2.8 Technical Support Center Personnel (refer to Attach-
/
ment 6 for call list).
~
2.9 Operatiens Support Center Personnel (refer to Attach-
/
l ment 7 for call list).
CZ 2.10 Other Emergency Response Organization persxnel (refer
/
to Attachment 8 for call list).
i NOTE:
If the Technical Support Center has been activated.
this center may be requested to contact the Resident NRC Inspectors.
THE MAIERI AL CONTAINED IJITHIll THE SY;:SCLS (*) IS FROPRIETARY CR PRIVATE INECR!!ATICri.
~
1
(
~
l l
k:
l l
p.
p
" r, f
tt
r l
ggggUAggiiON:
PROCEDURE / WORK PLAM TITLE:
NO:
i
{
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 f
~\\
PAGE DU 01 O/
l r--
ARKANSAS NUCLEAR ONE at="
o^te **
~
CHANGE DATE ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One N
re-e. cv l FOW NO.,,y e
sp e r., r ever r ee emre e
,m REV. #11 PC f Page 4 of 4 DATE INITIALS / TIME 2.11 NRC Resident Inspectors (either one)
/
2.11.1
- J. Cummins 2.11.2
- L.J., callan le 3.
Notify the Duty Emergency coordinator / Recovery Manager
/
that the initial notifications have been made (inform him of any individuals that centact could not be made with).
4.
Provide updates to the follouing groups until relieved of responsibility:
4.1 Duty Emergency Coordinator /Rewvet y Mai.ager 4.2 Nuclear Regulatory' Commission (Include all available radiological release information) 4.3 Arkansas Department of Health or Technical Operations Control Center (at least hourly or as directed).
4.4 Little Rock Control Center or Emergency Control Center (as directed).
5.
At the termination of the event, this form and other applicable information should be turned over to the Duty Emergency Coordinator / Recovery Manager.
Shi E Alministrative Assistant i
l THE MATERIAL CCNTAINED WITHIN THE SYMSCLS (*) IS FROFRIETARY OR PRIVATE INF0feiATION.
s e
u
(
t l
l
~
p, c.
},
- i..
T
r.
[.NIN[.k[kktjilOM: -
PROCEDUREN.'ORCt PLAN TITLE:
NO:
_f y
PROCEDURE DIERGENCY ACTION LEVEL RESPONSE 1903.10 4
g PAGE 31 ot 6/
rea J ARKANSAS NUCLEAR ONE at="
il o^Te */z6/o3 9
CHANGE DATE ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One E*' a. -
l"0""O',n-,
M e ur e - c.,-y
- v. v -.; r e.e.
e ee r,-.. e e REV. 19 PC #
CENEPAL E!!ERGENCY CUTY EMERGENCY COCEDINATCR NOTIFICATICN LIST AND RECCFD CATE INITIAL 5/TII:E 1.
Notified that Gener 1 Emergency Emergency Action Level has
/
~
been declared, based on the following condit1ons (list):
2.
If not previously accerplished, complete the G1te Emergency Emergency ruty Emergency Coordinator Notification List and Record (Form 1903.10I).
NOTER Upon declaration of any General Emergency, make the foliewing recem-menda*1cn to Arkansas Department of Health personnel: As a minimum.
reccnnand sheltering within a 2-mtle radius of the plant and 5 miles
=
in the do-r.;tnd directicn.
l 3.
Turn over this Notification List and Record and 'ather per-tinent dccuTrnts and notes to the Recovery Manager.
Duty Emergency Coordinator E-.._
en elp J
[
r ggAN,UggTIOM:
PROCEDUREN/ORK PLAN TITLE:
NO:
j (
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 EQ g
_ 0/
DAGE N 01 ARKANSAS NUCLEAR ONE Taevision are uv/^/"
CHANGE DATE ARKANSAS POWER & LIGHT COMPANY h
Arkansas Nuclear One E*a l
1903 !nM PLRCFNCY ACTIM TFST!. (F Aij NOTIFICATTM REV. # 8 PC 7 INSTRliCTICNS Page 1 of 3
- Provide updates of significant status changes (and at least hourly updates if there are no significant changes) to the Arkansas Department of Health (exclud-ing the Unusual Event EAL).
- Updates should be provided, via this form, tc the Technical Operations Control Center (TOCC) at '
'if no anner, call the Little Rock 24-hour switch-board at
]
- Notifications to the State of Arkansas will require use of Authentication Tables.
t If Challenged Message Authenticated By:
t A 8 C D E F G li I J K L M N O (None)/
j Indtcate alphabetical characters challenged Response Given
~
Begin transmission with the following statement: This is (identifv vourself)
! at Arkansas Nuclear Oce with an Emergency Action Level Notification Report.
- Acknowledge when you are ready to proceed.
I 1.
Message No.
(messages shall be numbered sequentially from the l
_ beginning of the event)
I g
2.
Date/ Time of Message 3.
N/A 4.
Message Sent Sy:
'/
Name Posttion 5.
Unit:
( ) One
( ) Two 6.
Class of EAL:
( ) A. Courtesy call
( ) D. Site Emergency
( ) B. Unusual Event
( ) E. General Emergency
( ) C. Alert 7.
Date/ Time of Latest Declaratton _ _. _.
HIDN_ _ _ _ _ _ _ _
c DD MuN YY
))]TpjOyR] Tid $hy3pjJIU@ @Mg![K@MMY G 3[
8.
Cendition Requiring Nottfication (No Changa ( )L
~
m.&
t
~
<'-FF*'****--
- w
-D TS T_0{H[Rj-~}tR $0Df E]S{t1L{~0M.Y l
{-;.-
l gggUgTION.
PROCEDURE / WORK PLAN TITLE:
NO:
1 PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE DJ 01 0/
O ARKANSAS NUCLEAR ONE n
aavisioN ii o*Ta uv/zo/63 CHANGE DATE I
ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One TITLE: EMERGENCY ACTION LEVEL (EAL) NOTIFICATION l FORM NO.1903.10M REY. # 0 PC #
Page 2 of 3 9.
Onsite Situation (Check only appropriate responses)
A.
Prognosis of Situation
( ) Stable
( ) Degrading.
l
( ) Improving I
B.
AP&L Radiation Teams
( ) Activated
( ) Not Activated C.
Local Assistance Requested:
( ) None
( ) Fire
( ) Police
( ) Ambulance
( ) Other D.
Evacuation of Onsite Personnel:
( ) Yes
( ) No l
( ) Some E.
Emergency Centers Activated 1
i
( ) None
( ) TSC
( ) ECC F.
Other Emergency Response Actions Underway:
l
- 10. Radiological release is:
( ) Not Expected
( ) Eminent
( ) Occurring
( ) No longer occurring u _.
1
- * * *-* STOP IIERE IF A RADIOLOGICAL RELEASE IS NOT EXPECTED Of OCCUR * * * * *
- t l
y m
t, J
e s
s 9
o e
- w. s.. M ~
C gggUgpTION:
PROCEDURE / WORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE di ot of C,
ARKANSAS NUCLEAR ONE aavisioN 21 oars u*/eo/oe CHANGE DATE ARKANSAS POWER & LIGHT COMPANY Arkansas Nuclear One l 'c~ "*-
~
- c. _.,
,-,-,c.,,
,c.,,
REV. # 10 PC #
Page 3 of 3 11.
Type of Release:
( ) Airborne
( ) Waterborne l
( ) Surface Spill 12.
Areas Affected by Radiological Release (Sectors / Distance):
1 I
13.
Description of Release Material (Chemical and Physical Form Estimate of Equivalent Curies of I-131 and XE-133 Released, Release Rate (Ci/sec).
Iodine / Noble Gas Ratio, etc.):
14.
A.
Wind Direction: (From)
B.
Wind Speed:
mph
- 15. Temperature:
'F 16.
Precipitation:
A.
( ) Yes ( ) No ( ) Occasional B.
Form
- 17. Atmospheric Stability Class:
- 18. Estimated start time and duration of the release:
l Start Duration
- 19. A = Actual D05c. RATES INTECRATED DOSE P = Projected Distance (mi) g CT g
g Check One: ()A
()P (0.65) mR/hr n_R/hr mR mR
()A
()P 1
()A ()P 2
()A ()P 5
()A
()P 10 20.
Recommended Protective Action: No Action Shelter Evacuation
- 21. Areas Affected ty Protective Action Recon:mendation (Sectors / Distance) c 22.
RfftARKS:
O mr
gggUgTION:
PROCEDURElWORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE bb or o/
O ARKANSAS NUCLEAR ONE laevision 21 o*Te o9/zo/63 CHANGE DATE 10.0 ATTACHMENTS NOTE: The forms relating to specific Emergency Action Levels are located at the end of their respective Emergency Action Level Sections.
10.1 Form 1903.10A - Unusual Event Shift Operations Supervisor Notification List and Record; (Section 6.4).
10.2 Form 1903.10B - Unusual Event Shift Administrative Assistant Notifi-cation List and Record; (Section 6.4).
10.3 Form 1903.10C - Unusual Event Duty Emergency Coordinator Notification List and Record; (Section 6.4).
10.4 Form 1903.10D - Alert Shift Operations Supervisor Notification List and Record; (Section 7.4).
10.5 Form 1903.10E - Alert Shif t Adninistrative Assistant Notification List and Record; (Section 7.4).
10.6 Form 1903.10F - Alert Duty Emergency Coordinator Notification List and Record; (Section 7.4).
n( )
10.7 Form 1903.10G - Site Emergency Shift Operators Supervisor Notification List and Record; (Section 8.4).
10.8 Form 1903.10H - Site Emergency Shift Administrative Assistant Notification List and Record; (Section 8.4).
l 10.9 Form 1903.10I - Site Emergency Duty Emergency Coordinator Notification
)
List and Record; (Section 8.4).
10.10 Form 1903.10J - General Emergency Shift operations Supervisor Notification List ind Reccrd; (Section 9.4).
10.11 Form 1903.10K - General Emergency Shift Administrative Assistant Notification List and Record; (Section 9.4).
10.12 Form 1903.10L - General Emergency Duty Emergency Coordinator Notification List and Record; (Section 9.4).
10.13 Form 1903.10M - Emergency Action Level Notification; (Section 10.0).
10.14 Attachment 1 - Duty Emergency Coordinator Roster / Call List; (Section 10.0)
\\
Y
~
fMM5MAFMTION.
PROCEDURElWORK PLAN TITLE:
NO:
PROCEDURE EMERGEllCY ACTION LEVEL RESPONSE 1903.10 PAGE DO 01 OI O
ARKANSAS NUCLEAR ONE aavision it o*Te uv/zo/03 CHANGE DATE 10.15 Attachment 2 - Emergency Evacuation Team Roster / Call List; (Section 10.0) 10.16 Attachment 3-Emergency Fire Team Roster / Call List; (Section 10.0) 10.17 Attachment 4 - Emergency Medical Team Roster / Call List (Section 10.0) 10.18 Attachment 5 - Emergency Radiation Team Roster / Call List; (Section 10.0) 10.19 Attachment 6 - Technical Support Center Roster / Call List; (Section 10.0) 10.20 Attachment 7 - Operational Support Center Roster / Call List (Section 10.0) 10.21 Attachment 8 - Remaining Emergency Response Organization (Plant Staff) and Communications Personnel Roster / Call List; (Section 10.0) 10.22 Attachment 9 - Emergency Telephone Numbers (Outside Assistance);
(Section 10.0).
1 v
I l
l l
l k
~
1 l
{1g3g9gyTION:
PROCEDUREAVORK PLAN TITLE:
NO:
J PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 N
i PAGE DI OI DI hl' ARKANSAS NUCLEAR ONE aevision ti oare ov/z6/83 CHANGE DATE ATTACHMENT 1 DUTY EMERGENCY COORDINATOR ROSTER / CALL LIST NAME BADGE WORK HOME
- J. M. Levine (Gen. Manager)
- Basil Baker
=
- Early Ewing
- Bob Terwilliger
- E.
L. Sanders
- L. W. Humphrey a
- T.
C. Baker
=
- L.
J. Dugger e
- A.
B. McGregor
- C. N. Shively (DEC = Beeper Number 602) i THE MATERIAL CONTAINED WITHIN THESE SYI!BOLS (*) IS PROPRIETARY OR PRIVATE INFORMATRION.
m.
m,e#.-
h
%m s.
ww -
- 6h**
^"
w c
e m-
{J gggJggTION:
PROCEDUREN/ORK PLAN TITLE:
NO:
7
~ ~~
j
_I PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE do or b/
W-ARKANSAS NUCLEAR ONE aevision it o^te ov/zo/o3 CHANGE DATE ATTACHMEllT 2 EMERGENCY EVACUATION TEAM ROSTER / CALL LIST TEAM LEADER:
~ ~ ~
- Jackie Crow ALTERNATE TEAM LEADERS:
- J.
C. Garrett
- Bruno Hampton MEMBERS:
- !!ike Myers
- John Beaty, Jr.
- Roger Hooper i
- James Starr
- Barbara Wade
- Barbara Dunn
- Jim Wilson
- Ira Mosquito e
- Gary Johnson
- Wayne Brock a
- Burl Neal THE MATERIAL CONTAII;ED WITHI!J THESE SYMSOLS (*) IS PROPRIETARY OR PRIVATE I!!FOPJ!ATIOlJ.
i l
l
ggggUgefCTIOa5:
PROCEDijREAVORK PLAN TITLE:
NO:
PROCEDURE
- MERGENCY ACTION LEVEL RESPONSE 1903.10 4-PAGE 39 01 0/
F*
ARKANSAS NUCLEAR ONE aavision ti o^te uv/za/s3 CHANGE DATE ATTACHMENT 3 EMERGENCY FIRE TEAM ROSTER / CALL LIST BADGE WORK HOME TEAM LEADER:
- Jim Bob Jackson t
ALTERNATE TEAM LEADERS:
- Larry Munson MEMBERS:
f
- Charles May Waldron
- Tom Wilkl.
- Glenn Brooks a
t
- Chester Wetzel
- Johnny Walker
- Marion Hall
[
- Tim A. Smith
- l.
l l
- John Vaughn j
1 THE MATERIAL CONTAINED WITHIN THESE SYMBOLS (*) IS PROPRIETARY '
l OR PRIVATE INFORMATION.
I 1
l l
l i
[ggggUgCTION:
PROCEDURElWORK PLAN TITLE:
NO:
~
PROCEDURE
During non-routine working hours, notify the Shift Maintenance Medical Team - 3142/3411.
BADGE WORK HOME TEAM LEADER:
- Dennis Calloway ALTERNATE TEAM LEADERS:
i
. Charles Adams e
i MEMBERS:
+ Richard Moredock e
+ Steve Stork e
- Mike Hoyt
- Gerald Bartlett
- Debby Moore i
+ Bill McCord 1
. Wayne Cheatham
=Shirman Yancy
.Kasandra Delph
- Eileen Goulet
- Paul Ford
. Curt Bailey a
l TiiE MATERIAL CONTAINED WITHIN THESE SYMBOLS (*) IS PROPRIETARY l
OR PRIVATE INFORMATION.
I l
l l
l l
[gJgguggTION:
PRCCEDUREM'ORK PLAM TITLE:
NO:
i PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 J
PAGE 1 or o/
4 l
em-ARKANSAS NUCLEAR ONE aevision 12 o^'s u'/zo'63 CHANGE DATE ATTACHMENT 5 EMERGENCY RADIATION TEAM ROSTER / CALL LIST BADGE WORK HOME TEAM LEADER:
- Dale Wagner ALTERNATE TEAM LEADERS:
- Tom Nickels f
- Robert Green 6
- Chuck Burchard
- Walt Hada MEMBERS:
- Jeff Garren
- Ken Zelnick Tim Smith
- Steve Fowler
- Maurice Ward
- e
- Wayne Wright e
l
- Danny Akins
- Harold Bishop a
- George Cooper
- James Deal
- Jeril Fancher
=
- Vicki Hughes
- Monty Manning a
- Danny Martin
- Mikel McIntosh
- Lloyd Qualls
- Dale Smith
- William Wiley
- Lynn Anderson
- David Moore
- Don Moore
- Ron Schwartz
- Michael Fultz
. Timothy Tadel
- Steve Burnett
- Robert Brownell
- Randy Stell
- Danny Grace l
- Steven Galbo l
- Ben Creech
- David Martin
- James Smith THE MATERIAL CONTAItJED WITHIN THESE SYMBOLS (*) IS PROPRIETARY OR PRIVATE INFORMATION.
-hw----
e.M s
-e-egm he
fhts5kTF459 TION:
PROCEDUREN.'ORK PLAM TlTLE:
NO:
g I
PROCEDURE EMERGENCY ACTICII LEVEL RESPONSE 1903.10 PAGE 04 OI DI E"m ARKANSAS NUCLEAR ONE atvision ti oaTE uv/zo/63 CHANGE DATE ATTACHI!ENT 6 TECHNICAL SUPPORT CENTER STAFF ROSTER / CALL LIST BADGE WORK HOME
~~
'J. M. Levine (Beeper = 601)
- E. L. Sanders
- B. A. Baker l
- T. C. Baker
- M. J. Bolanis
- E. C. Ewing
- A.
B. McGregor
~
-k THE MATERIAL CONTAINED WITHIN THESE SYIIBOLS (*) IS PROPRIETARY OR PRIVATE INFORMATION.
l l
l
)
I l
gggNUygTlON:
PROCEDUREN/ORK PLAN TITLE:
NO:
PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 04 Of OI aevisio" 22 o^re oizo/ 63 ARKANSAS NUCLEAR ONE CHANGE DATE ATTACHMENT 7 OPERATIONAL SUPPORT CENTER STAFF ROSTER / CALL LIST BADGE WORK /OSC HOME
- P. Jones 2,.
\\
- V.
C. Pettus
.H. R. Tucker
.G.
L. Fiser
.R.
D. Gillespie
.C. Fe11hauer
.J. B. Lamb
.H.
L. Hollis
.M.
K. Bishop
=
.S.
J. McWilliams
.R. Wewers
.G. D. Helmick
.C. N. Shively
~ -.
THE MATERIAL CONTAINED WITHIN THESE SYMBOLS ( ) IS PROPRIETARY OR PRIVATE INFORMATION.
m-m e
g{gJgqTION:
PROCEDURE /WORCt PLAM TlTLE:
N O-PROCEDURE EMERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE 04 Of O#
ARKANSAS NUCLEAR ONE aevision it oate */za/83
~
CHANGE DATE ATTACHMENT 8
~
RE!!AINING EMERGENCY RESPONSE ORGANIZATION (PLANT STAFF) ROSTER / CALL LIST NAME BADGE WORK HOME
- L. W. Humphrey f
- J.
D. Moore
- R.
L. Cole CONTROLROOM/TECHNICALSUPPORTCE[TERCOMMIEIC5TIONSPERSONNELROSTER/CALLLIST
- W.
E. Converse
'e
- K. Morton
- L.
S. Bramlett
- M. A. Smith
- M.
J. Konya
=
- D. B. Lomax
- R. M. Copp
=
- R. T. Blankenship EMERGENCY CONTROL CENTER' COMMUNICATIONS PERSONNEL ROSTER / CALL LIST
- G. D. Provencher
- J.
R. Brown
'n
- R. M. McFarland
- R. M. Cooper e
- B.
L. Bata le TECHNICAL ADVISORY PERSONNEL ROSTER / CALL LIST
- J. Vandergrift
- J. Waid
- D.
Barton
- R. Hargrove
- J.
Simmons
- E.
Force e
j THE MATERIAL CONTAINED WITHIN THESE SYMECLS (*) IS PROPRIETARY OR PRIVATE INFOR!!ATION.
gygANlJggTiON:
PROCEDUREAVORK PLAN TITLE:
NO:
)
PROCEDURE
- MERGENCY ACTION LEVEL RESPONSE 1903.10 PAGE ob or oi C=-
ARKANSAS NUCLEAR ONE aevision it oars o9/2seo3 CHANGE DATE ATTACHMENT 9 Page 1 of 3 EMERGENCY TELEPHONE NUMBERS (OUTSIDE ASSISTANCE)
NOTE: All area codes are 501 unless otherwise noted.
FEDERAL Corps of Engineers (Dardanelle) 968-5008 Department of Energy (Radiological Emergency Assistance Team) 615-576-1005 Nuclear Regulatory Commission, Region IV 817-860-8100 STATE Arkansas Nuclear Planning & Response Program (Russellville) 968-7171 Arkansas State Department of Health (Eureau of Environmental :lealth Services)
Arkansas State Police 754-3096 (Clarksville) 754-8606 4
office of Emergency Services (Conway)
Technical operations control Center (TOCC) g Technical Operations control Officer 968-4704 968-4706 Public Notification 968-4700 968-4701 LOCAL POPE:
Ambulance Service 968-4567 Sheriff's Department 968-2558 Emergency Operations Center 968-2558 YELL:
Sheriff's Department 229-4175 Emergency Operations Center 495-7131 JOHNSON: Sheriff's Department 754-2200 Emergency operations Center 754-6383 LOGAN:
Sheriff's Department 963-3271 Emergency Operations Center 963-3218 THE MAIERIAL CONIAINED WITHIN THESE SYMSJLS(+) IS PROPRIETARY OR PRIVATE INFOR"ATION.
PROCEDURE / WORK PLAN TITLE:
NO-Eiggguggit0M:~ ~ ~F.MERGENCY ACTION LEVEL RESPONSE 1903.10 g
PROCEDURE
- 1 PAGE bo or o/
N ARKANSAS NUCLEAR ONE asvisi= "
oaTe am CHANGE DATE LOCAL CONT.
Page 2 of 3 RUSSELLVILLE: Millard Henry Clinic 968-2345 968-6211 Russellville Fire Department 968-8110 St. Mary's Hospital 968-6211 968-2841 Arkla Gas Company 968-2588 318-226-2700 Missouri-Pacific Railway Co.
968-4167 800-482-5950 KARV 968-1184 ARKANSAS POWER LIGHT ARKANSAS NUCLEAR ONE:
Emergency Control Center
,e a
'e Main Guard Station Unit One Control Room
'e a
i Unit Two Control Room LITTLE ROCK Senior Vice President, Energy Supply (Office)
+(W. Cavanaugh).
(Home)
Vice President, Nuclear Operations (Office)
+
- (J. Griffin)=
(Home)
=
Director, Administrative (Office) *
'e
- Services (D. Rueter)=
(Home)
Manager, Licensing (Office) *
- (J. Marshall)*
(Home)
=
Director, Generation - Technology (Office) a
- (T. Kilgore).
(Home)
~.
Corporate Health Physicist (Office)
=(D. Snellings)*
(Home) j Director, Fossil Operations (Office)
.(D. Sikes).
(Home) e Vice President, Corporate Communications (Office) l
- (C. Kelly)*
(Home)
Manager, Corporate Security (Office)
- (C. Dunn)*
(Home)
Little Rock Control Center e
THE MATERIAL CONTAIMED WITHIN IHE5E SYMSOLS( ) IS PROPRIETARY OR PRIVATE INFORMATI0d.
~~ ~
~
-w nw e
,+,w--w 9
4
,,I - -
gggUgTIOM:
PROCEDURENVORX PLAN TITLE:
N O-J PROCEDURE EMERGEtICY ACTION LEVEL RESPONSE 1903.10 4
PAGE 01 OI DI ARKANSAS NUCLEAR ONE acvisia 22 o*Te uv/z0/03 CHANGE DATE LOCAL CONT.
Page 3 of 3 RUSSELLVILLE: District Office:
- E. Deatone (Office) *
(Home)
- J.
Lee.
(Office) *
(Home)
- W.
Harrise (Office) *
,a (Home) i Emergency Control Office OTHER AGENCIES BABCOCK & WILCOX:
Site Representative *(T. Scott)
(Home)
Emergency Response Center a
COMBUSTION ENGItJEERItJG: Site Representative j
- (R. E. Sykes)
(Home) l Emergency Response Center
=
415-768-3840 BECHTEL 415-768-3841 INSTITUTE OF NUCLEAR POWER OPERATIONS 404-953-0904 NUCLEAR SAFETY ANALYSIS CENTER 415-855-2000 NUCLEAR ENERGY LIABILITY PROPERTY INSURANCE ASSOCIATION 203-677-7305 NATIONAL EARTHQUAKE INFORMATION CENTER 303-234-3994 TENNESSE EARTHQUAKE INFORMATION CENTER 901-454-2007 l
THE MATERIAL CONIAINED WITHIN THESE SYISOLS (*) IS PROPRIETIRY I
OR PRIVATE INFOR:!ATION.
i r
w.