Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000336/LER-1994-038, :on 941026,identified That Local Leak Rate Testing Not Adequately Performed on Containment Penetrations.Caused by Personnel Error.Revs to Surveillance Procedure Sp 2605D Initiated + (05:23:54, 15 December 2024)
- ML20078M125 + (05:23:54, 15 December 2024)
- ML20078M117 + (05:23:55, 15 December 2024)
- ML20078M113 + (05:23:56, 15 December 2024)
- ML20078M116 + (05:23:56, 15 December 2024)
- RBG-41180, Forwards Proposed Clarifications to LAR 91-11 Re Removal of Component Lists,Addressing NRC Concern of Further Identifying Scope of TS Line Item,Per GLs 91-01 & 91-08 + (05:23:57, 15 December 2024)
- ML20078M111 + (05:23:57, 15 December 2024)
- TXX-9429, Forwards Response to Nirs & Cfur 940926 2.206 Petition on Thermo-Lag at CPSES Unit 1 + (05:23:58, 15 December 2024)
- 05000461/LER-1995-001, :on 950105,FW Heater Train Operation During Removal of FW Heater from Svc Was Not Understood & Resulted in Decreased FW Temp,Loss of Heater Level Control & Manual Scram.Plugged 5B FW Heater Tubes + (05:24:00, 15 December 2024)
- ML20078M077 + (05:24:01, 15 December 2024)
- ML20078M073 + (05:24:01, 15 December 2024)
- ML20078M049 + (05:24:02, 15 December 2024)
- ML20078M056 + (05:24:02, 15 December 2024)
- ML20078M045 + (05:24:04, 15 December 2024)
- ML20078M044 + (05:24:04, 15 December 2024)
- ML20078M041 + (05:24:05, 15 December 2024)
- PY-CEI-NRR-0074, Clarifies Criteria 1,2 & 10 of 830916 Submittal Re TMI Action Plan Item II.B.3, Post-Accident Sampling Sys. Chemistry Technicians Requalified Biannually.Offsite Boron Analysis Performed Only on Undiluted Sample + (05:24:05, 15 December 2024)
- ML20078M039 + (05:24:06, 15 December 2024)
- ML20078M036 + (05:24:06, 15 December 2024)
- ML20078M035 + (05:24:07, 15 December 2024)
- ML20078M033 + (05:24:08, 15 December 2024)
- ML20078M029 + (05:24:09, 15 December 2024)
- ML20078M023 + (05:24:10, 15 December 2024)
- ML20078M015 + (05:24:11, 15 December 2024)
- BSEP-95-0044, Forwards MDE-81-0485,Rev 1, TS Improvement Analysis for Reactor Protection Sys for Brunswick Steam Electric Plant, Units 1 & 2 + (05:24:12, 15 December 2024)
- ML20078M011 + (05:24:12, 15 December 2024)
- ML20078L986 + (05:24:13, 15 December 2024)
- ML20078L988 + (05:24:13, 15 December 2024)
- ML20078L981 + (05:24:14, 15 December 2024)
- ML20078L975 + (05:24:15, 15 December 2024)
- ML20078L971 + (05:24:16, 15 December 2024)
- ML20078L968 + (05:24:17, 15 December 2024)
- ML20078L959 + (05:24:18, 15 December 2024)
- ML20078L960 + (05:24:18, 15 December 2024)
- ML20078L956 + (05:24:20, 15 December 2024)
- ML20078L958 + (05:24:20, 15 December 2024)
- ML20078L952 + (05:24:21, 15 December 2024)
- 05000318/LER-1994-006-01, :on 941027,Unit 2 Tripped on Receipt of Reactor Protective Sys Loss of Load Signal.Caused by Failure to Adequately Address Potential Risks of Work Newly Assumed by Electrical Maint Group.New Links Installed + (05:24:23, 15 December 2024)
- ML20078L947 + (05:24:24, 15 December 2024)
- 05000336/LER-1994-032, :on 941028,post Incident Recirculation Fan Flow Below Design Occurred.Cause Unknown.Work Scheduled to Adjust Fan Blades as Necessary to Achieve Required Air Flow Rate.W/ + (05:24:26, 15 December 2024)
- ML20078L938 + (05:24:27, 15 December 2024)
- ML20078L928 + (05:24:28, 15 December 2024)
- ML20078L916 + (05:24:30, 15 December 2024)
- ML20078L905 + (05:24:30, 15 December 2024)
- ML20078L902 + (05:24:32, 15 December 2024)
- ML20078L900 + (05:24:33, 15 December 2024)
- U-602372, Proposed Tech Specs Requesting Complete Rev of CPS TS for Conversion to Improved TS Per Guidance Provided by NUREG-1434, Improved BWR-6 TS, Rev 0,dated Sept 1992 + (05:24:33, 15 December 2024)
- ML20078L896 + (05:24:34, 15 December 2024)
- ML20078L885 + (05:24:34, 15 December 2024)
- ML20078L883 + (05:24:35, 15 December 2024)
- 05000219/LER-1994-019, :on 941019,SBO Power Supply Failed to Start During Functional Test Due to Inadequate Design Mod Due to Inadequate Administrative Control.Ups Installed to Power Gas Leak for CT-1 + (05:24:36, 15 December 2024)
- ML20078L871 + (05:24:38, 15 December 2024)