Forwards Implementation Schedule for Security Plan,Per 830727 Request.Procedural Portion Implemented,Effective 830501.NUS Study Re Hardware Portion Expected 831130. Schedule for Remaining Hardware Items Expected by 840331
ML20078M029
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 10/19/1983
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Varga S
Office of Nuclear Reactor Regulation
References
IPN-83-88, NUDOCS 8310240155
Download: ML20078M029 (2)


Text

.

123 Nbn Street W hde P!snr,, PJew Yark 10601 914 081.6200

  1. > NewYorkPbwer trm.-

4# Authority o ~ c~ '

October 19, 1983 IPN-83-88 Director of Nuclear Reactor Regulation U.

S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing

Subject:

Indian Point 3 Nuclear Power Plant Docket No. 50-286 Security Plan Implementation Schedule

Dear Sir:

Your letter of July 27, 1983 requests the submittal of the Indian Point 3 Security Plan implementation schedule.

The implementation of the revised security plan consists of two basic steps:

the procedural portion and the equipment or hardware portion.

By letter dated June 15, 1983 (IPN-83-60) the Authority informed the NRC that the procedural portion of the revised security plan has been implemented effective May 1, 1983.

To assist in the implementation of the hardware portion of the revised security plan, the Authority has contracted the NUS Corporation to conduct a Site Security System Study and Conceptual Design of Indian Point 3.

This study is scheduled to be completed by November 30, 1983.

The findings of this study will determine which aspects of the intrusion detection system require upgrading.

The upgraded intrusion detection system is anticipated to be installed and operational by October 31, l

1984.

An implementation schedule for the remaining hardware l

items can be formulated only af ter the completion of the NUS study and after considering the further changes that are currently foreseen in the Indian Point 3 security plan.

The l

Authority will submit an implementation schedule for the remaining hardware items, or changes to the security plan, by March 31, 1984 l

l l

0Y l

l 9'\\'

C310240155 831019 PDR ADOCK 05000286 F

PDR

7 O Should you have any questions regarding this matter, please contact fir.

P. Kokolakis of my staff.

Very truir yours,

&q.a/

~

J.

P.

Bayne Executive Vice President Nuclear Generation cc:

Resident Inspector's Office Indian Point Unit 3 U.

S. Nuclear Regulatory Commission P. O.

Box 66 Buchanan, New York 10511