Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 1CAN029505, Monthly Operating Rept for Jan 1995 for ANO-1 + (05:11:57, 15 December 2024)
- RBG-41189, Monthly Operating Rept for Jan 1995 for River Bend Station + (05:12:00, 15 December 2024)
- ML20078Q937 + (05:12:00, 15 December 2024)
- PY-CEI-NRR-1886, Forwards Response to follow-up to RAI Re GL 92-08,Thermo-Lag 330-1 Fire Barriers + (05:12:01, 15 December 2024)
- ML20078Q924 + (05:12:05, 15 December 2024)
- ML20078Q915 + (05:12:11, 15 December 2024)
- RBG-16114, Forwards Responses to Questions Raised During 830621 Meeting W/Geosciences Branch Re FSAR Revs Concerning Seismic Indications,Current Well Status & Seismic Profiles & Lineament Analysis.Responses to Be Included in Future Amend + (05:12:12, 15 December 2024)
- ML20078Q907 + (05:12:13, 15 December 2024)
- ML20078Q913 + (05:12:13, 15 December 2024)
- ML20078Q904 + (05:12:14, 15 December 2024)
- ML20078Q905 + (05:12:14, 15 December 2024)
- ML20078Q893 + (05:12:15, 15 December 2024)
- ML20078Q899 + (05:12:15, 15 December 2024)
- 2CAN029506, Monthly Operating Rept for Jan 1995 for ANO Unit 2 + (05:12:16, 15 December 2024)
- ML20078Q879 + (05:12:20, 15 December 2024)
- ML20078Q877 + (05:12:20, 15 December 2024)
- 05000361/LER-1983-130-01, /01T-0:on 831021,train B Emergency Chiller E-335 Tripped Following Power Supply Realignment.Caused by Spurious Trip from Control Circuit.No Further Corrective Actions Required + (05:12:22, 15 December 2024)
- ML20078Q867 + (05:12:23, 15 December 2024)
- 05000362/LER-1983-082-03, /03L-0:on 831005,qualified Safety Parameter Display Sys Train B Taken Out of Svc Due to Smoky Odor Eminating from Cabinet.Caused by Failed Circuit Board. Circuit Board Replaced + (05:12:24, 15 December 2024)
- 05000362/LER-1983-085-03, /03L-0:on 831007,low Pressure Turbine 1,intercept Valve 3UV2200L,failed Trip Solenoid a & B Tests During Monthly Surveillance Test S023-3-3.34.Caused by Failed Logic Card in Control Circuit.Logic Card Replaced + (05:12:27, 15 December 2024)
- ST-HL-AE-1013, Forwards Amend 34 to Fsar,Updating Section 3.7 Re Seismic Design + (05:12:28, 15 December 2024)
- ML20078Q836 + (05:12:28, 15 December 2024)
- ML20078Q833 + (05:12:29, 15 December 2024)
- ML20078Q823 + (05:12:29, 15 December 2024)
- ML20078Q821 + (05:12:30, 15 December 2024)
- ML20078Q820 + (05:12:31, 15 December 2024)
- ML20078Q811 + (05:12:32, 15 December 2024)
- ML20078Q805 + (05:12:32, 15 December 2024)
- ML20078Q799 + (05:12:34, 15 December 2024)
- ML20078Q785 + (05:12:35, 15 December 2024)
- ML20078Q780 + (05:12:35, 15 December 2024)
- RBG-41094, Provides Rept on Plant Training Simulator Testing Program. Testing Program for 1991-94 Completed on Schedule.No Uncorrected Performance Test Failures.Schedule for 1995-98 Simulator Performance Testing Encl + (05:12:36, 15 December 2024)
- 05000362/LER-1983-088-03, /03L-0:on 831005,RCS Hot Leg Sample Valve 3HV0508 Showed Intermediate Indication & Could Not Be Closed from Control Room.Caused by Electrical Malfunction.Electrical Leads to Valve Removed & Valve Locked Closed + (05:12:37, 15 December 2024)
- ML20078Q754 + (05:12:39, 15 December 2024)
- ML20078Q772 + (05:12:39, 15 December 2024)
- 05000219/LER-1994-021, :on 941119,inadvertent Introduction of Low Speed Demand Succeeded by High Speed Demand from DCS Led to Total Recirculation Flow Exceeding High Flow Scram Setpoint While Performing Troubleshooting + (05:12:41, 15 December 2024)
- NRC-94-4357, Forwards Info to Support Independent Soil Structure Interaction Analysis for AP600 Considered to Be Confidential Per 10CFR9.17(a)(4).Encl Withheld. Proprietary Portion of Document Sent to Westinghouse + (05:12:42, 15 December 2024)
- ML20078Q721 + (05:12:43, 15 December 2024)
- ML20078Q729 + (05:12:43, 15 December 2024)
- LD-94-069, Forwards marked-up CESSAR-DC Figure 5.1.2-2 Re Proposed Design Change to Remove RCP Seal Coolers + (05:12:44, 15 December 2024)
- NG-94-4399, Responds to GL 94-04 Dtd 940902,which Requested That All Addressees Provide Voluntary Rept Containing Certain Occupational Radiation Exposure Data + (05:12:45, 15 December 2024)
- ML20078Q706 + (05:12:45, 15 December 2024)
- NG-94-4452, Responds to RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, by Providing Util Plans for Resolution in Encl + (05:12:46, 15 December 2024)
- LIC-94-0253, Forwards Rev 1 to EPIP FC-EPF-21, Fort Calhoun Station Sector Map & Revised Index.Procedure Revised to Add Locations for Power Outlets,Security Stations,Fire Protection Equipment & Hazardous Matl Storage + (05:12:47, 15 December 2024)
- ML20078Q648 + (05:12:47, 15 December 2024)
- HL-4753, Responds to NRC Re Violations Noted in Insp Repts 50-321/94-26 & 50-366/94-26.Corrective Actions:Ltr Issued to All Plant Personnel Reiterating Procedural Requirements Re Proper Wearing of Dosimetry & Meeting Will Be Conducted + (05:12:48, 15 December 2024)
- ML20078Q627 + (05:13:02, 15 December 2024)
- ML20078Q636 + (05:13:02, 15 December 2024)
- ML20078Q611 + (05:13:03, 15 December 2024)
- ML20078Q619 + (05:13:03, 15 December 2024)
- ML20078Q609 + (05:13:04, 15 December 2024)
- NRC-95-4400, Forwards Description of Forcing Functions Generated from Postulation of Mainsteam Line Break & MSIV Closure Transient & Ps+Caepipe Time History Structural Analysis Results.Encls Withheld.Proprietary Portion of Doc Sent to Westinghouse + (05:13:05, 15 December 2024)