Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080P841 + (13:49:20, 14 December 2024)
- BECO-84-029, Forwards Rev 1 to GE BWR Supplemental Reload Licensing Submittal for Pilgrim Nuclear Power Station,Unit 1,Reload 6. Rev Corrects Error Noted on Page 13 Re Plant Response to MSIV Closure + (13:49:21, 14 December 2024)
- ML20080P834 + (13:49:21, 14 December 2024)
- ML20080P831 + (13:49:22, 14 December 2024)
- ML20080P829 + (13:49:22, 14 December 2024)
- ML20080P828 + (13:49:23, 14 December 2024)
- ML20080P822 + (13:49:25, 14 December 2024)
- ML20080P827 + (13:49:25, 14 December 2024)
- ML20080P817 + (13:49:26, 14 December 2024)
- ML20080P816 + (13:49:26, 14 December 2024)
- ML20080P808 + (13:49:28, 14 December 2024)
- ML20080P795 + (13:49:29, 14 December 2024)
- ML20080P797 + (13:49:29, 14 December 2024)
- GO2-95-037, Forwards Summary Description of Proposed Vehicle Control Measures as Required by 10CFR73.55(c)(7) & Results of Vehicle Bomb Comparison as Required by 10CFR73.55(c)(8). Encl Withheld + (13:49:30, 14 December 2024)
- ML20080P793 + (13:49:31, 14 December 2024)
- ML20080P789 + (13:49:31, 14 December 2024)
- ML20080P784 + (13:49:32, 14 December 2024)
- NRC-95-4410, Forwards Y-12 Technical Data Sheet 2.2.10, U-2 Molybdenum Alloy, in Response to RAI 210.121 of NRC + (13:49:32, 14 December 2024)
- ML20080P778 + (13:49:34, 14 December 2024)
- ML20080P783 + (13:49:34, 14 December 2024)
- ML20080P775 + (13:49:35, 14 December 2024)
- ML20080P773 + (13:49:36, 14 December 2024)
- PY-CEI-NRR-1919, Forwards Results of Vehicle Bomb Comparison & Vehicle Control Measures.Encl Withheld + (13:49:37, 14 December 2024)
- ML20080P768 + (13:49:38, 14 December 2024)
- ML20080P765 + (13:49:38, 14 December 2024)
- ML20080P763 + (13:49:41, 14 December 2024)
- ML20080P755 + (13:49:43, 14 December 2024)
- ML20080P758 + (13:49:43, 14 December 2024)
- U-602423, Annual Environ Operating Rept Jan-Dec 1994 + (13:49:44, 14 December 2024)
- ML20080P751 + (13:49:45, 14 December 2024)
- ML20080P746 + (13:49:45, 14 December 2024)
- DCL-95-046, Submits Summary Description of Proposed Vehicle Control Measures Per 10CFR73.55.Encl Withheld + (13:49:46, 14 December 2024)
- NRC-95-0018, Annual Operating Rept Jan-Dec 1994 for Fermi 2 + (13:49:46, 14 December 2024)
- ML20080P742 + (13:49:47, 14 December 2024)
- ML20080P740 + (13:49:48, 14 December 2024)
- ML20080P741 + (13:49:48, 14 December 2024)
- 05000334/LER-1984-001, :on 840114,during Performance of Low Bearing Oil Pressure Trip,Main Turbine Tripped.Caused by Pressure Switch on Auto Stop Oil Header Actuating,Causing Actuation of Solenoid Valve.Switch Setpoint Checked + (13:49:50, 14 December 2024)
- 05000395/LER-1983-106-03, /03L-0:on 830904,post-accident Hydrogen Analyzer Panel a (XPN-7215A) Declared Inoperable When Calibr Rotometer Ball Bearing Indicator Lodged in Pressure Regulator.Caused by Personnel Error + (13:49:52, 14 December 2024)
- ML20080P737 + (13:49:53, 14 December 2024)
- ML20080P736 + (13:49:53, 14 December 2024)
- 05000338/LER-1983-057-03, /03L-0:on 830903 & 12,Fire Door S71-19 Between Emergency Diesel Room 1H & Turbine Bldg Would Not Latch. Caused by Faulty Latching Mechanism & Misalignment.Latch Repaired & Realigned + (13:49:55, 14 December 2024)
- ML20080P732 + (13:49:56, 14 December 2024)
- ML20080P731 + (13:49:57, 14 December 2024)
- 05000261/LER-1983-024-01, /01T-0:on 830916,Tech Spec Instantaneous Release Limit for Radioiodine Exceeded Through Plant Stack.Cause Not Stated.Equipment Which Provided Pathway Shut Down.Iodine Level Remained Normal During Testing + (13:49:59, 14 December 2024)
- LIC-95-0056, Submits Summary Description of Proposed Vehicle Control Measures & Results of Vehicle Bomb Comparison.Encl Withheld + (13:50:00, 14 December 2024)
- ML20080P726 + (13:50:00, 14 December 2024)
- ML20080P723 + (13:50:01, 14 December 2024)
- RBG-16-085, Responds to Re Ultimate Capacity Analysis of Mark III Containments.Ultimate Capacities of Containment Equipment Hatch & Personnel Airlock Determined to Be 56 Psi & 72 Psi,Respectively + (13:50:01, 14 December 2024)
- ML20080P722 + (13:50:02, 14 December 2024)
- ML20080P714 + (13:50:03, 14 December 2024)
- ML20080P712 + (13:50:04, 14 December 2024)