- 3F1283-29, Responds to NRC Re Violations Noted in IE Insp Rept 50-302/83-26.Corrective Actions:Review of Tech Spec Amends Expanded to Include Operations Qualified Reviewer & Immediate Temporary Change Issued on 830911 + (10:46:02, 14 December 2024)
- ML20083H557 + (10:46:02, 14 December 2024)
- ML20083H551 + (10:46:03, 14 December 2024)
- ML20083H546 + (10:46:04, 14 December 2024)
- ML20083H548 + (10:46:04, 14 December 2024)
- AECM-84-0029, Forwards Mods to FSAR Chapter 14 Re Startup Test Program. Startup Test 25 on MSIV Function Testing Requires Specific Change to Fsar.Review & Approval Requested by 840127 + (10:46:05, 14 December 2024)
- ML20083H540 + (10:46:05, 14 December 2024)
- ML20083H529 + (10:46:06, 14 December 2024)
- 05000338/LER-1983-084-03, /03L-0:on 831202,fire Door Between Clean Charge Room & Auxiliary Bldg Would Not Latch Automatically.Caused by Loose & Missing Screws on Door Hinges.Screws Tightened & Missing Screws Replaced + (10:46:07, 14 December 2024)
- 05000275/LER-1983-026-03, /03L-0:on 831114,prior to Fuel Load,Power Switch to Plant Vent Iodine Sampler RE-24 Found in Off Position. Caused by Personnel Error During Heavy Const Period. Protective Cover Will Be Placed Over Switch + (10:46:09, 14 December 2024)
- ML20083H523 + (10:46:10, 14 December 2024)
- 05000237/LER-1983-081-03, /03L-0:on 831210,west Side Torus Bulkhead Door Found Open.Caused by Contractor in Area.Operator Immediately Closed & Locked Door,Station Dept Heads Reminded to Inform Personnel & Memo Issued + (10:46:12, 14 December 2024)
- ML20083H520 + (10:46:13, 14 December 2024)
- ML20083H518 + (10:46:14, 14 December 2024)
- 05000366/LER-1983-142-03, /03L-0:on 831208,during Performance of MSIV Leakage Control Sys Operability Procedure,Msiv B Leakage Control Sys Isolation Valve Failed to Complete Full Operating Cycle.Caused by Short in Motor + (10:46:15, 14 December 2024)
- 05000395/LER-1983-133-03, /03L-0:on 831123,boron Injection Tank (Bit) Inadvertently Diluted to 19,700 Ppm While Performing Surveillance Testing.Caused by Lifting of Relief Valve XVR-8925.Boron Concentration Restored + (10:46:17, 14 December 2024)
- 0CAN128309, Informs That Core Damage Estimate Procedure Will Be Developed as Result of Review to Satisfy NUREG-0737,Item II.B.3 Re post-accident Sampling Sys & Address Concerns Raised in 830714 & 1031 Ltrs.Schedule Expected by 840131 + (10:46:18, 14 December 2024)
- 05000370/LER-1983-081-03, /03L-0:on 831125,fire Alarm for Fire Detection Zone Efa 188 Received in Control Room & Would Not Reset. Efa 188 Declared Inoperable.Caused by Dirt Accumulation in One Ionization Type Detector.Detector Replaced + (10:46:21, 14 December 2024)
- ML20083H495 + (10:46:22, 14 December 2024)
- FVY-83-126, Responds to NRC 831115 Request for Util Plans & Schedule to Resolve Outstanding Concerns Re IE Bulletin 80-14 Concerning Facility.Results of Reanalysis Effort & Schedule Will Be Provided by 840315 + (10:46:23, 14 December 2024)
- ML20083H486 + (10:46:23, 14 December 2024)
- ML20083H485 + (10:46:24, 14 December 2024)
- RBG-16-669, Forwards Responses to Draft SER Open Items Identified by Core Performance Branch,Per a Schwencer 831206 Request.Ltr Suppls Info Contained in .Attachment 1 Summarizes Open Items & Indicates Changes to Be Made in FSAR + (10:46:24, 14 December 2024)
- RBG-16-607, Interim Deficiency Rept DR-147 Re Weld at End Attachments of Pipe Support Component Supplied by Bergen-Paterson. Investigation Incomplete.Interim or Final Rept Will Be Submitted by 840223 + (10:46:25, 14 December 2024)
- RBG-16-623, Interim Deficiency Rept DR-148 Re Procurement Document Control of Spare Parts.Investigation Incomplete.Next Rept Expected by 840215 + (10:46:25, 14 December 2024)
- 05000313/LER-1983-028-03, /03L-0:on 831130,during Radwaste Processing,Crack Discovered in Discharge Piping of Clean Waste Transfer Pump P-47B.Probably Caused by Overheating of Pipe During Installation of Valve Along W/Piping Stresses + (10:46:27, 14 December 2024)
- 05000272/LER-1983-062-99, /99X-0:on 831122,triaxial time-history Accelograph Inside Bioshield on 81-ft Elevation of Containment Bldg Failed.Cause Not Stated.Accelerometer Will Be Replaced During Next Outage + (10:46:29, 14 December 2024)
- ML20083H466 + (10:46:30, 14 December 2024)
- ML20083H463 + (10:46:30, 14 December 2024)
- 05000317/LER-1983-062-03, /03L-0:on 831129,post-accident Monitoring Instrumentation Channel X Found Inoperable.Caused by Leaking Variable Leg Drain Valve on Pressurizer Level Transmitter. Bonnet & Plug Assembly Replaced + (10:46:32, 14 December 2024)
- ML20083H458 + (10:46:33, 14 December 2024)
- ML20083H456 + (10:46:33, 14 December 2024)
- 05000313/LER-1983-029-03, /03L-0:on 831129,bottoms of Carbon Filter for Penetration Room Ventilation Fans Found Wet.Caused by Water from Hydrogen Purge Sys Carried Over Into Plant Vent During Hydrogen Purge Sys Operation.Filters Replaced + (10:46:35, 14 December 2024)
- ML20083H448 + (10:46:36, 14 December 2024)
- ML20083H444 + (10:46:36, 14 December 2024)
- ML20083H437 + (10:46:37, 14 December 2024)
- ML20083H441 + (10:46:37, 14 December 2024)
- ML20083H419 + (10:46:38, 14 December 2024)
- ML20083H420 + (10:46:38, 14 December 2024)
- ML20083H418 + (10:46:39, 14 December 2024)
- RS-20-030, Submittal of Radiological Emergency Plan Addendum Revision + (10:46:39, 14 December 2024)
- ML20083H414 + (10:46:40, 14 December 2024)
- ML20083H404 + (10:46:41, 14 December 2024)
- ML20083H412 + (10:46:41, 14 December 2024)
- ML20083H398 + (10:46:42, 14 December 2024)
- 05000237/LER-1983-076-03, Unidentified Drywell Leakage Calculated to Be 3.08 Gpm.Caused by Cut in Seal Ring Seating on Feedwater Check Valve Body.Cut silver-soldered & New Seal Ring Installed + (10:46:43, 14 December 2024)
- 1CAN128310, Notifies That B&W Rept Re NUREG-0737,Item II.K.3.5, Reactor Coolant Pump Trip, Will Not Be Available Until Jan 1984. Addl Time Required to Prepare plant-specific Portion of Submittal.Final Submittal Will Be Provided by 840331 + (10:46:46, 14 December 2024)
- ML20083H377 + (10:46:47, 14 December 2024)
- ML20083H375 + (10:46:47, 14 December 2024)
- 05000315/LER-1983-122-03, /03L-0:on 831212,four Ice Condenser Intermediate Deck Doors Found Frozen Shut.Caused by Ice Accumulation Due to Leaking Drain Lines on Air Handlers 4-2A,4-4A & 1-5B.Ice Removed + (10:46:49, 14 December 2024)