Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083H839 + (10:44:23, 14 December 2024)
- ML20083H833 + (10:44:24, 14 December 2024)
- ML20083H830 + (10:44:25, 14 December 2024)
- B10992, Forwards Proprietary Response to Questions Raised at 831213 Meeting Re Probabilistic Safety Study.Info Withheld (Ref 10CFR2.790) + (10:44:26, 14 December 2024)
- ML20083H826 + (10:44:26, 14 December 2024)
- ML20083H820 + (10:44:27, 14 December 2024)
- ML20083H818 + (10:44:28, 14 December 2024)
- ML20083H810 + (10:44:29, 14 December 2024)
- ML20083H806 + (10:44:32, 14 December 2024)
- ML20083H805 + (10:44:33, 14 December 2024)
- ML20083H801 + (10:44:34, 14 December 2024)
- ML20083H795 + (10:44:35, 14 December 2024)
- 05000316/LER-1983-122-03, /03L-0:on 831210,during Surveillance Test on ESF Fan 2-HV-AES-1,suspicious Odor Noted.Cause Undetermined. Coupling Reengaged & Screws Tightened + (10:44:36, 14 December 2024)
- ML20083H782 + (10:44:37, 14 December 2024)
- ML20083H776 + (10:44:38, 14 December 2024)
- 05000316/LER-1983-121-03, /03L-0:on 831209,Fire Door 472 in 4 Kv Room Found Occasionally Stuck in Full Open Position.Caused by Paint Buildup on Floor.High Spot Ground Down & Middle & Lower Door Hinges Shimmed + (10:44:39, 14 December 2024)
- RBG-16-631, Interim Deficiency Rept DR-149 Re post-weld Heat Treatment for Fabricated Pipe Supports Supplied by Bergen-Paterson. Investigation Incomplete.Interim/Final Status Rept Will Be Submitted by 840402 + (10:44:40, 14 December 2024)
- ML20083H770 + (10:44:41, 14 December 2024)
- ML20083H766 + (10:44:42, 14 December 2024)
- 05000373/LER-1983-151-03, /03L-0:on 831128,Functional Test LIS-NR-02, Required for Operating Conditions 2-5 Due 831125 Not Performed Until 831128.Caused by Personnel Error.Stronger Emphasis on Surveillance Program Implemented + (10:44:43, 14 December 2024)
- ML20083H762 + (10:44:45, 14 December 2024)
- 0CAN078309, Responds to NRC Re Violations Noted in IE Insp Repts 50-313/83-10 & 50-368/83-10.Corrective Actions: Procedure 1622.017, Operation of Control Point, Will Be Issued on 830930 + (10:44:46, 14 December 2024)
- 05000311/LER-1983-064-03, /03L-0:on 831202,during Surveillance Test on Low Pressure Carbon Dioxide Fire Suppression Sys,Pilot Valve 2FP377 Did Not Completely Seat.Caused by Frost on Valve Seat.Valve Seated Properly + (10:44:49, 14 December 2024)
- ML20083H741 + (10:44:51, 14 December 2024)
- ML20083H746 + (10:44:51, 14 December 2024)
- ML20083H738 + (10:44:53, 14 December 2024)
- 05000272/LER-1983-061-03, /03L-0:on 831209,reactor Trip Sys & ESF Actuation Sys Instrumentation Surveillance Testing Not Completed within 1 H Limit Required by Tech Specs.Caused by Typographical Error in Procedure + (10:44:54, 14 December 2024)
- ML20083H731 + (10:44:56, 14 December 2024)
- 3F1283-24, Forwards Supplemental Response to Re Violations Noted in IE Insp Rept 50-302/83-14.Corrective Actions:All Other Applicable Welds Reviewed to Verify Proper Weld Coverage.No Discrepancies Revealed + (10:44:57, 14 December 2024)
- ML20083H726 + (10:44:58, 14 December 2024)
- ML20083H725 + (10:44:59, 14 December 2024)
- 05000305/LER-1983-034-03, /03L-0:on 831206,containment Fan Coil Unit 1D Removed from Svc to Repair Svc Water Leaks.Caused by Sand & Water Erosion of Return Bends in Svc Water Cooling Coils. Affected Bends Replaced + (10:45:01, 14 December 2024)
- W3P83-3555, Forwards Public Version of Revised Emergency Plan Implementing Procedures,Including Procedures EP-2-020 Re Contaminated Injured/Ill personnel,EP-2-032 Re Monitoring & Decontamination & EP-2-081 Re Search & Rescue + (10:45:02, 14 December 2024)
- ML20083H717 + (10:45:03, 14 December 2024)
- ML20083H713 + (10:45:04, 14 December 2024)
- 05000311/LER-1983-061-03, /03L-0:on 831207,during Maint Shutdown,Safeguards Equipment Control Channel 2A Inadvertently Actuated While Testing,Causing Vital Bus 2A to Be Deenergized.Caused by Reversing Polarity of Leads + (10:45:06, 14 December 2024)
- ML20083H711 + (10:45:07, 14 December 2024)
- BECO-83-301, Application for Proposed Tech Spec Change 83-15 to License DPR-35,correcting Error in GE Oct 1983 Reload Licensing Submittal for Restart from Refueling Outage 6 + (10:45:11, 14 December 2024)
- ML20083H703 + (10:45:12, 14 December 2024)
- ML20083H700 + (10:45:13, 14 December 2024)
- RBG-16-711, Interim Deficiency Rept DR-137 Re Preheat Requirements for Pipe Support Welds.Investigation Continuing.Next Rept Will Be Provided by 840410 + (10:45:13, 14 December 2024)
- RBG-16-678, Forwards Changes to FSAR Section 2.4 in Response to Items Identified by Environ & Hydrological Engineering Branch in Draft SER Re Local Flooding.Changes Will Be Incorporated Into Next FSAR Amend + (10:45:14, 14 December 2024)
- ML20083H690 + (10:45:15, 14 December 2024)
- 05000267/LER-1983-052-03, /03L-0:on 831208,prestressed Concrete Reactor Vessel Cooling Water Outlet Temp Exceeded 120 F Limit.Caused by Absence of Svc Water Preventing Necessary Heat Exchange. Flow Returned to Sys 46 HX + (10:45:17, 14 December 2024)
- ML20083H676 + (10:45:21, 14 December 2024)
- ML20083H673 + (10:45:22, 14 December 2024)
- ML20083H669 + (10:45:22, 14 December 2024)
- ML20083H663 + (10:45:23, 14 December 2024)
- ML20083H664 + (10:45:23, 14 December 2024)
- ML20083H662 + (10:45:24, 14 December 2024)
- 05000373/LER-1983-148-03, /03L-0:on 831118,bus 142Y Deenergized & Switchgear 136X Equipment Failed to Loadshed.Caused by Main Sensing Contact Welding Closed.Contact Separated & Burnished + (10:45:26, 14 December 2024)