Responds to NRC Re Violations Noted in IE Insp Repts 50-424/83-15 & 50-425/83-15.Corrective Actions:Pullman Power Products Engineering & QA Personnel Admonished to Review Process Sheets Closely
ML20083H741
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/28/1983
From: Foster D
GEORGIA POWER CO.
To: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20083H735 List:
References
GN-288, NUDOCS 8401090431
Download: ML20083H741 (2)


Text

- * - Georg;a Power Company

% 333 Piedmont Avenue Atlanta, Georgia 30308 Telephone 404 526-7726

,L ,-,,

/-

Maihng Address:

Post Office Box 4545 .4 Atlanta, Georgra 30302 9, h

" "G S Ng; 37 Georgia Power D. O. Foster the southem etectnc system Wce President and General Manager Vogtle Project November 28, 1983 United States Nuclear Regulatory Commission File: X7BG10 Office of Inspection and Enforcement Log: GN-288 Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303

Reference:

50-424/83-15,50-425/83-15 Attention: Mr. R. C. Lewis Gentlemen:

The Georgia Power Company wishes to submit the following information concerning the violation discussed in your inspection report 50-424/83-15 and 50-425/83-15:

Violation 50-424.'93-15-01, " Failure to Provide for Code Required Penetrant Examination" - Severity Level IV.

(1) Georgia Power Company acknowledges the discrepancy identified in this violation.

(2) The reasons for the violation are as follows:

a. The piping contractor's (Pullman Power Products) engineer erroneously prepared the wrong process sheets for the welds on isometric drawing 1KA-1201-119-02, Rev.10.
b. The piping contractor's QA document reviewer failed to detect the error in the process sheets.

(3) The lack of penetrant examination requirements in process sheets associated with isometric drawing 1KA-1201-119-02, Rev. 10, is considered to be an isolated case. All other primary loop piping isometrics (twenty drawings in all) and all associated process sheets were examined and found to provide for penetrant examinations.

Isometric drawing 1KA-1201-119-02, R'"i.10, and all associated process sheets, including the one for reaciar voolant pressure boundary weld 119-W-05, have been revised to assure that required penetrant examina-tions are performed.

(4) Pullman Power Products engineering and QA personnel have been admonished to review process sheets closely to assure compliance with all applicable requirements.

8401090431 831230 PDR ADOCK 05000424 G PDR

7 -7 w

--[ v+

, USNRC

. November 28,;1983-Page.2.

Full compliance with-applicable regulatory and code requirements was achieved (5). on November -16, -1983.

- This response'contains no proprietary information and may be placed in the NRC Public' Document > Room upon receipt.

Yours truly, MQ r

"' D. O. Foster REF/D0F/cc

,xc: U. S. Nuclear Regulatory Commission Attn: Victor J. Stello, Jr., Director Office of Inspection and Enforcement Washinaton, D C. '20555 xc: R. J. Kelly' 'J. A. Bailey R. E. Conway O. Batum

. G. F. Head H. H. Gregory.

J. T. Beckham C. W. Hayes-

- D. N. MacLemore E. D. Groover

. D. E. Dutton L. T. Gucwa W. F. Sanders M. Malcom R.-H.JPinson- G. Bockhold B. M. Guthrie P. D. Rice R. A.< Thomas ,

J. L. Vota J

4 6

4 i

T 4

, , , - -- . .-,-,,-,s'.

,c. , - - -wA- .,---,-.,,-m, ,,-,.,,n,, ,,,w,,, , - . . , .,- , . ,-n.-. - - - - ,, ,-- , ,_..,,. - , - , re.,-,