Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083M973 + (10:21:11, 14 December 2024)
- ML20083M966 + (10:21:12, 14 December 2024)
- ML20083M965 + (10:21:13, 14 December 2024)
- RBG-41500, Monthly Operating Rept for Apr 1995 for River Bend Station + (10:21:14, 14 December 2024)
- ML20083M960 + (10:21:15, 14 December 2024)
- ML20083M957 + (10:21:16, 14 December 2024)
- ST-HL-AE-5087, Monthly Operating Repts for Apr 1995 for South Texas Project Electric Generating Station + (10:21:16, 14 December 2024)
- ML20083M952 + (10:21:17, 14 December 2024)
- ML20083M948 + (10:21:18, 14 December 2024)
- ML20083M941 + (10:21:19, 14 December 2024)
- ML20083M939 + (10:21:21, 14 December 2024)
- ML20083M936 + (10:21:22, 14 December 2024)
- ML20083M935 + (10:21:23, 14 December 2024)
- 0CAN098219, Informs of Investigation Initiated to Determine Validity of Deviation Noted in IE Insp Repts 50-313/82-14 & 50-368/82-11 Re NUREG-0578,Item 2.1.6.b, Design of Plant Shielding + (10:21:27, 14 December 2024)
- ML20083M932 + (10:21:27, 14 December 2024)
- AECM-84-0215, Monthly Operating Rept for Mar 1984 + (10:21:28, 14 December 2024)
- W3P84-1005, Advises That Detailed Control Room Design Review Program Plan Scheduled for Submittal on 850131.Majority of Work Performed Prior to Issuance of Suppl 1 to NUREG-0737.Extra Time Needed to Reevaluate Position on Function Requirements + (10:21:29, 14 December 2024)
- ML20083M925 + (10:21:29, 14 December 2024)
- 0CAN018302, Responds to NRC Re Deviations Noted in IE Insp Repts 50-313/82-14 & 50-368/82-11.Corrective Actions:Mods During Current Refueling Outage to Be Completed as Scheduled & Review of LOCA Procedures Completed + (10:21:30, 14 December 2024)
- ML20083M919 + (10:21:30, 14 December 2024)
- ML20083M914 + (10:21:31, 14 December 2024)
- 05000397/LER-1984-024, :on 840317,during Instrument Calibr,Control Room Emergency Filtration Units Initiated Due to Inadvertent Deenergization & Reenergization of Test Equipment.Personnel Cautioned.No Other Corrective Action Necessary + (10:21:32, 14 December 2024)
- AECM-83-033, Interim Deficiency Rept Re Nelson Stud Failures on Embedded Plates.Initially Reported on 821221.Lab Testing of Plates in Progress.Deficiency Reported Per 10CFR21 for Unit 1 & 10CFR50.55(e) for Unit 2.Final Rept Expected by 830315 + (10:21:33, 14 December 2024)
- NRC-95-0056, Comment Supporting Proposed Rule 10CFR50 Re Primary Reactor Containment Leakage Testing + (10:21:34, 14 December 2024)
- 3F0484-14, Forwards Third Quarterly Progress Rept,Crystal River Studies, Detailing Activities Completed Through Feb 1984. Util to EPA Encl + (10:21:35, 14 December 2024)
- ML20083M903 + (10:21:35, 14 December 2024)
- 0CAN118221, Responds to NRC Re Violations Noted in IE Insp Repts 50-313/82-14 & 50-368/82-11.Corrective Actions: Procedure 1603.003, Radioactive Matl Shipments, Revised to Ensure Certification Attached to Shipping Papers + (10:21:36, 14 December 2024)
- 2CAN128208, Responds to NRC Re Violations Noted in IE Insp Rept 50-368/82-32.Corrective Actions:Procedural Changes Will Be Made to Require Preplanning Re Design Change Package Installation + (10:21:36, 14 December 2024)
- ML20083M888 + (10:21:37, 14 December 2024)
- 05000335/LER-1982-069-03, /03L-0:on 821227,control Element Assembly (CEA) 43 Slipped 45 Inches During Periodic CEA Exercise.Cause Not Determined.Cea 43 Restored to Normal Position + (10:21:39, 14 December 2024)
- ML20083M882 + (10:21:42, 14 December 2024)
- ML20083M878 + (10:21:43, 14 December 2024)
- ML20083M873 + (10:21:44, 14 December 2024)
- ML20083M870 + (10:21:45, 14 December 2024)
- ML20083M868 + (10:21:46, 14 December 2024)
- ML20083M867 + (10:21:47, 14 December 2024)
- W3P84-1009, Advises That NRC 840330 Request for Info Re BTP Rsb 5-1 Satisfied,Per Sser 5.CEN-259, Evaluation of Natural Circulation Cooldown Test... Demonstrated Applicability of Natural Circulation/Boron Mixing Test + (10:21:47, 14 December 2024)
- ML20083M864 + (10:21:48, 14 December 2024)
- ML20083M853 + (10:21:49, 14 December 2024)
- ML20083M862 + (10:21:49, 14 December 2024)
- ML20083M851 + (10:21:50, 14 December 2024)
- 05000318/LER-1995-004, :on 950414,fire Occurred in Section of Expansion Joint Matl in K Line Wall,Burning Approx Three Linear Feet of Cork Matl.Caused by Sparks from Welding Near Wall.Fire Watches Posted & Walkdown Performed + (10:21:52, 14 December 2024)
- ML20083M848 + (10:21:53, 14 December 2024)
- 05000335/LER-1982-069, Forwards LER 82-069/03L-0 + (10:21:54, 14 December 2024)
- 05000317/LER-1995-001-01, :on 950415,Unit 1 Entered TS 3.0.3 When EDG Supplying Backup Power Became Inoperable.Caused by Leaking Fuel Injector Pump Due to Improper Drainage.Drain Lines Cleaned + (10:21:56, 14 December 2024)
- AECM-84-0235, Forwards Rev 0 to Third Party Review of Grand Gulf Nuclear Station Tech Spec Review Program + (10:21:57, 14 December 2024)
- ML20083M844 + (10:21:57, 14 December 2024)
- NRC-95-4455, Provides W Updated Description of Milestones That Represent Resolution Path for AP600 Passive Sys Reliability + (10:21:58, 14 December 2024)
- ML20083M833 + (10:21:59, 14 December 2024)
- ML20083M831 + (10:22:00, 14 December 2024)
- AECM-83-0055, Suppl to 820809 Final Part 21 Rept for Potentially Reportable Deficiency Re Relay Failure in Div 1 Standby Diesel Generator.Magnecraft W88LCPX-12 Relay Will Be Replaced Since Sufficient Contacts Not Available for Mod + (10:22:01, 14 December 2024)
- NRC-84-0068, Forwards Proprietary & Nonproprietary Westinghouse Interconnecting Wiring Diagrams & Process Control Block Diagrams Associated W/Pressurizer Pressure Input.Proprietary Info Withheld (Ref 10CFR2.790) + (10:22:01, 14 December 2024)