Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083N237 + (10:20:00, 14 December 2024)
- ML20083N239 + (10:20:00, 14 December 2024)
- ML20083N234 + (10:20:01, 14 December 2024)
- ML20083N225 + (10:20:02, 14 December 2024)
- ML20083N228 + (10:20:02, 14 December 2024)
- 05000395/LER-1982-064-03, /03L-0:on 821223,nuclear Sampling Sys Valves 9398A (B) Failed to Close within Required Isolation Time Identified in Surveillance Requirement 4.6.4.3.Caused by Crud Buildup on Valve Seats.Crud Buildup Dislodged + (10:20:04, 14 December 2024)
- ML20083N219 + (10:20:05, 14 December 2024)
- ML20083N218 + (10:20:05, 14 December 2024)
- ML20083N214 + (10:20:06, 14 December 2024)
- ML20083N215 + (10:20:06, 14 December 2024)
- ML20083N209 + (10:20:07, 14 December 2024)
- ML20083N208 + (10:20:08, 14 December 2024)
- ML20083N206 + (10:20:08, 14 December 2024)
- ML20083N199 + (10:20:09, 14 December 2024)
- 05000395/LER-1982-064, Forwards LER 82-064/03L-0.Detailed Event Analysis Encl + (10:20:10, 14 December 2024)
- ML20083N194 + (10:20:10, 14 December 2024)
- ML20083N193 + (10:20:11, 14 December 2024)
- ML20083N192 + (10:20:11, 14 December 2024)
- ML20083N191 + (10:20:12, 14 December 2024)
- ML20083N183 + (10:20:13, 14 December 2024)
- ML20083N185 + (10:20:13, 14 December 2024)
- ML20083N182 + (10:20:14, 14 December 2024)
- ML20083N178 + (10:20:17, 14 December 2024)
- ML20083N175 + (10:20:18, 14 December 2024)
- 05000324/LER-1982-135-03, /03L-0:on 821227,low Pressure Microswitch of Primary Containment Isolation Sys HPCI Steam Supply Pressure Instrument 2-E41-PSL-N001D Would Not Actuate During Test PT-02.1.2P.Caused by End of Component Life + (10:20:23, 14 December 2024)
- 05000318/LER-1983-005-03, /03L-0:on 830107,during Surveillance Testing, Shutdown Cooling Flow Lost.When Circulation Actuation Signal Manually Initiated,Operating Low Pressure Safety Injection Pump Stopped.Caused by Inadequate Procedure + (10:20:25, 14 December 2024)
- 05000318/LER-1983-005, Forwards LER 83-005/03L-0 + (10:20:27, 14 December 2024)
- ML20083N149 + (10:20:27, 14 December 2024)
- ML20083N135 + (10:20:28, 14 December 2024)
- 05000324/LER-1982-135, Forwards LER 82-135/03L-0 + (10:20:29, 14 December 2024)
- ML20083N129 + (10:20:29, 14 December 2024)
- ML20083N126 + (10:20:30, 14 December 2024)
- ML20083N112 + (10:20:32, 14 December 2024)
- ML20083N109 + (10:20:33, 14 December 2024)
- ML20083N110 + (10:20:33, 14 December 2024)
- ML20083N100 + (10:20:35, 14 December 2024)
- ML20083N099 + (10:20:35, 14 December 2024)
- 05000254/LER-1982-039-03, /03L-0:on 821224,diesel Generator 1/2 Failed to Start Following Preventive Maint.Caused by Crack in 1/4-inch Copper Air Line.Crack Due to Crimp in Right Angle Bend in Line & Fatigue Failure at Stress Point.New Line Rebuilt + (10:20:37, 14 December 2024)
- ML20083N083 + (10:20:38, 14 December 2024)
- ML20083N081 + (10:20:39, 14 December 2024)
- ML20083N079 + (10:20:40, 14 December 2024)
- ML20083N071 + (10:20:40, 14 December 2024)
- ML20083N068 + (10:20:41, 14 December 2024)
- ML20083N064 + (10:20:42, 14 December 2024)
- ML20083N054 + (10:20:42, 14 December 2024)
- ML20083N053 + (10:20:43, 14 December 2024)
- ML20083N051 + (10:20:44, 14 December 2024)
- ML20083N050 + (10:20:45, 14 December 2024)
- ML20083N049 + (10:20:46, 14 December 2024)
- ML20083N048 + (10:20:46, 14 December 2024)
- ML20083N045 + (10:20:50, 14 December 2024)
- ML20083N040 + (10:20:53, 14 December 2024)