Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083P708 + (10:13:40, 14 December 2024)
- 05000271/LER-1995-010, :on 950420,continous Fire Watch Was Not Maintained for Degraded Fire Barrier Penetration Seals Due to Inadequate Administrative Controls.Reinstalled Enclosure Box within Less One Hour + (10:13:42, 14 December 2024)
- ML20083P703 + (10:13:43, 14 December 2024)
- 3F0595-08, Responds to Questions Posed by NRC Re FPC Rept of Fire Endurance Tests Conducted on Barriers Constructed of Thermo-Lag & Combination of Thermo-Lag & Mecatiss Matl, Provided by FPC Per GL 86-10 + (10:13:44, 14 December 2024)
- ML20083P696 + (10:13:44, 14 December 2024)
- ML20083P691 + (10:13:45, 14 December 2024)
- NRC-95-0050, Forwards Response to NRC Re Violations Noted in Insp Rept 50-341/95-07.Corrective Actions:Reviewed Procedures Against Appropriate Iee Stds to Assure Proper Administrative Control for Measurements + (10:13:45, 14 December 2024)
- ML20083P690 + (10:13:46, 14 December 2024)
- ML20083P687 + (10:13:47, 14 December 2024)
- ML20083P686 + (10:13:47, 14 December 2024)
- ML20083P684 + (10:13:48, 14 December 2024)
- ML20083P682 + (10:13:49, 14 December 2024)
- ML20083P683 + (10:13:49, 14 December 2024)
- 05000416/LER-1982-185-03, /03L-0:on 821229,smoke Detection Zone 2-17 (East Corridor of Auxiliary Bldg;Elevation 103 Ft) Alarmed & Would Not Reset.No Fumes or Smoke Present.Caused by Spurious Actuation.Zone Returned to Operation on 830112 + (10:13:51, 14 December 2024)
- RBG-17-552, Forwards Results of Util Studies Re Effect on Plant Structures & Slopes of Ponding in Unit 2 Excavation Identified as Open Item in Draft Ser.Ponding Will Have No Affect on Structural Integrity of Adjacent Plant Structures + (10:13:53, 14 December 2024)
- 05000259/LER-1982-101, Forwards LER 82-101/03L-0 + (10:13:54, 14 December 2024)
- ML20083P665 + (10:13:54, 14 December 2024)
- ML20083P664 + (10:13:55, 14 December 2024)
- ML20083P658 + (10:13:56, 14 December 2024)
- PLA-1482, Responds to NRC Re Violations Noted in IE Insp Repts 50-387/82-40 & 50-388/82-12.Corrective Actions: Requirement to Verify Suppression Pool Temp Per Tech Spec Section 4.6.2.1.b.1 Added to Operating Test Procedure + (10:13:56, 14 December 2024)
- 05000416/LER-1982-185, Forwards LER 82-185/03L-0 + (10:13:57, 14 December 2024)
- ML20083P653 + (10:13:57, 14 December 2024)
- 05000387/LER-1982-079-03, /03L-0:on 821222,during Recovery from Startup Program Test,Rcs Temp Exceeded 100 F/H Heatup Rate.Caused by Operator Error.Event Will Be Incorporated Into Operator Training & Requalification.Procedures Revised + (10:14:02, 14 December 2024)
- ML20083P644 + (10:14:03, 14 December 2024)
- ML20083P647 + (10:14:03, 14 December 2024)
- ML20083P640 + (10:14:04, 14 December 2024)
- 05000387/LER-1982-079, Forwards LER 82-079/03L-0 + (10:14:05, 14 December 2024)
- ML20083P633 + (10:14:05, 14 December 2024)
- ML20083P632 + (10:14:06, 14 December 2024)
- ML20083P627 + (10:14:07, 14 December 2024)
- ML20083P630 + (10:14:07, 14 December 2024)
- ML20083P625 + (10:14:08, 14 December 2024)
- 05000289/LER-1982-016-03, /03L-0:on 821222,during Cold Shutdown,Fire Barrier Penetration Seal 489 Identified as Having Unacceptable Void Under Cable Tray Support Angle.Temporary Damming Matl Installed on Both Sides of Seal + (10:14:09, 14 December 2024)
- ML20083P621 + (10:14:10, 14 December 2024)
- ML20083P610 + (10:14:11, 14 December 2024)
- NRC-95-4457, Forwards Nonproprietary & Proprietary Versions of Info in Support of NRC RAI 440.251 on AP600 Design.Proprietary Version of Info Withheld from Public Disclosure Per 10CFR2.790 + (10:14:11, 14 December 2024)
- 05000289/LER-1982-016, Forwards LER 82-016/03L-0 + (10:14:12, 14 December 2024)
- ML20083P607 + (10:14:12, 14 December 2024)
- ML20083P605 + (10:14:13, 14 December 2024)
- TXX-4149, Interim Deficiency Rept Re Vendor Documentation of QA Inspector Eye Exam Records.Initially Reported on 840215. Evaluation Completion Expected by 840515 + (10:14:14, 14 December 2024)
- ML20083P602 + (10:14:14, 14 December 2024)
- 05000368/LER-1984-008, :on 840312,reactor Tripped Due to Low Steam Generator Level in Steam Generator A.Caused by Normal Level Control Difficulties at Low Steam Demand Conditions. Corrective Actions Under Consideration + (10:14:16, 14 December 2024)
- ML20083P594 + (10:14:17, 14 December 2024)
- ML20083P593 + (10:14:18, 14 December 2024)
- 1CAN059507, Application for Amend to License DPR-51,verifying Adequate SW Flow to Each Train of Reactor Bldg Emergency Cooling + (10:14:19, 14 December 2024)
- W3P83-0251, Forwards Documentation Re Progress &/Or Completion of All Confirmatory Items in Seismic Qualification Review Team audit.NSS-PE-25, Boric Acid Tank Circulating Valve, Only Remaining Confirmatory Item + (10:14:19, 14 December 2024)
- ML20083P581 + (10:14:20, 14 December 2024)
- STC-20-022, Notification of Acceptance to the Advanced Health Physics (H-201) Course - Virtually: July 20-24, 2020 + (10:14:21, 14 December 2024)
- ML20083P577 + (10:14:23, 14 December 2024)
- ML20083P571 + (10:14:24, 14 December 2024)
- ML20083P575 + (10:14:24, 14 December 2024)
- ML20083P567 + (10:14:25, 14 December 2024)