|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20210R3501999-08-13013 August 1999 Application for Amends to Licenses NPF-11 & NPF-18,allowing Performance of CRDM & Ni Replacement to Not Be Considered Core Alterations During Operational Condition 5,Refueling, While Fuel Is in Reactor Vessel ML20210Q3951999-08-0606 August 1999 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Section 3/4.6.4, Vacuum Relief, by Removing Specific Operability Requirements Related to Position Indication for Suppression chamber-drywell Vacuum Breakers ML20209G3551999-07-14014 July 1999 Application for Amends to Licenses NPF-11 & NPF-18 to Revise TS Allowing Both LaSalle County Units to Operate at Uprated Power Level of 3489 Mwt.Proprietary Rev 2 to NEDC-32701P, Power Uprate Sar..., Encl.Proprietary Encl Withheld ML20209D3881999-07-0707 July 1999 Suppl Application for Amends to Licenses NPF-11 & NPF-18, Changing Proposed Degradation Voltage Low Limit Setpoint & Adding High Limit Setpoint & Allowable,Per 981109 Application ML20209D3171999-07-0707 July 1999 Application for Amends to Licenses NPF-11 & NPF-18,revising MCPR Safety Limit & Adding Approved Siemens Power Corp Methodology List of TRs for COLR ML20206T1331999-05-19019 May 1999 Application for Amends to Licenses NPF-11 & NPF-18, Relocating TS Section 3/4.4.4, Chemistry, to UFSAR to Be Consistent with NUREG-1433,rev 1 ML20206J6921999-05-0505 May 1999 Application for Amends to Licenses NPF-11 & NPF-18,to Revise Basis for Evaluation of Vr Exhaust Plenum Masonry Walls for Plant.With One Oversize Drawing ML20195E0471998-11-0909 November 1998 Application for Amends to Licenses NPF-11 & NPF-18,to Modify Degraded Voltage Second Level Undervoltage Relay Setpoint & Allowable Value in TS 3/4.3.3 & TS Table 3.3.3-2 ML20195D9931998-11-0909 November 1998 Application for Amends to Licenses NPF-11 & NPF-18,to Add Automatic Primary Containment Isolation on Ambient & Differential Temperature to High for RWCU Sys Pump,Pump Valve,Holdup Pipe & Filter/Demineralizer Valve Rooms ML20154M4551998-10-16016 October 1998 Application for Amends to Licenses NPF-11 & NPF-18,lowering Power Level Below Which TCV & TSV Closure Scram Signals & EOC-RPT Signal Are Not in Effect.Proprietary Rev 1,suppl 1 to NEDC-31531P,encl.Proprietary Info Withheld ML20217B5721998-04-16016 April 1998 Supplemental Application for Amend to License NPF-11, Changing Leak & Break Detection Isolation Instrumentation. Util Response to RAI & Rev 1 to Calculation L-001443,encl ML20217J2731998-03-24024 March 1998 Application for Amends to Licenses NPF-11 & NPF-18,deleting License Condition 2.C.(30)(a) in Entirety & Revising TS 6.1-3 ML20203G4871997-12-12012 December 1997 Application for Amends to Licenses NPF-11 & NPF-18,modifying Bypass Logic for Msli Valve Isolation Actuation Instrumentation on Condenser Low Vacuum as Stated in Note of TS Tables 3.3.2-1 & 4.3.2.1-1 ML20199K5181997-11-24024 November 1997 Application for Amend to License NPF-11,adding Automatic Primary Containment Isolation on Ambient & Differential Temp High for RWCU Pump,Pump Valve,Holdup Pipe & F/D Valve Rooms. W/Environ Assessment Statement & Calculations ML20211P9171997-10-15015 October 1997 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Unnecessary Details from Accident Monitoring Instrumentation Surveillance Requirements ML20217C3581997-09-26026 September 1997 Application for Amends to Licenses NPF-11 & NPF-18,adding Ventilation Filter Testing Program ML20141J5521997-08-12012 August 1997 Application for Amends to Licenses NPF-11 & NPF-18,proposing Deletion of Surveillance Requirement 4.7.1.3.c & Addressing Sedimentation Concerns in Intake Structure Under Svc Water Performance Monitoring Program,Iaw GL 89-13 ML20148Q4161997-07-0101 July 1997 Application for Amends to Licenses NPF-11 & NPF-18,revising TSs to Reflect Improvements Made to Control Room Ventilation Air Intake Radiation Monitoring Sys Logic to Reduce Spurious Actuation of Emergency Filtration Mode of Operation ML20148U2551997-07-0101 July 1997 Application for Amends to Licenses NPF-11 & NPF-18,changing Definition of Channel Calibration & Correcting Miscellaneous Errors in TS & Bases ML20141L0311997-05-27027 May 1997 Application for Amends to Licenses NPF-11 & NPF-18, Incorporating Restructured Station Organization,Change to Submittal Frequency of Radiological Effluent Release Rept & Other Administration Changes ML20137W5071997-04-14014 April 1997 Application for Amends to Licenses NPF-11 & NPF-18,changing TS to Reflect Design Change to Trip Logic for Feedwater/Main Turbine Trip Sys Actuation Instrumentation for Reactor Vessel Water Level-High,Level 8 Trip Function ML20134A1781997-01-20020 January 1997 Application for Amends to Licenses NPF-11 & NPF-18, Requesting Relocation of Alarm Only Instrumentation Surveillance Requirements & Adding or Changing Action Statement for Selected TSs ML20135E6551996-12-0202 December 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising Section 3.4.2 SRV Configuration to Include Only 13 of Current 18 SRVs ML20129J4461996-10-31031 October 1996 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Seismic Monitoring Instrumentation Requirements ML20116A9501996-07-15015 July 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising App A,Ts,Per 10CFR50.90 to Relocate Fire Protection Requirements of Listed TS Sections ML20113C8581996-06-21021 June 1996 Application for Amends to Licenses NPF-11 & NPF-18,including Extension of 18 Month Surveillance Interval & One Time Change to TS to Extend AOT for Each Subsystem of CR & Auxiliary Electric Equipment Room Emergency Filtration Sys ML20107F0541996-04-16016 April 1996 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Selected Response Time Testing Requirements ML20101R1941996-04-0909 April 1996 Application for Amends to Licenses NPF-11 & NPF-18,providing Justification for Deleting Scram & Isolations on MSL High Radiation & Inoperable Trips as Well as Raising MSLRM Sys Alarm Setpoints Above New HWC Background ML20107A8351996-04-0808 April 1996 Application for Amends to Licenses NPF-11 & NPF-18, Reflecting Transition of Fuel Supplier from GE to Siemens Power Corp.Nonproprietary & Proprietary Versions of EMF-94-217,Rev 1 Repts Encl.Proprietary Rept Withheld ML20097D6451996-02-0909 February 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising TS to Support Elimination of MSIV Leakage Control Sys & Instead Use MSL Drains & Condenser to Process MSIV Leakage ML20096G3261996-01-18018 January 1996 Application for Amends to Licenses NPF-11 & NPF-18,changing Setpoints for Automatic Primary Containment Isolation on MSL Tunnel Differential Temp High & Deleting Automatic Isolation Function on MSL Tunnel Temp High ML20095K6931995-12-21021 December 1995 Application for Amends to Licenses NPF-11 & NPF-18,deleting TS LCO 3.4.2,Action Statement B ML20093D4251995-10-0202 October 1995 Application for Amend to License NPF-11,revising SRV Safety Function Lift Setting Tolerance.Nonproprietary & Proprietary Versions of GE SRV Setpoint Tolerance Relaxation Analysis Encl.Proprietary Analysis Withheld ML20091P8901995-08-28028 August 1995 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating MSIV Leakage Control Sys & Increasing MSIV Leakage Limits,Including Request for Exemption for MSIV Leakages from Acceptance Test Criteria in App J of 10CFR50 ML20084U2921995-06-0808 June 1995 Application for Amends to Licenses NPF-11,NPF-18,NPF-72, NPF-77,NPF-37 & NPF-66.Amends Would Revise SRs & Administrative Requirements Associated W/Edgs ML20084C2221995-05-23023 May 1995 Application for Amends to Licenses NPF-11 & NPF-18, Clarifying Described Equipment out-of-svc Options ML20083P6211995-05-19019 May 1995 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Requirement That Verifies Each Fire Protection Valve in Correct Position at Least Once Per 31 Days ML20082J9261995-04-11011 April 1995 Application for Amends to Licenses NPF-11 & NPF-18,extending Specific 18 Month TS Surveillance Requirements to Allow Surveillance Testing ML20087H7851995-03-31031 March 1995 Application for Amend to License NPF-18,revising SRV Safety Function Lift Setting Tolerances.Nonproprietary & Proprietary GE SRV Setpoint Relaxation Analysis Encl. Proprietary GE SRV Setpoint Relaxation Analysis Withheld ML20078H1441995-01-30030 January 1995 Application for Amend to License NPF-18,requesting Emergency Amend to TS 3.3.1,for One Time Extension of Functional Test for Main Steam Line Isolation Valve - Closure Scram Functional Unit in RPS ML20077S2901995-01-13013 January 1995 Application for Amends to Licenses NPF-11 & NPF-18,to Revise Pressure Alarm Setpoint Allowable Values for ECCS & RCIC Sys Keep Filled Pressure Instrumentation Channels ML20078R7031994-12-14014 December 1994 Application for Amends to Licenses NPF-11 & NPF-18,revising TSs to Minimize Unnecessary Testing & Excessively Restrictive AOT for Certain Actuation Instrumentation. Rev 3 to MDE-83-0485 & Rev 1 to RE-025 Encl.Encls Withheld ML20078B9491994-10-24024 October 1994 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Section 3.6.Exemption Requests from 10CFR50,App J Requirements Encl ML20069J7671994-06-0909 June 1994 Application for Amends to Licenses NPF-11 & NPF-18, Implementing Partial Application of GE ARTS Program.Ge Proprietary Rept NEDC-31531P, ARTS Improvements Program Analysis... Encl.Rept Withheld (Ref 10CFR2.790(b)) ML20065A1871994-03-22022 March 1994 Application for Amends to Licenses NPF-11 & NPF-18,deleting TS 3/4.6.1.5, Primary Containment Structural Integrity ML20063F3081994-01-28028 January 1994 Application for Exigent Amends to Licenses NPF-11 & NPF-18, Revising TS 3.3.1 & 3.3.4 to Extend Surveillance Test Interval from Monthly to Quarterly.Ge Proprietary TS Improvement Analysis Encl.Ge Proprietary Analysis Withheld ML20063E1631994-01-24024 January 1994 Application for Amends to Licenses NPF-11 & NPF-18,deleting Requirement for Response Time Testing Where Required Time Corresponds to Diesel Start Time from TS Table 3.3.2-3,per Line Item 5 of GL 93-05 & NUREG-1366 ML20063B2311994-01-21021 January 1994 Suppl to 931228 Application for Amends to Licenses NPF-11 & NPF-18,changing TS Bases Section B 3/4 2-6 to Include Ref to Plant LOCA Analysis Performed by GE ML20058K3371993-12-10010 December 1993 Application for Exigent Amend to License NPF-11,revising TS 3.4.2, Safety Relief Valves, Adding Footnote to Exempt Safety/Relief Valves 1B21-F013B & 1B21-F013F from Requirements of TS 4.0.3 ML20058A8661993-11-17017 November 1993 Application for Emergency Amends to Licenses NPF-11 & NPF-18,requesting NRC Approval of USQ Re Existing Condition for Which Operator Action Proposed for Tripping Mechanical Vacuum Pump in Place of Automatic Trip 1999-08-06
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20212M2531999-10-0101 October 1999 Amends 134 & 119 to Licenses NPF-11 & NPF-18,respectively, Relocate TS 3/4.4.4, Chemistry, from TS to UFSAR & to Administrative Technical Requirement Incorporated Into UFSAR by Reference ML20210R3501999-08-13013 August 1999 Application for Amends to Licenses NPF-11 & NPF-18,allowing Performance of CRDM & Ni Replacement to Not Be Considered Core Alterations During Operational Condition 5,Refueling, While Fuel Is in Reactor Vessel ML20210Q3951999-08-0606 August 1999 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Section 3/4.6.4, Vacuum Relief, by Removing Specific Operability Requirements Related to Position Indication for Suppression chamber-drywell Vacuum Breakers ML20209G3551999-07-14014 July 1999 Application for Amends to Licenses NPF-11 & NPF-18 to Revise TS Allowing Both LaSalle County Units to Operate at Uprated Power Level of 3489 Mwt.Proprietary Rev 2 to NEDC-32701P, Power Uprate Sar..., Encl.Proprietary Encl Withheld ML20209D3881999-07-0707 July 1999 Suppl Application for Amends to Licenses NPF-11 & NPF-18, Changing Proposed Degradation Voltage Low Limit Setpoint & Adding High Limit Setpoint & Allowable,Per 981109 Application ML20209D3171999-07-0707 July 1999 Application for Amends to Licenses NPF-11 & NPF-18,revising MCPR Safety Limit & Adding Approved Siemens Power Corp Methodology List of TRs for COLR ML20207E9051999-06-0303 June 1999 Amends 133 & 118 to Licenses NPF-11 & NPF-18,respectively, Revising TS 3/4.4.2 to Reduce Number of Required SRVs ML20206T1331999-05-19019 May 1999 Application for Amends to Licenses NPF-11 & NPF-18, Relocating TS Section 3/4.4.4, Chemistry, to UFSAR to Be Consistent with NUREG-1433,rev 1 ML20206J6921999-05-0505 May 1999 Application for Amends to Licenses NPF-11 & NPF-18,to Revise Basis for Evaluation of Vr Exhaust Plenum Masonry Walls for Plant.With One Oversize Drawing ML20205K4961999-04-0707 April 1999 Corrected Tech Spec Pages 3/4 3-8 & 3/4 3-41 for Amend 114 to License NPF-18,correcting Typos ML20204B3951999-03-16016 March 1999 Amends 131 & 116 to Licenses NPF-11 & NPF-18,respectively, Revising TS to Reflect Use of Siemens Power Corp AFTRIUM-9B Fuel ML20203G4761999-02-16016 February 1999 Amend 115 to License NPF-18,revising TS 3/4.3.2, Isolation Actuation Instrumentation, to Add/Revise Various Isolation Setpoints for Leak Detection Instrumentation ML20203H9221999-02-12012 February 1999 Amends 130 & 114 to Licenses NPF-11 & NPF-18,respectively, Revising TS to Lower Power Level (from 30% to 25% Rated Thermal Power) Below Which TCV & TSV Closure Scram Signals & end-of Cycle Recirculation Pump Trip Signal Not in Effect ML20195E0471998-11-0909 November 1998 Application for Amends to Licenses NPF-11 & NPF-18,to Modify Degraded Voltage Second Level Undervoltage Relay Setpoint & Allowable Value in TS 3/4.3.3 & TS Table 3.3.3-2 ML20195D9931998-11-0909 November 1998 Application for Amends to Licenses NPF-11 & NPF-18,to Add Automatic Primary Containment Isolation on Ambient & Differential Temperature to High for RWCU Sys Pump,Pump Valve,Holdup Pipe & Filter/Demineralizer Valve Rooms ML20154M4551998-10-16016 October 1998 Application for Amends to Licenses NPF-11 & NPF-18,lowering Power Level Below Which TCV & TSV Closure Scram Signals & EOC-RPT Signal Are Not in Effect.Proprietary Rev 1,suppl 1 to NEDC-31531P,encl.Proprietary Info Withheld ML20197D0891998-09-0909 September 1998 Corrected TS Page 3/4 3-15 of Amend 129 Issued to FOL NPF-11.TS Page Corrected with Revised Setpoint & Allowable Value ML20236K8431998-07-0606 July 1998 Amend 129 to License NPF-11,revising TS 3/4 3.2, Isolation Actuation Instrumentation, to Add/Revise Various Isolation Setpoints for Leak Detection Instrumentation ML20236F7891998-06-26026 June 1998 Amends 128 & 113 to Licenses NPF-11 & NPF-18,respectively, Revising TS Section 6, Administrative Controls, to Incorporate Revised Organizational Titles & Delete Unit 1 FOL Conditon 2.C.(30)(a) ML20249A7291998-06-10010 June 1998 Amends 127 & 112 to Licenses NPF-11 & NPF-18,respectively, Relocating Certain Requirements Re Fire Protection from TS to Updated Final Safety Analysis Rept ML20216C6791998-05-13013 May 1998 Amends 126 & 111 to Licenses NPF-11 & NPF-18,respectively, Revising TSs to Upgrade Ventilation Filter Testing Program to Latest Industry Stds & Specifying That Auxiliary Electric Equipment Room Required to Be Habitable During Accidents ML20217K8201998-04-27027 April 1998 Amends 125 & 110 to Licenses NPF-11 & NPF-18,respectively, Revising TS for Standby Gas Treatment Sys to Upgrade Ventilation Filter Testing Program to Latest Industry Standards ML20217B5721998-04-16016 April 1998 Supplemental Application for Amend to License NPF-11, Changing Leak & Break Detection Isolation Instrumentation. Util Response to RAI & Rev 1 to Calculation L-001443,encl ML20216G9571998-04-14014 April 1998 Amends 124 & 109 to Licenses NPF-11 & NPF-18,respectively, Revise Bypass Logic for Main Steam Isolation Valve Isolation Actuation Instrumentation on Condenser Low Vacuum as Stated in TS Tables 3.3.2-1 & 4.3.2.1-1 ML20217J2731998-03-24024 March 1998 Application for Amends to Licenses NPF-11 & NPF-18,deleting License Condition 2.C.(30)(a) in Entirety & Revising TS 6.1-3 ML20197A5341998-02-17017 February 1998 Amends 123 & 108 to Licenses NPF-11 & NPF-18,respectively, Eliminating Unnecessary Detail from Accident Monitoring Instrumentation SR (TS Table 4.3.7.5-1) ML20202E4381998-01-23023 January 1998 Amends 122 & 107 to Licenses NPF-11 & NPF-18,respectively, Deleting TS SR 4.7.1.3.c Which Requires That Every 18 Months All Areas within Screenhouse Behind Bargrill Be Inspected ML20203G4871997-12-12012 December 1997 Application for Amends to Licenses NPF-11 & NPF-18,modifying Bypass Logic for Msli Valve Isolation Actuation Instrumentation on Condenser Low Vacuum as Stated in Note of TS Tables 3.3.2-1 & 4.3.2.1-1 ML20199K5181997-11-24024 November 1997 Application for Amend to License NPF-11,adding Automatic Primary Containment Isolation on Ambient & Differential Temp High for RWCU Pump,Pump Valve,Holdup Pipe & F/D Valve Rooms. W/Environ Assessment Statement & Calculations ML20211P9171997-10-15015 October 1997 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Unnecessary Details from Accident Monitoring Instrumentation Surveillance Requirements ML20211P3061997-10-0909 October 1997 Amends 121 & 106 to Licenses NPF-11 & NPF-18,respectively, Revising TS Table 3.3.7.1-1, Radiation Monitoring Instrumentation, to Require Two Channels to Be Operable Per Trip Sys ML20217C3581997-09-26026 September 1997 Application for Amends to Licenses NPF-11 & NPF-18,adding Ventilation Filter Testing Program ML20211G3071997-09-19019 September 1997 Errata to Amend 118 & 103 to Licenses NPF-11 & NPF-18, Respectively ML20211A9511997-09-15015 September 1997 Amends 120 & 105 to Licenses NPF-11 & NPF-18,respectively, Revising TS Definition 1.4,Channel Calibration,To Allow Alternative Method of Calibrating Thermocouples & Resistance Temperature Detector Sensors ML20141J5521997-08-12012 August 1997 Application for Amends to Licenses NPF-11 & NPF-18,proposing Deletion of Surveillance Requirement 4.7.1.3.c & Addressing Sedimentation Concerns in Intake Structure Under Svc Water Performance Monitoring Program,Iaw GL 89-13 ML20149E8101997-07-16016 July 1997 Amends 118 & 103 to Licenses NPF-11 & NPF-18,respectively, Revise TS for Various Alarm or Indication Only Instruments. Amends Relocate SR for Selected Instrumentation from TS to Licensee Controlled Documents or Replace Selected SR ML20148U2551997-07-0101 July 1997 Application for Amends to Licenses NPF-11 & NPF-18,changing Definition of Channel Calibration & Correcting Miscellaneous Errors in TS & Bases ML20148Q4161997-07-0101 July 1997 Application for Amends to Licenses NPF-11 & NPF-18,revising TSs to Reflect Improvements Made to Control Room Ventilation Air Intake Radiation Monitoring Sys Logic to Reduce Spurious Actuation of Emergency Filtration Mode of Operation ML20141L0311997-05-27027 May 1997 Application for Amends to Licenses NPF-11 & NPF-18, Incorporating Restructured Station Organization,Change to Submittal Frequency of Radiological Effluent Release Rept & Other Administration Changes ML20137W5071997-04-14014 April 1997 Application for Amends to Licenses NPF-11 & NPF-18,changing TS to Reflect Design Change to Trip Logic for Feedwater/Main Turbine Trip Sys Actuation Instrumentation for Reactor Vessel Water Level-High,Level 8 Trip Function ML20134C1661997-01-29029 January 1997 Amends 117 & 102 to Licenses NPF-11 & NPF-18,respectively, Relocating Requirements of TS 3/4.3.7.2 & Assosiated Bases from TS to licensee-controlled Documents ML20134A1781997-01-20020 January 1997 Application for Amends to Licenses NPF-11 & NPF-18, Requesting Relocation of Alarm Only Instrumentation Surveillance Requirements & Adding or Changing Action Statement for Selected TSs ML20135E6551996-12-0202 December 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising Section 3.4.2 SRV Configuration to Include Only 13 of Current 18 SRVs ML20129J4461996-10-31031 October 1996 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Seismic Monitoring Instrumentation Requirements ML20117P6571996-09-20020 September 1996 Amends 115 & 100 to Licenses NPF-11 & NPF-18,respectively, Revising TSs in Response to 960409 Application ML20116A9501996-07-15015 July 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising App A,Ts,Per 10CFR50.90 to Relocate Fire Protection Requirements of Listed TS Sections ML20113C8581996-06-21021 June 1996 Application for Amends to Licenses NPF-11 & NPF-18,including Extension of 18 Month Surveillance Interval & One Time Change to TS to Extend AOT for Each Subsystem of CR & Auxiliary Electric Equipment Room Emergency Filtration Sys ML20107F0541996-04-16016 April 1996 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Selected Response Time Testing Requirements ML20101R1941996-04-0909 April 1996 Application for Amends to Licenses NPF-11 & NPF-18,providing Justification for Deleting Scram & Isolations on MSL High Radiation & Inoperable Trips as Well as Raising MSLRM Sys Alarm Setpoints Above New HWC Background ML20107A8351996-04-0808 April 1996 Application for Amends to Licenses NPF-11 & NPF-18, Reflecting Transition of Fuel Supplier from GE to Siemens Power Corp.Nonproprietary & Proprietary Versions of EMF-94-217,Rev 1 Repts Encl.Proprietary Rept Withheld 1999-08-06
[Table view] |
Text
i Commonwealth Illimn Comp.iny l
14Q Opus l'lxe i
lbw ners Gn n e,11. N)515
' May 19,1995 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
SUBJECT:
LaSalle County Nuclear Power Station Units 1 and 2 Application for Amendment to Facility Operating Licenses NPF-11 and NPF-18, Appendix A, Technical Specifications NRC Docket Nos. 50-373 and 50-374 Pursuant to 10 CFR 50.90, Comed proposes to amend Appendix A, Technical Specifications of Facility Operating Licenses NPF-11 and NPF-18. The proposed change revises LaSalle Unit 1 and LaSalle Unit 2 Technical Specification Surveillance Requirement 4.7.5.1.1, Fire Suppression Water System. The proposed change involves the revision of the technical specification requirement that verifies each fire protection valve is in the correct position at least once per 31 days. The proposed change will only require a monthly visual inspection of the fire protection valves that are accessible during plant operation. The valves that are not accessible during plant operation will be visually inspected at least once per 18 months.
The proposed amendment request is subdivided as follows:
1.
Attachment A gives a description and safety analysis of the proposed char.ges.
?
2.
Attachment B includes the proposed changes to the Technical Specification pages for LaSalle Units 1 and 2.
3.
Attachment C describes Comed's evaluation performed in accordance with 10 CFR 50.92 (c), which confirms that no significant hazard consideration is involved.
4.
Attachment D provides an Environmental Assessment Applicability Review.
This proposed amendment has been reviewed and approved by Comed On-Site and Off-Site Review in accordance with Comed procedures.
There are no speci'fic schedule requirements associated with this amendment proposal. Therefore, Comed requests that this amendment be approved by the NRC within about six months, i.e., NRC approval by approximately November of 1995, i
kt\\nla\\lasalle\\fpvivfin.wpf1 j
9505240298 950519 PDR ADOCK 05000373 P
PDR g
(;
USNRC May 19,1995 To the best of my knowledge and belief, the statements contained above are true and correct. In some respect these statements are not based on my personal knowledge, but obtained information furnished by other Commonwealth Edison employees, contractor employees, and consultants. Such information has been reviewed in accordance with company practice, and I believe it to be reliable.
Commonwealth Edison is notifying the State ofIllinois of this application for amendment by transmitting a copy of this letter and its attachments to the designated state official.
Please direct any questions you may have concerning this submittal to this office.
Very truly yours, g! OFRCIAL SEALuy, :,==er exe===ug!:
hl MARY JO YACK
- l NOT ARY PU8 TIC, ST A1( Of ittINOIS l
[
i vl ::::=::::::::- ::::==:=:Jl y
MY COMMISSeoN (xmRIS 11/29/97 <
Gary G. Benes
)
Nuclear Licensing Administrator Subscribed and Sworn to before me on this 4M day of
~7)Mu
.1995.
/
j Y) h is 09 Y1 Notdry pulhic ()
Attachments:
A.
Description and Safety Analysis of the Proposed Changes B.
Marked-Up pages to the Technical Specifications for LaSalle Unit 1 and LaSalle Unit 2 C.
Evaluation of Significant Hazards Considerations D.
Environmental Assessment Applicability Review cc:
J. B. Martin, Regional Administrator - RIII P. G. Brochman, Senior Resident Inspector - LSCS W. D. Reckley, Project Manager - NRR Office of Nuclear Facility Safety - IDNS ki\\nla\\lasalle\\fpvivtin.wpf2
l I
ATTACHMENT A DESCRIPTION OF SAFETY ANALYSIS OF THE PROPOSED CHANGES Description of the Proposed Change This proposed change involves the revision of the technical specification requirement that verifies each fire protection valve is in the correct position at least once per 31 days. The proposed change will only require a monthly visual inspection of the fire protection valves that are accessible during plant operation. The valves that are not accessible during plant operation will be visually inspected at least once per 18 months.
Description of the Current Operating License / Technical Specification Requirement The current requirements of Technical Specification Surveillance Requirement 4.7.5.1.1, Fire Suppression Water System, requires the following:
"4.7.5.1.1 The fire suppression water system shall be demonstrated OPERABLE:
At least once per 31 days by verifying that each valve (manual, power a.
operated, or automatic) in the flow path is in its correct position.
Bases for the Current Requirement The LaSalle Technical Specification Bases includes the following:
The OPERABILITY of the fire suppression systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring in any portion of the facility where safety related equipment is located. The fire suppression system consists of the water system, deluge and/or sprinklers, CO2 systems, and fire hose stations. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety related equipment and is a major element in the facility fire protection program.
The surveillance requirements provide assurance that the minimum OPERABILITY requirements of the fire suppression systems are met.
Description of the Need for Amending the Technical Specification During plant operations there are, and will be, areas within the plant that should be considered inaccessible due to conditions that make personnel access undesirable dite to personnel health concerns. In regards to the fire suppression water system, there are currently seven valves located within the LaSalle Unit 2 heater bay that should ks\\nla\\lasalle\\fpvivfin.wpf3
1 ATTACHMENT A DESCRIPTION OF SAFETY ANALYSIS OF THE PROPOSED CHANGES be considered inaccessible. The seven valves in the Unit 2 heater bay are located near areas that have 100 to 400 mrem /hr fields when the unit is at full power.
Performing the surveillance for these seven valves has resulted in a total dose of approximately 50 mrem each month. Performance of the surveillance for the valves located in the Unit 2 heater bay is undesirable since it creates personnel hazards from an ALARA standpoint. Recently, the seven valves that are locked open in the heater bay were tagged with Out-Of-Services (OOS). Performance of the surveillance is now completed by verifying that the valves are listed on the OOS and that the OOS is still valid. Currently, heater bay entries are not performed to complete the surveillance. However, the practice of allowing OOS to remain open indefinitely is undesirable, and appcoval of this amendment would eliminate this OOS.
Therefore, Comed requests a Technical Specification amendment to only require a monthly visual inspection of the fire protection valves that are accessible during plant operation. The valves that are not accessible during plant operation will be visually inspected at least once per 18 months. This amendment is requested for both units with the intent that if any additional fire protection valves are determined to be inaccessible in the future due to conditions that make personnel access undesirable due to personnel health concerns, those valves would also only require a visual inspection at least once per 18 months.
Description of the Amended Technical Soccification Reauirement Comed proposes that the Technical Specification be amended to require a monthly visualinspection of the fire protection valves that are accessible during plant operation as follows*
4.7.5.1.1 The fire suppression water system shall be demonstrated OPERABLE:
a.
At least once per 31 days by verifying that each valve (manual, power operated, or automatic)in the flow path accessible during plant operation is in its correct position.
In addition, a Requirement e. to perform the surveillance when the fire protection valves are accessible is proposed as follows:
e.
At least once per 18 months by verifying that each valve (manual, power operated, or automatic)in the flow path not accessible during plant operation is in its correct position.
ki\\nla\\lasalle\\fpvivfin.wpf4
ATTACHMENT A DESCRIPTION OF SAFETY ANALYSIS OF THE PROPOSED CHANGES The verification requirement of the inaccessible valves will be satisfied by a surveillance that is performed once per 18 months when the Unit is shutdown.
Bases for the Amended Technical Specification Request The proposed change to allow the fire protection valves that are inaccessible during power operation to only be surveilled once per 18 months will not affect the capability of the fire suppression water system.
A check of the LaSalle LER database for the entire operating lifetime of LaSalle Units 1 and 2 was performed, and there has not been any instances in which any Technical Specification related fire protection valves have been found out of position.
Several instances where valves have been found unlocked have occurred, but the valves were found in the correct position. Also, in 1989 it was discovered that four fire protection valves were found to have exceeded the monthly surveillance frequency requirements (LER #89-015-00) due to procedure deficiencies that allowed these valves to be excused from surveillance during instances of high radiation levels.
Surveillances were then performed and the valves were found to be in their normally locked open positions. This 100% record of properly positioned valves is strong evidence that valve tampering is not a problem.
The seven valves that are currently inaccessible during power operation are all locked in the open position (all fire protection valves that are in the fire suppression water flow path are either locked or seal wired in the required position). As described, the areas these valves are in are relatively inaccessible at power, so access to these areas is very limited. Based on these facts, combined with the 100% plant lifetime record of properly positioned Technical Specification related fire protection valves, it can be concluded that the fire protection valves that are inaccessible during power operation can be visually inspected only once per 18 months with virtually no risk to the operability of the fire protection water systems.
To ensure these conditions remain valid, any Technical Specification fire protection valves that may be determined to be inaccessible in the future by the On-site Review and Investigative Function will be verified locked in the appropriate position within 31 days prior to establishing the change in surveillance frequency.
1 This change will make Technical Specification 3.7.5.1, Fire Suppression Water System, consistent with Technical Specification 3.7.5.4, Fire Hose Stations, in regards j
to only requiring a monthly visual inspection of the equipment that is accessible during plant operations, with the equipment that is not accessible during plant operation to be visually inspected at least once per 18 months.
ki\\nla\\lasalle\\fpvivtin.wpf5
\\
i ATTACHMENT A DESCRIPTION OF SAFETY ANALYSIS OF THE PROPOSED CHANGES Schedule There are no specific schedule requirements associated with this amendment proposal. Therefore, Comed requests that this amendment be approved by the NRC within about six months, i.e., NRC approval by approximately November of 1995, with 30 days required for implementation of the approved amendments.
k \\nla\\lasalle\\fpvivfin.wpf6