Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20085C433 + (08:49:05, 14 December 2024)
- ML20085C425 + (08:49:05, 14 December 2024)
- ML20085C408 + (08:49:10, 14 December 2024)
- ML20085C391 + (08:49:13, 14 December 2024)
- 05000325/LER-1995-010, :on 950511,loss of RPS Bus a Power & ESF Actuations Occurred Due to Defective Procedures.Operating Procedures Revised to Provide Addl Info for Transferring DG Governor + (08:49:15, 14 December 2024)
- ML20085C385 + (08:49:17, 14 December 2024)
- ML20085C379 + (08:49:18, 14 December 2024)
- ML20085C377 + (08:49:18, 14 December 2024)
- ML20085C369 + (08:49:19, 14 December 2024)
- ML20085C343 + (08:49:20, 14 December 2024)
- ML20085C330 + (08:49:20, 14 December 2024)
- JAFP-91-0545, Forwards Amended Page to Ja Fitzpatrick Nuclear Power Plant Effluent & Waste Disposal Semiannual Rept,Jan-June 1991, Reflecting Change in Total Curies Shipped Offsite for Disposal or Burial + (08:49:21, 14 December 2024)
- ML20085C320 + (08:49:21, 14 December 2024)
- 05000219/LER-1991-004-01, :on 910803,trouble Alarm Received for Fire Zone on 51-ft Elevation of Reactor Bldg & Hourly Instead of Continuous Fire Watch Set.Caused by Personnel Error & Inadequate Guidance.Guidance Established + (08:49:23, 14 December 2024)
- 05000369/LER-1991-010-01, :on 910719,discovered That Control Rod Deviation Monitor Inoperable Since 831207.On 910713,control Rod Groups 1 & 2 Misaligned by Greater than 12 Steps.Caused by Defective Procedure & Mgt Deficiency + (08:49:25, 14 December 2024)
- NRC-91-0084, Summarizes Work Activities Completed to Resolve RHR Sys Small Bore Piping Connection Vibration Issue.Strain Gauges Installed on Most Highly Stressed Instrumentation Connection & Div II Vent Modified + (08:49:26, 14 December 2024)
- ML20085C305 + (08:49:30, 14 December 2024)
- ML20085C303 + (08:49:30, 14 December 2024)
- ML20085C294 + (08:49:31, 14 December 2024)
- ML20085C298 + (08:49:31, 14 December 2024)
- ML20085C289 + (08:49:32, 14 December 2024)
- ML20085C282 + (08:49:35, 14 December 2024)
- ML20085C271 + (08:49:36, 14 December 2024)
- ML20085C276 + (08:49:36, 14 December 2024)
- ML20085C261 + (08:49:39, 14 December 2024)
- 05000482/LER-1990-027, :on 910730,discovered That STS ML-001 Had Not Been Performed within Required Time Frame During Refueling Iv.Caused by Lack of Administrative Controls.Data Base Review Conducted + (08:49:40, 14 December 2024)
- ML20085C235 + (08:49:41, 14 December 2024)
- ML20085C223 + (08:49:42, 14 December 2024)
- ML20085C221 + (08:49:43, 14 December 2024)
- ML20085C218 + (08:49:43, 14 December 2024)
- 05000277/LER-1991-026, :on 910727,actuations Occurred on Primary Containment Isolation Sys When 4 Kv Emergency Bus Transferred to Startup Feed.Caused by Phase B Arcing. Isolations Reset & Disconnect Repaired + (08:49:48, 14 December 2024)
- 05000277/LER-1991-025, :on 910728,isolation of HPCI Sys Occurred During Performance of Surveillance Test,Resulting in ESF Actuation.Caused by Failure to Follow Procedures & Procedural Weaknesses.Procedures Revised + (08:49:50, 14 December 2024)
- ML20085C208 + (08:49:51, 14 December 2024)
- ML20085C204 + (08:49:52, 14 December 2024)
- ML20085C206 + (08:49:52, 14 December 2024)
- ML20085C199 + (08:49:53, 14 December 2024)
- ML20085C198 + (08:49:53, 14 December 2024)
- ML20085C187 + (08:49:54, 14 December 2024)
- L-91-231, Forwards Rev 12 to Training & Qualification Plan, Consisting of Summary of Changes & Marked Up Copy of Revised Pages & Direction for Incorporating Rev Into Plan + (08:49:55, 14 December 2024)
- ML20085C180 + (08:49:55, 14 December 2024)
- ML20085C172 + (08:49:56, 14 December 2024)
- 05000336/LER-1991-006, :on 910330,Surveillance Requirement Section 4.0.5 Re Inservice Insp of ASME Code Class 1,2 & 3 Components Not Performed within 92 Day Interval.Caused by Inadequate Planning.Schedule Enhanced + (08:49:58, 14 December 2024)
- ML20085C166 + (08:49:59, 14 December 2024)
- 05000266/LER-1991-009, :on 910727,runback of Unit 1 Turbine Generator Discovered Initiated.Cause Unknown.Flux Maps Monitored for Quadrant Power Tilt & Core Flux Mapping Initiated + (08:50:01, 14 December 2024)
- 05000413/LER-1991-010, :on 910526,feedwater Isolation Occurred.Cause for Event Unknown.Facility Will Evaluate Need to Replace Westinghouse W-2 Cell Switch Which Had Sensitivity Problems in Past + (08:50:03, 14 December 2024)
- 05000265/LER-1991-008-04, :on 910723,outboard Recirculation Sample Valve AO-2-220-45 Closed W/No Apparent Signal.Caused by Defective Connections in Control Circuitry.Corrective Actions Included Fuse Verfication & Insp of All Terminations + (08:50:05, 14 December 2024)
- 05000325/LER-1991-019, :on 910723,maint Surveillance Test Procedures Found to Be Revised Incorrectly.Caused by Lack of Formal Process for Ensuring That Procedure Was Electronically Altered Via Word Processing.Procedure Revised + (08:50:07, 14 December 2024)
- 05000259/LER-1991-008-02, :on 910724,fire Wrap Discovered Removed During Unit 3 Integrated Walkdown Activities W/O Establishing Fire Watch.Caused by Mgt Failure.Duties,Responsibilities & Accountabilities for Field Svcs Developed + (08:50:09, 14 December 2024)
- ML20085C152 + (08:50:10, 14 December 2024)
- ML20085C148 + (08:50:11, 14 December 2024)
- ML20085C144 + (08:50:12, 14 December 2024)