_=.
gm o
(
()
~ du irm n
MPublic Setvice' M a..
P.O. Box 840 U
March 26,-1991.
Denver co 8020b OB40 Fort St. Vrain -
Unit No.J1-A Clegg Crawford e
O' P-91104 ve. Pres > dent Nucisar opersteons Director, Division of industrial and Medical Nuclear Safety Office of Nuclear. Material Safety and Safeouards U. S. Nuclear Regulatory Commission =
Washington _, D. C. 20555 ATTN: - Mr. Steve Ru' fin Project Manager
-Irradicted Fuel Section Fuel Cycle Safety Franch Docket No.72-009
SUBJECT:
For_t_St. Yrain Independent Spent Fuel Storage Installation; Pequest For Additional Information
REFERENCE:
'1) NRC letter, Roberts to Crawford, dated February 7, 1991 (G-91021)
- 2) PSC Letter, Crawford to Roberts, dated June ~22,'1990 (P 901D )
3)_ PSC Letter, Crawford tn Roberts, dated June 22, 1990 (P-90187)-
Dear Mr. Ruffin:
In Reference. I the Nuclear Regulatory Commission (NRC)-provided Public Service Company of Colorado (PSC) with questions and comments regarding the Fort St. 'Vrain (FSV) Independent Spent Fuel Starace Installation (ISFSI) Safety Analysis Repor_t (SAR) submittais (References 2 -and 3).
_-This-letter provides the responses to the maiority of these questions-and comments including required support documentation.
The balance of the PSC responses will be provided in
- a. follow-up submittal.
Some of the information that is supplied as support documentatinn is considered by Foster Wheeler Energy Cnrporation, Energy Applicatians Division (FW) to be proprietary under the criteria set forth in 10 CFR'2.790.
'/P)
/
I"i( i.;.10 b1k k.
{
P-91104
'Page 2 c.
March 26, 1991 In accordance _with the requirenents of 10 CFR 2.790, the following documents are submitted with this letter:
(1) One copy of an Application for Withholding Proprietary Information from Public Disclosure, Attachment A.
(2) One copy of the Proprieta ry Information
- Notice, Attachment B.
(3) One copy of an original FW affidavit, Attachment C.
(4) A list of all support documentatier with the FW proprietary information annotated, Attachment D.
Attachment E to this letter is the actual PSC responses to the NRC questions and comments regarding the ISFSI SAR.
PSC met with the NRC and its contract reviewers en March 13 and 14, 1991 to discuss the formulated responses.
The PSC responses contained in Attachment E
are the result of discussions and resolutions agreed to at that time.
If you have any questions or need additional information please contact Mr. M. H. Holmes at (303) aP.0-6960.
Very truly yours, f-A. Clegg Crawfo'rd Vice President Nuclear Operations ACC: PPD: bit Attachments Enclosure cc:
Regional Adninistrator, Region IV Mr. J. B. Baird Senior F,esident Inspector Fort St. Vra n John Stokley Science Applications International Corporation 1709 Goodridge Drive 5th Floor McLean, VA 22102
-P-91104 Page 3 March 26,-1991-Mr. Robert Quillir."
Radiation Control Divisior Colorado Departnent of _ Health 4210 East lith Avenue
-Denver, CO 80220 l
O UNITED STATES OF AMERICA NUCLFAR REGULATORY-COMMISSION In the Matter
)
Public Service Company of Colorado Docket No.72-009 Fort St. Vrain
)
Independent Spent Fuel Storege Installation AFFIDAVIT A.
Clegg Crawford being first duly sworn, deposes and says: That he is Vice President, Nuclear Operations, cf Public Service Company of Colorado, the Licensee herain, that he has read the infomation presented in the attached letter and knows the contents thereof, and that the statements and natters set forth therein are true and correct to the best of his knowledge, infomation and belief.
6Y' f
A. Clegcf Crawford "
Vice President Nuclear Operations STATE OF Ob'/f U dl,
)
)
COUNTY OF hl.LilVULI
)
Subscribe and sworn to before me, a Notary Public on this 2(o day of M'thth
, 1991.
LO CLi, 60h C b NotaryJPsblic 0
My comnd ssion expires bio;k ll
, 19 6 y
5.
l AstachmentA
-A
- P-91104-March 26. 1991 f
APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FPOM PUBLIC DISCLO5URE RE:
Fort St. Vrain Independent Spent. Fuel Storage Instal *iation Safety Analysis Report - Proprietary-Information This'. application _for withholding is submitted by Public Service Company of _ Colorado on behalf of Foster Wheeler Energy Corporation.
Energy Applications Division (FW). persuant to the provisions of 10 CFR-2.790(b)(1). The referenced material contains information which is commercially important to FW and that has been held in confidence by FW._
In accordar.ce with 10 CFR 2.790(b)(1), FW has provided an affidavit which sets forth the basis on which the information cay be withheld
-fron public disclosure 'by the Nerlear Regulatory Commission. This
- affidavit, enclosed as At+;chment
- specifically addresses the
- considerations listed in Ir-CFR 2.790(s)(4).
I+
is requested that the information which is prop'ietary to FW be withheld from public disclosure in accordance with 10 CFR 2.790.
e
-w
Attachment B
- J
- P-91104.
March 76, 1991 PROPRIETARY INFORMATION NOTICE Transmitted herewith are proprietary versions of documents furnished to_the Nuclear Regulatory Commission in connection with a request for issuance of a license to Public Service Company of Colorado to construct and operate an Independent Spent Fuel Storage Installation
-l at the Fort St. Vrain Nuclear Generating Station site.
-The justification for claining the information designated as proprietary is contained in the Foster Wheeler Energy Corporation, Energy Application Division affidavit enclosed as Attachment C.
4
- t Attachment C P-91104
' March 26, 1991 t-FW Oriainal Affidavj O
t V
v
+
57 5' d -7 March 21, 1991 AFFIDAVIT STATE OF NEW JERSEY SS COUNTY OF ESSEX Before me, the undersigned authority, Bubanesh K. Agarwal, personally appeared, known to me to be the General Manager of Energy Applications Division of Foster Wheeler Energy Corporation, and under oath stated that he was authorized to make this affidavit on behalf of the corporation and that the averments of fact set forth in this affidavit are true and correct to the best of his knowledge, information and
- belief, m
- m 7 ---
Bubanesh K. Aga al
/ Notary Public
(-
5:07.~ -
h!y Cc rnt., r,,, m
~-
{-
v_
- 7 5798-7 page 1 of 3 (1)
-I, Bubanesh K. Agarwal, depose and say that I am the General Manager of Energy Applications Division of Foster Wheeler Energy Corporation, duly authorized to make this affidavit and have: reviewed or caused to have' reviewed the proprietary information sought to be withheld from public disclosure in connection with the approval ofthe Fort St. Vrain Modular. Vault Dry Store System.
(2)
The proprietary'information sought to be withheld in this submittal is as follows:-
362A0033
-362A0258 362Pb430 362A0039 362A0259 362P0131
-362A0052 362A0260 362P0200 362A0053 362A0261 362P0252 362A0060 362A0262 362P0253 362A0061 362A0263 A4~2.3.4 Calc. 1 362A0064 362A0264-A4-2.3.4 Calc. 2 362A0067 362A0265-ANSWERS /MCBEND(90)2 362A0068-
-362AO.266-ANSWERS /RANKERN(90) 01, Sec 1, - 2 & 3 362AOO73 362A0267 ANSWERS / (MCBEND) 12
-362A0074 362A0268
- ANSWERS / (MCBEND) 2 362A0078 362A0269' ANSWERS /(MINNIE)2 362A0085-
~362A0292 ANSWERS /(RANKERN)2 362A0086-362A0293 ANSWERS /(RANKERN)4 362A0087-362A0296 ANSWERS / (RANK) 13 362A0088_-
362A0297'
-ANSYS SEISMIC REPORT-(Incl. SAS 362A0089 362A0090 ~
362A0298
& DCS) 362A0300 Bristol U Report 362A0091-362A0307-ES L/R(90) 34 -
362A0092 362A0308 ESL/TM(90) 10 1362A0093 362A0309 ESL/TM(90)17 362A0094
,362A0310
- ES L/TM ( 90) 58.
362A0095 362A0311
'ESL/TM(90)59 362A0100 L362A0312 ESL/TM(90) 87 Leak Test 362A0113 362A0313 ESL/TM(91)13 362A0114 362A0314 ESL/TM(91)27 362A0115 362A0315 GA-90/R1701-110 i362A0116 362A0316 GA 90/R1801-110 362A0117 362A0348 GA 90/R1801-120 362A0118 363A0004 GA 90/R1801-210 362A0119-362F0001 GA-A10827-(MICROX) 362A0120_
362F0008
~JH2879/941/HT/203 (1-12)
L362A0121 362F0027 JH2879/941/SH/600(VOL I,
- 3)-
~
362A0122 1362F0058' JH2879/941/SH/600(VOL II, #1) 362A0123 J362F0096 JH2879/941/SH/600(VOL II, #2) 362A0124-362F0129 NRPB-M156
_362A0125~
362F0192 NRPB-M158 (Incl. Refe. 4 and 8) y 4- -, -~. -
s r
- m
a page 2 of 3 362A0126 362F0193 SAR Fig. 1.1-3 362A0127 362F0215 SAR Fig. 2.1-1 362A0128 362F0341 SAR Fig.
2.5 362A0129 362F0346 SAR Fig. 4.2-3 362A0130 362F0357 SAR Fig. 4.2-6 362A0131
-362 LOO 69 SAR Fig. 4.2-7 362A0140 362 LOO 76 SAR Fig. 4.2-8 362A0200 362LO244 SAR Fig. 4.4-1 362A0236 362LO245 SAR Fig. 4.4-10 362A0246-362LO247 SAR Fig. 4.4-11 362AC248 362LO249 SAR Fig. 4.4-12 362A0250 362LO270 SAR Fig. 4.4-13 362A0252 362LO321 SAR Fig. 4.4-14 362A0253-362LO338 SAR Fig. 4.4-17 362A0254 36"P0060 SAR Fig. 4.4-2 362AC255 362P0066 SAR Fig. 4.4-3 362A0257 362P0095 SAR Fig. 4.4-4 SAR Fig. 4.4-5 SAR Fig. 4.4-6 SAR Fig. 4.4-7 1SAR Fig. 4.4-8 SAR Fig. 4.4-9 (3)
I have personal knowledge of the criteria and procedures utilized by Energy Applications Division of Foster Wheeler Energy Corporation in designating information as e trade secret, or as privileged / confidential information of a commercial or financial nature.
(4)
The following information is furnished pursuant to the provisions of paragraph 10CFR 2.790 Kb) (4), for conside-ration by the Commission in determin:.ng whether the infor-mation sought to be withheld-from public disclosure should be withheld.
(i)
The information sought to be withheld from public dis-closure consists of design drawings, analytical and test.results which are: owned and held in confidence by Energy Applications Division of Foster Wheeler Energv Corporation, and is not to be disclosed to any third party without first obtaining that party's written agreement to hold the information in confidence.
L I'
4 t
5798-7 pago 3 of 3
(ii) The information is of a type customarily hold in con-fidence by Energy Applications Divisior, of Foster Whooler Enorgy corporation, and is not customarily disclosed to the public and is transmitted to the commission in confidence.
(iii) The information to the boct of my knowledge and belief, 16 not available in public sources.
(iv) Public disclosure of the information is likely to cause subst.antial harm to the compotitive position of Enorgy Applications Division of Fostor Wheelor Energy Corpora-tion.
t
\\u W n @'.
s
..'Ckr....
B.K. Agarwal Dato General Manager Energy AapAicar, ions Division ter Wacolor Eonrgy corporation i
i j/
,.p............................
'[fotaryPublic r,j (,
.e
.b+
6se ee a-f 5
i i
t
'tttachmont 0 P-91104 March 26, 1991 i
SUPPORTItJG DOCUMEllTS 362A0033 362A0039,Sht. 2 362A0052 362A0053 362A0060 362A0061 i
362A0064 362A0067 i
362A0068 362A0073 352A0074 362A0078 362A0085 362A0086 362A0087
'J62A0088 362A0089 362A0090 362A0091 F
362AOO92 362A0093 362A0094 362A0095 362A0100 362A0113 362A0114 362A0115
- .362A0116 362A0117 362A0118 362A0119 362A0120 362A0121 362A0122 362A0123 362A0124 362A0125 362A0126 362A0127 362A0128 362A0129-362A0130 362A0131 362A0140 362A0200 3621.0236 Page 1 r
.,-.,_m..,-.
.-m.
o ttachment D P-91104 March 26, 1991 364A0246 362A0240 362A0250 1
362A0252 362A0253 362A0254 362A0255 362A0257 362A0250 362A0259 362A0260 362A0261 362A0262 362A0263 362A0264 362A0265 362A0266 362A0267 362A0268 362A0269 362A0292 362A0293 362A0296 362A0297 362A0298 362A0300 362A0307 362A0300 362A0309 362A0310 362A0311 362A0312 362A0313 362A0314 362A0315 362A0316 362A0348 362F0001 362F0008 362F0027 362F0058 362F0096 362F0129 362F0192
- - 362F0193 362F0215 362F0333 362F0357 Page 2.
t -
\\ttachment D P-91104 Harch-26, 1991
)
1 362 LOO 69 362L0076 362LO244 362LO245 362LO247 362LO249 362LO270 362LO321 362LO338 362P0060 362P0066 362P0095 362P0130 362P0131 362P0200 362P0252 362P0253
- -363A0004 A4-2.3.4 Calc. 1 A4-2.3.4 Calc. 8 AllSWERS/MCBEND(90)2 ANSWERS /RAllKER!i( 90) 01, Sec 1, 2 & 3 AtlSWERS/ (MCBEllD) 12 A!!SWERS/ (MCBEllD) 2
- - AllSWERS/ (MI!1NIE) 2 AliSWERS/ (RAllKERN) 2 ANSWERS / (RAllKERN) 4 AtlSWERS/ (RANK) 13 A!!SYS SEISMIC REPORT (Incl. SAs AND DCs)
Bristol U Roport
'EE-DEC-0023 (Rev A)
EE-FP-0020
- - ESL/R(90) 34 ES L/TH (90 10 ESL/TM 90 17 ESL/TM 90 58 ESL/TM 90 59 **
ESL/TM(90 87 Leak Test ESL/TM(91 13 **
ESL/TM(91)27 Fig. 7 NUREG GA 90/R1701-110 GA 90/R1801-110 GA 90/R1801-120 GA 90/R1801-210 GA-A10827 (MICROX)
JH2879/941/HT/203 (1-12)
Page 3,
. =,
p 4ttachment D P-91104 March 26, 1991
~
- . JH2879 941/SH/600iVOL II, #3 JH2879 941/SH/600 VOL II, il
- fJH2879 941/SH/600 VOL II, 62 NDR-89-1025 NRPB-M156 i
NRPB-M158 (Incl. Refs. 4 and 8) i NUREG pages,-Sht. 1-4 Organitational Chart - SAR Fig. 9.1-1 (revised)
O-ring catalogs
.PSC Dwg. 172-1.01,Sht. 1-4 i
PSC 195 drwgs.
SAR Fig. 1.1-3 SAR' Fig. 2.5-6 SAR Fig. 4.2-3
- 'SAR Fig. 4.2-6 i
SAR Fig. 4.2-7
- 1 SAR Fig. 4.2-8'
(
~
SAR Fig.. 4.4-1 SAR Fig. 4.4-10 i
SAR Fig.'_4.4-11
. *~
- - SAR. Fig. 4.4-4 L
SAR Fig.~4.4-5'
- - SAR-Fig._4.4-6 SAR Fig. 4.4-7 6
SAR Fig. 4.4
- SAR Fig. 4.4-9 Soil Test _ Report,1CTL-THOMPSON SRSS Method Replacement 1
' Table 3-2, GADR-55, Vol. II Table'3-1, GADR-55, Vol. II Tornado TableLI Tornado-Table'II TP-CFH
-Trans. Line-Drwg.
-FW Proprietary Document To be supplied Page 4
.