Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20087M850 + (19:00:02, 13 December 2024)
- ML20087M847 + (19:00:03, 13 December 2024)
- 3F0384-19, Forwards Fee for Review of Tech Spec Change Request 103,per 830414 Submittal,In Response to 840316 Request + (19:00:04, 13 December 2024)
- ML20087M842 + (19:00:04, 13 December 2024)
- RBG-17-358, Interim Deficiency Rept DR-121 Re Motor Control Ctr Equipment Supplied by Ite Gould,Inc.Investigation Incomplete.Interim or Final Rept Will Be Provided by 840424 + (19:00:05, 13 December 2024)
- B11092, Forwards Response to NRC 840116 Request for Addl Info Re 480 Series Questions on Containment Sys.Response to Request Numbers 480.11,19 & 34 Will Be Submitted by 840410.W/one Oversize Table.Aperture Card Is Available in PDR + (19:00:06, 13 December 2024)
- ST-HL-AE-1052, Confirms That Response to 840105 Notice of Violation Contained in IE Insp Repts 50-498/83-22 & 50-499/83-22 Will Be Submitted by 840221,per 840131 Telcon + (19:00:07, 13 December 2024)
- ML20087M832 + (19:00:08, 13 December 2024)
- ML20087M828 + (19:00:10, 13 December 2024)
- ST-HL-AE-1070, Final Deficiency Rept Re Seepage of Oil from Cable Supplied by Okonite Industries.Exam Revealed No Oil Seepage Occurred. Condition Not Reportable Under 10CFR50.55(e).Item Closed + (19:00:10, 13 December 2024)
- ST-HL-AE-1016, Responds to NRC Re Violations Noted in IE Insp Repts 50-498/83-17 & 50-499/83-17.Corrective Actions:Part a, Rev 4,Section 8 of QA Program Description Revised to Include Clarification of Requirements for Matls Identification + (19:00:11, 13 December 2024)
- ML20087M823 + (19:00:12, 13 December 2024)
- W3P84-0785, Notifies That Equipment qualification-related IE Notices 82-03,82-52,83-45 & 83-72 Have Been or Will Be Addressed Prior to Exceeding 5% Power + (19:00:13, 13 December 2024)
- 05000254/LER-1984-002-06, :on 840307,measured Combined Leakage Rate for All Penetrations & Valves Except MSIVs Found in Excess of Limit.Cause Unknown + (19:00:14, 13 December 2024)
- ML20087M815 + (19:00:15, 13 December 2024)
- ML20087M814 + (19:00:16, 13 December 2024)
- ML20087M813 + (19:00:17, 13 December 2024)
- ML20087M812 + (19:00:18, 13 December 2024)
- W3P84-0767, Lists Items Addressed in Licensee Qualification Training Program,Per L Bender Request + (19:00:18, 13 December 2024)
- 05000387/LER-1984-010, :on 840225,reactor Manually Scrammed When One of Six Automatic Depressurization Sys Safety Relief Valves Stuck Open & Would Not Close in 2 Minutes.Caused by Faulty Valve Solenoid.Solenoid Replaced + (19:00:20, 13 December 2024)
- ML20087M807 + (19:00:21, 13 December 2024)
- ML20087M806 + (19:00:22, 13 December 2024)
- W3P84-0744, Discusses Proposed Rev to FSAR Section 6.5.1.4 Re Leak Testing of ESF HVAC Ductwork & Housings.Testing Performed Per ANSI N509-1980 + (19:00:23, 13 December 2024)
- ML20087M802 + (19:00:24, 13 December 2024)
- ML20087M804 + (19:00:24, 13 December 2024)
- ML20087M801 + (19:00:25, 13 December 2024)
- ML20087M796 + (19:00:26, 13 December 2024)
- ML20087M797 + (19:00:26, 13 December 2024)
- ML20087M793 + (19:00:30, 13 December 2024)
- ML20087M792 + (19:00:31, 13 December 2024)
- ML20087M791 + (19:00:32, 13 December 2024)
- ML20087M789 + (19:00:33, 13 December 2024)
- ML20087M786 + (19:00:33, 13 December 2024)
- ML20087M785 + (19:00:34, 13 December 2024)
- ML20087M777 + (19:00:35, 13 December 2024)
- ML20087M771 + (19:00:36, 13 December 2024)
- ML20087M765 + (19:00:37, 13 December 2024)
- ML20087M764 + (19:00:37, 13 December 2024)
- ML20087M762 + (19:00:38, 13 December 2024)
- ML20087M759 + (19:00:39, 13 December 2024)
- ML20087M756 + (19:00:40, 13 December 2024)
- ML20087M755 + (19:00:40, 13 December 2024)
- ML20087M754 + (19:00:41, 13 December 2024)
- ML20087M748 + (19:00:42, 13 December 2024)
- ML20087M746 + (19:00:43, 13 December 2024)
- ML20087M745 + (19:00:43, 13 December 2024)
- ML20087M743 + (19:00:44, 13 December 2024)
- Press Release-20-019, NRC Makes Oklo Advanced Reactor Application Publicly Available + (19:00:45, 13 December 2024)
- 05000328/LER-1984-003-05, :on 840227,vital Inverter Failed.Caused by Blown Fuse Due to Incorrect Connection Which Caused Containment Ventilation Isolation.Containment Ventilation Isolation Reset & Inverter Returned to Svc + (19:00:47, 13 December 2024)
- ML20087M719 + (19:00:48, 13 December 2024)
- ML20087M715 + (19:00:49, 13 December 2024)
- ML20087M713 + (19:00:50, 13 December 2024)