Text
r 5
?
Washington Public Power Supply System Box 1223 Elma, Washington 98541 (206)482-4428 m
- 3
'i March 16, 1984 1.3 L
.5 G03-84-161 g
R@
"E m
m O
5b Mr. J. Martin Regional Administrator U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 260 Walnut Creek, California 94596
Subject:
NUCLEAR PROJECTS 3 AND 5 DOCKET NOS. 50-508 AND 50-509 RESPONSE TO:
1)
IE BULLETIN NO. 83-07, "APPARENTLY FRAUDULENT PRODUCTS SOLD BY RAY MILLER, INC."
2)
IE BULLETIN NO. 83-07, SUPPLEMENT NO. 1, SAME SUBJECT
- 3) IE BULLETIN NO. 83-07, SUPPLEMENT NO. 2, SAME SUBJECT The subject IE Bulletin and Supplements requested licensees of facili-ties with construction permits or operating licenses to provide a written response within eight (8) months of the date of the subject Bulletin.
~
The Supply System has conducted a thorough search of its own purchases and requested all suppliers and contractors to review their subcon-tractors' procurement documents and respond in writing to the Supply System.
The investigation revealed one supplier (HPD, Inc.) who furnished f
material purchased from Ray Miller, Inc. The material is installed
't in the {norganic Chemical Waste Separators, non safety-related equip-ment. Subsequent engineering evaluau on nas concluded that effects of utilizing the potentially fraudulent material is inconsequential, k
with respect to the design / operational characteristics of the equip-ment, and therefore requires no further evaluation / action.
As requested by the subject Bulletin, time expended during research, evaluation and preparing a written response has amounted to approx-
)
imately 300 manhours of Supply System effort. We did not request that bh0[o!$oMg b
PDR I
6
r-s Mr. J. Martin Page Two March 16, 1984 G03-84-161 suppliers keep track of time spent in performing their reviews. How-ever, based on the number of WNP-3 suppliers involved (58), we esti-mate that response to the Bulletin required several hundred manhours of suppliers' time.
A. D. Kohler Program Director, WNP-3 JAV:pd cc:
U. S. Nuclea Regulatory Commission Document Lc:strol Desk, Washington, D.C.
Mr. J. A. Adams, NESCO Mr. D. Smithpeter, BPA Ebasco, Elma Mr. M. K. Yates, Ebasco, New York Director, NRC Office of I&E, Washington, D.C.
Mr. N. S. Reynolds, BLCP8R l
r 9
A. D. KOHLER, Being first duly sworn, deposes and says: That he is the Program Director, WNP-3, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that he is authorized to submit the foregoing on behalf of said applicant; that he has read the foregoing and knows the contents thereof; and believes the same to be true to the best of his knowledge.
/[frM
/[
, 1984.
DATED WDY[
A. D. Kohler STATE OF WASHINGTON
)
)ss COUNTY OF GRAYS HARBOR)
On this day personally appeared before me, A. D. KOHLER to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the use and purposes therein mentioned.