INDIANA & MICHIGAN ELECTRIC COMPANY P.O. BOX 16631 COLUMBUS, OHIO 43216 March 2, 1984 AEP:NRC 0877 Donald C. Cook Nuclear Plant Unit Nos. 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 NRC Inspection Report Nos. 50-315/83-21(DPRP) ;
50-316/83-22 (DPRP)
Mr. James G. Keppler U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
Dear Mr. Keppler:
This letter is in response to Mr. W. D. Shafer's letter dated February 3, 1984, which forwarded the subject Inspection Report of the routine safety inspection conducted by your staff at the Donald C. Cook Nuclear Plant during the period December 11, 1983 to January 20, 1984. The Notice of Violation attached to Mr. Shafer's letter identified one item of noncompliance. Our response to this item is presented below:
' Item of Noncompliance (Units 1 and 2)
Units 1 and 2 Technical Specification 3.7.9.4.a allows 14 days to return an inoperable Halon System to operable status or, submit a special report to the Commission within 30 days outlin ag the actions taken, the cause of the inoperability and the p2 ans and schedule for returning the system to operable status.
Contrary to the above, when the Halon System was declared inoper-able on April 5,1983 (Unit 1) and April 14, 1983 (Unit 2) and not returned to service within 14 days a special report providing the requested information was not submitted.
This is a Severity Level V violation (Supplement 1).
RESPONSE TO ITEM OF NONCOMPLIANCE 1.
CORRECTIVE ACTIONS TAKEN AND RESULTS ACHIEVED The following constitutes the Special Report, pursuant to Technical Specification 6.9.2.
The halon systems were declared inoperable because they were unable to meet design concentration of 5% halon after 10 minutes. The fire detection system and the backup CO fire suppression system were then verified to be operable.2 To date, repairs and 8404020013 040326
~
PDR ADOCK 05000315 M
5 IW W
PDR.
a,
q
m.
3;-
j'. { L 3'
i, s nMr. Jame3 G..Kepplcr:
' AEP:NRC:0877
, p s
s.n
'.4 r
1 subsequent concentration tests have failed to demonstrate the
. ability to meet the design. concentration. The piping and
/
inozzles have been checked to. ensure they'are.not blocked.-
~
Y'
- 9 Additional testing has been conducted with an increased
~3
~
- quantity'of halon (6 % vs 54) discharged linto' the vault. The
- system;still failed to' maintain the design concentration..
American Electric. Power, Service Corporation is_ currently.1
- studying the problem.in conjunction with a consultant.- The r
consultant,Ja halon' system supplier, has' made recommendations
- in'.the form of a proposal which is curresitly under evaluation.
A second consultant will be at.the site in March, 1984 to F
review the_ conditions;and to.try to. develop a possible solution to'the problem.j. h ese' activities will'be discussed with American Nuclear Insurers (our fire hazards insurance Lagency) and a course of. action will'be,sttablished.
o Y
?2._
' CORRECTIVE 7 ACTIONS TAKEN 'IO AVOID FURTHER NONCOMPLIANCE '
j sThe'cause.for not, submitting the Special-Report within 30
. days,1was a lack of interface control between AEPSC and the w,'
I lantf forrsituations when Technical Specification reporting P
responsibilities are transferred'from the Plant to AEPSC. We
'are presently establishing an* interface procedure-between AEPSC and the Plant. This procedure will require the Plant to formally request,ivia the Nuclear Engineering Division, all
~
transfers'of responsibilities related to Technical.
is,
Specification; reporting requirements. The Nuclear Engineering Division will: then have the responsibility of assuring the P
1 reporting requirements.are. fulfilled on a timely basis.
E.
t-3."
DATE WHEN -FULL COMPLIANCE WILL BE ACHIEVED Full compliance with Technica1' Specifications 3.7.9.4.a 4
~
' andi6.9.2 has' been achieved.: - However,. establishment of the
- interface procedure is yet to.be completed.- The procedure is scheduled for coupletion at the-end of May,1984.
c This document was prepared following Corporate procedures
'Jwhich incorporate a! reasonable set of controls to insure'its
- accuracy and completeness prior.to signature by the undersigned.
n-t,
'Veryltrulyyours, a
m
,, 17;
- p_
M.?P..Alexich
^
Vice President.
y m
1MPA/cm-x lcc IJohn E.:Dolan 3-_i
? _ :W. G.? Smith, Jr. - Bridgman LR.(C.(Callen-
.q :
. -G.'Charnoff E.cR.;Swanson,tNRC Resident Inspector - Bridgman
~~
4
'J
_-fll 9
l w',
- f'
~
' gh 1 '
s
- r g___.-