Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 3F0192-02, Forwards Schedule Milestones for Security Sys Upgrade Program,Per 911126-27 Meetings W/Nrc,Providing Breakdown of Security Sys Upgrade Project Activities + (16:53:52, 13 December 2024)
- GO2-91-237, Forwards Rev 10 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR2.790(d)) + (16:53:52, 13 December 2024)
- GO2-92-019, Forwards Rev 10 to Guard Training & Qualification Plan. Contents of Package Apparently Damaged During Shipment to Dcd,Containing Rev,Reviewed & Found Intact.Rev Withheld + (16:53:53, 13 December 2024)
- HL-5019, Responds to Request for Addl Info Re Core Shroud Mod Scheduled for Installation During Fall 1995 Unit 2 Refueling Outage.Also,Forwards Proprietary Stress Corrosion Cracking Evaluation of XM-19 in BWR Environment. Encl Withheld + (16:53:55, 13 December 2024)
- ML20091N460 + (16:53:57, 13 December 2024)
- ML20091N466 + (16:53:57, 13 December 2024)
- ML20091N458 + (16:53:58, 13 December 2024)
- ML20091N456 + (16:53:59, 13 December 2024)
- ML20091N452 + (16:53:59, 13 December 2024)
- ML20091N446 + (16:54:00, 13 December 2024)
- 05000423/LER-1991-031, :on 911221,TS Surveillance on Ventilation Vent Radiation Monitor Missed & Grab Sample Not Performed for Approx 12 H.Caused by Administrative Oversight.Sample Obtained + (16:54:02, 13 December 2024)
- ML20091N440 + (16:54:04, 13 December 2024)
- ML20091N439 + (16:54:05, 13 December 2024)
- ML20091N431 + (16:54:06, 13 December 2024)
- ML20091N429 + (16:54:07, 13 December 2024)
- 3F0192-09, Corrected TS 3/4 7-26 Re Surveillance Requirements for Hydraulic Snubbers + (16:54:08, 13 December 2024)
- ML20091N417 + (16:54:11, 13 December 2024)
- ML20091N407 + (16:54:12, 13 December 2024)
- ML20091N403 + (16:54:13, 13 December 2024)
- ML20091N400 + (16:54:14, 13 December 2024)
- ML20091N397 + (16:54:15, 13 December 2024)
- ML20091N381 + (16:54:18, 13 December 2024)
- ML20091N376 + (16:54:18, 13 December 2024)
- ML20091N370 + (16:54:21, 13 December 2024)
- ML20091N359 + (16:54:21, 13 December 2024)
- 05000423/LER-1991-030, :on 911219,engineering Evaluation Concluded Failure of Three Normally Energized Auxiliary Relays for MOV Was Caused by Insulation Breakdown.Caused by Accelerated Thermal aging.Non-SR J10s Evaluated & Replaced + (16:54:23, 13 December 2024)
- 05000397/LER-1984-041, :on 840509 & 19,surveillance Performed on Standby Diesel Generators 2 & 1 W/O Prelube/Warmup, Respectively.Tech Specs Will Be Changed to Allow Starting of Diesel Generator W/O Prelube/Warmup + (16:54:26, 13 December 2024)
- W3P84-1560, Submits Addl Info to 840326 & 0517 Requests for Relief from Certain Technical Requirements of App R to 10CFR50 Re Fire Damper Installation,Air Handler Units AH-13 & Control Room Smoke Detection + (16:54:27, 13 December 2024)
- ML20091N344 + (16:54:28, 13 December 2024)
- ML20091N340 + (16:54:30, 13 December 2024)
- ML20091N338 + (16:54:34, 13 December 2024)
- 05000368/LER-1979-025-01, 11 Fire Dampers Identified as Not Seismically Qualified,Per GDC 3.Caused by Faulty Installation Qa.Eight Dampers Replaced & Three Upgraded to Required Seismic Qualifications + (16:54:36, 13 December 2024)
- ML20091N332 + (16:54:37, 13 December 2024)
- ML20091N326 + (16:54:38, 13 December 2024)
- ML20091N325 + (16:54:39, 13 December 2024)
- ML20091N318 + (16:54:41, 13 December 2024)
- ML20091N314 + (16:54:42, 13 December 2024)
- ML20091N311 + (16:54:43, 13 December 2024)
- ML20091N309 + (16:54:44, 13 December 2024)
- ML20091N305 + (16:54:46, 13 December 2024)
- ML20091N303 + (16:54:47, 13 December 2024)
- ML20091N302 + (16:54:48, 13 December 2024)
- ML20091N300 + (16:54:49, 13 December 2024)
- ML20091N297 + (16:54:51, 13 December 2024)
- ML20091N291 + (16:54:56, 13 December 2024)
- ML20091N287 + (16:54:58, 13 December 2024)
- ML20091N289 + (16:54:58, 13 December 2024)
- ML20091N283 + (16:55:00, 13 December 2024)
- ML20091N279 + (16:55:01, 13 December 2024)
- NRC-95-4542, Forwards Nonproprietary WCAP-14443, AP600 Core Makeup Tank Level Instrument Test Data & Evalaution Rept, & WCAP-14293, AP600 Low Pressure Integral Sys Test at Oregon St University,Test Analysis Rept + (16:55:01, 13 December 2024)
- ML20091N274 + (16:55:15, 13 December 2024)