Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093J978 + (15:18:49, 13 December 2024)
- 05000446/LER-1995-003-01, :on 950914,discovered Incomplete Surveillance to Confirm Turbine Driven AFW Pump Steam Admission Valves Open Stroke for Black Out Signal.Caused by Less than Adequate Procedures.Procedures Revised + (15:18:51, 13 December 2024)
- ML20093J958 + (15:18:52, 13 December 2024)
- 0CAN109509, Provides Sixty Day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Operated Gate Valves + (15:18:53, 13 December 2024)
- ML20093J911 + (15:18:54, 13 December 2024)
- ML20093J945 + (15:18:54, 13 December 2024)
- ML20093J891 + (15:18:55, 13 December 2024)
- GO2-84-533, Advises of Plans to Restart Unit 3 in Jul 1985 & Unit 1 in Jul 1986,per 840925 Meeting Re Const Restart.Prior to Meeting,Bpa Released Draft Rept Requesting Addl 27-month Restart Delay.Program Developed for Activity Verification + (15:18:56, 13 December 2024)
- ST-HL-AE-1106, Responds to NRC Re Violations Noted in IE Insp Repts 50-498/84-07 & 50-499/84-07.Corrective Actions:Amend Recording Errors Corrected,Records Reviewed & Distribution Matrices Reviewed Against Station Files + (15:18:57, 13 December 2024)
- ML20093J862 + (15:18:57, 13 December 2024)
- NLS8400251, Application to Amend License DPR-46,changing Tech Specs to Incorporate Mods to Snubbers & 4-inch Recirculation Bypass Lines.Fee Paid + (15:18:58, 13 December 2024)
- ML20093J845 + (15:19:02, 13 December 2024)
- GO2-84-528, RO Re Use of Fan Motor W/O Performing Seismic Qualification. Caused by Motor Failure on Fan WWA-FN-53A.Motor to Be Reinstalled,Qualification Obtained & Spare Motor Ordered + (15:19:03, 13 December 2024)
- ML20093J834 + (15:19:04, 13 December 2024)
- ML20093J831 + (15:19:04, 13 December 2024)
- ML20093J829 + (15:19:05, 13 December 2024)
- ML20093J825 + (15:19:06, 13 December 2024)
- ML20093J820 + (15:19:07, 13 December 2024)
- ML20093J818 + (15:19:09, 13 December 2024)
- B15395, Forwards Nusco ISI Rept Class,1,2,Sys & Iwf - Supports Millstone Nuclear Power Station Unit 2 for 1995.Insps Covered by Rept Performed Between 941001 & 950802 + (15:19:10, 13 December 2024)
- W3P84-2740, Fifth Interim Deficiency Rept of Significant Const Deficiency 108 Re Potential Failure to Comply W/Fsar Safe Shutdown Commitment.Seven Addl Cables Identified as Needing Rerouting.Final Rept Expected by 841031 + (15:19:10, 13 December 2024)
- ML20093J812 + (15:19:12, 13 December 2024)
- ML20093J808 + (15:19:13, 13 December 2024)
- RBG-19070, Interim Deficiency Rept DR-191 Re Improperly Sized Gould-supplied Buchanan Stacking Type Terminal Blocks for Power Cables Feeding Loads from 125-volt Dc Motor Control Ctr.Initially Reported on 840829.Next Rept by 841116 + (15:19:14, 13 December 2024)
- ML20093J795 + (15:19:14, 13 December 2024)
- ML20093J792 + (15:19:15, 13 December 2024)
- ML20093J790 + (15:19:16, 13 December 2024)
- RBG-19073, Interim Deficiency Rept DR-241 Re Malfunctioning Voltage Regulator on Standby Diesel Generator.Initially Reported on 840831.Faulty Unit Replaced W/Part from Secondary Generator. Next Rept Expected by 841101 + (15:19:16, 13 December 2024)
- ML20093J783 + (15:19:17, 13 December 2024)
- 05000249/LER-1984-014-05, :on 840904,ECCS Surveillances Not Completed Prior to Rendering Loop a Inoperable.Caused by Personnel Error While Taking LPCI Component Cooling Svc Water HX Delta P Valve Out of Svc + (15:19:19, 13 December 2024)
- ML20093J773 + (15:19:20, 13 December 2024)
- 05000374/LER-1984-057, :on 840830,differential Flow Isolation on Reactor Water Cleanup Sys Occurred During Hot Shutdown. Caused by Density Differences Detected by Flow Instruments. Instrument Calibr Range Changes Investigated + (15:19:22, 13 December 2024)
- ML20093J763 + (15:19:23, 13 December 2024)
- ML20093J761 + (15:19:24, 13 December 2024)
- 05000339/LER-1995-001-01, :on 950403,MS Pressurizer Safety Valve Setpoints Out of Tolerance Due to Setpoint Drift.Repaired MSSVs + (15:19:25, 13 December 2024)
- ML20093J752 + (15:19:26, 13 December 2024)
- ML20093J745 + (15:19:27, 13 December 2024)
- ML20093J704 + (15:19:28, 13 December 2024)
- ML20093J732 + (15:19:28, 13 December 2024)
- NLS8400201, Forwards Rev 2 to Updated FSAR for Cooper Nuclear Station.Qa Program Removed from FSAR & Radwaste Components Reclassified + (15:19:29, 13 December 2024)
- ML20093J698 + (15:19:30, 13 December 2024)
- ML20093J695 + (15:19:30, 13 December 2024)
- ML20093J689 + (15:19:31, 13 December 2024)
- ML20093J686 + (15:19:32, 13 December 2024)
- ML20093J678 + (15:19:33, 13 December 2024)
- B11270, Forwards Second Revised Response to Ser,Item 218 Re Transformers Used as Isolation Devices + (15:19:34, 13 December 2024)
- ML20093J665 + (15:19:34, 13 December 2024)
- 05000416/LER-1984-041, :on 840909,more than One Jet Pump Failed diffuser-to-lower-plenum Differential Pressure Surveillance Testing.Cause Not Stated.Three Transmitters Replaced & Three Recalibr + (15:19:36, 13 December 2024)
- ML20093J657 + (15:19:37, 13 December 2024)
- ML20093J652 + (15:19:38, 13 December 2024)
- ML20093J648 + (15:19:39, 13 December 2024)