ML20093J783

From kanterella
Jump to navigation Jump to search
Errata to Monthly Operating Rept for Mar 1984
ML20093J783
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/31/1984
From: Loignon G
SOUTH CAROLINA ELECTRIC & GAS CO.
To:
Shared Package
ML20093J749 List:
References
NUDOCS 8407300359
Download: ML20093J783 (1)


Text

.

4 Director, Office of Resource Management March Monthly Operating Report Page 3 Apen 10,1984 Fev1 bad - July 11, 1984 ATTACHMBff II OPERATI!G DATA REPORT DOCKEf 10. 50/395 UNIT V. C. SUlWER I DA'IE 04/10/64 COMPIETED BY G. A. Imignon 3~

TELEPHONE (803) 345-5209 OPERATING STA'1US

1. Reporting Period:

MARCH 1984 Gross Hours in Reporting Period: 744

2. Currently Authorized Power Ievel (MWt):

2775 Max. Depend. Capacity (MWe-Net):

885 Design Electrical Rating (MWe-Net):

900 4

3. Power Level to which restricted (If Any)(MWe-Net): N/A
4. Reasons for Restrictions (If Any): N/A j

THIS FONTH YR TO DATE CUMULATIVE

5. Number of Hours Beactor Ws Critical 533.5 1,910 3 1,910.3 l
6. Reactor Reserve Shutdown Hours 0

0 0

7. Hours Generator on Line 531.5 1,675.7 1,675 7 l
8. Unit Reserve Shutdown Hours 0

0 0

j

9. Gross Thermal Energy Generated (MWH) 1,459,743 5,122,967 5,122,987 i
10. Gross Electrical Energy Generated (MWH) 490,650 1,713,230 1,713,230
11. Net Electrical Energy Generated (MWH) 468,655 1,640,182 1,640,182
12. Reactor Service Factor 71.7 67.5 67.5
13. Reactor Availability Factor 71.7 67 5 67 5
14. Unit Service Factor 71.4 85.9 85 9
15. Unit Availability Factor 71.4 65 9 65 9 i
16. Unit Capacity Factor (Using MDC) 71.2 64 9 64.9
17. Unit Capacity Factor (Using Design !We) 70.0 83.4 81.4 i
18. Unit Fbeced Outage Rate 0.0 49 L.9 i
19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Scheduled refueling - September 1, 1984

20. If Shut Down at Ehd of Report Period, Estimated Date of Startup: April 18, 1984
21. Units in Test Status (Prior to Comerical Operation):

FORECAST ACHIEVED Initial Criticality N/A 10-22-82 Initial Electricity N/A Ti-16-62 Comercial Operation N/A 01-01-84 i

8407300359 840711 PDR ADOCK 05000395 R

PDR

_