Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093L105 + (15:14:08, 13 December 2024)
- ML20093L104 + (15:14:08, 13 December 2024)
- ML20093L101 + (15:14:09, 13 December 2024)
- ML20093L099 + (15:14:10, 13 December 2024)
- ML20093L096 + (15:14:10, 13 December 2024)
- ML20093L093 + (15:14:11, 13 December 2024)
- ML20093L085 + (15:14:12, 13 December 2024)
- ML20093L092 + (15:14:12, 13 December 2024)
- ML20093L084 + (15:14:13, 13 December 2024)
- ML20093L078 + (15:14:14, 13 December 2024)
- NRC-95-0090, Forwards Response to NRC Ltr Re Violations Noted in Insp Rept 50-341/95-09.Corrective Actions:Inspected App R Emergency Lights + (15:14:14, 13 December 2024)
- ML20093L077 + (15:14:15, 13 December 2024)
- ML20093L075 + (15:14:15, 13 December 2024)
- BSEP-95-0512, Requests Approval to Use Code Case N-524 Re Requirements for Exam of Longitudinal Welds in Class 1 & 2 Piping + (15:14:16, 13 December 2024)
- RBG-42060, Forwards Rev Summary for Facility SBO Analysis Previously Submitted 911018,as Result of Requests from NRC During Engineering & Technical Support Insp 50-458/95-10 on 950320- 24,0403-07 & 21 + (15:14:17, 13 December 2024)
- HL-5043, Responds to NRC Re Violations Noted in Insp Repts 50-321/95-17 & 50-366/95-17.Corrective Actions:Changed Units 1 & 2 LPCI Valve Surveillance Procedures + (15:14:18, 13 December 2024)
- ML20093L068 + (15:14:19, 13 December 2024)
- ML20093L069 + (15:14:19, 13 December 2024)
- ML20093L067 + (15:14:20, 13 December 2024)
- ML20093L066 + (15:14:24, 13 December 2024)
- ML20093L063 + (15:14:25, 13 December 2024)
- TXX-4239, Forwards Addl Info from Westinghouse Re Containment Sump Performance,In Response to NRC Questions on 840629 Consolidated Rept Concerning Paint & Insulation Debris Effects on Containment Emergency Sump Performance + (15:14:26, 13 December 2024)
- ML20093L055 + (15:14:27, 13 December 2024)
- RBG-42028, Responds to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (15:14:27, 13 December 2024)
- ML20093L049 + (15:14:28, 13 December 2024)
- ML20093L048 + (15:14:29, 13 December 2024)
- ML20093L038 + (15:14:30, 13 December 2024)
- ML20093L033 + (15:14:31, 13 December 2024)
- ML20093L037 + (15:14:31, 13 December 2024)
- ML20093L032 + (15:14:32, 13 December 2024)
- ML20093L031 + (15:14:33, 13 December 2024)
- ML20093L029 + (15:14:34, 13 December 2024)
- ML20093L028 + (15:14:35, 13 December 2024)
- ML20093L024 + (15:14:37, 13 December 2024)
- ML20093L023 + (15:14:38, 13 December 2024)
- ML20093L022 + (15:14:39, 13 December 2024)
- ML20093L016 + (15:14:40, 13 December 2024)
- TXX-4338, Forwards Errata to Comanche Peak Steam Electric Station Fire Protection Program Deviations, Rev 2 to Design Basis Document..., Revised Fire Hazard Analysis Drawings & Change Pages to Amend 53 to FSAR Section 9.5.1.W/o Drawings + (15:14:41, 13 December 2024)
- ML20093L011 + (15:14:41, 13 December 2024)
- ML20093L005 + (15:14:42, 13 December 2024)
- ML20093L002 + (15:14:43, 13 December 2024)
- 3F0784-17, Application for Amend to License DPR-72,consisting of Tech Spec Change Request 123,deleting Cable Tunnel Sump Pump Surveillance Requirement Re Ac Sources.Fee,Certificate of Svc & NSHC Determination Encl + (15:14:44, 13 December 2024)
- ML20093K998 + (15:14:46, 13 December 2024)
- ML20093K993 + (15:14:47, 13 December 2024)
- ML20093K996 + (15:14:47, 13 December 2024)
- ML20093K991 + (15:14:48, 13 December 2024)
- ML20093K990 + (15:14:49, 13 December 2024)
- ML20093K988 + (15:14:49, 13 December 2024)
- ML20093K980 + (15:14:50, 13 December 2024)
- ML20093K981 + (15:14:50, 13 December 2024)
- ML20093K978 + (15:14:51, 13 December 2024)