Informs That GE Respectively Declines Request to Provide Requested Drawings & Suggests That NRC Make Reference to Listed Schematic as non-proprietary Version of Drawings
ML20093L067
Person / Time
Site: 05200004
Issue date: 10/18/1995
From: Quinn J
GENERAL ELECTRIC CO.
To: Quay T
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MFN-234-95, NUDOCS 9510250177
Download: ML20093L067 (2)


Text

.

h

=

.a GENuclear Energy hmes E Guiren AdvancedReactor Programs Propcts Manager. LMR and SBWR Prograrns GeneralBectnc Company 175 Curtner Ave. MlC 165 San Jose. CA 951251088 408 925-1005. DoalComm: 8'425-1005 fr 408 925-3991. Emad: 0umnJ@ sjcpo2 ne ge com October 18,1995 MFN 234-95 Docket No 52-004 Document Control Desk U.S. Nuclear Regulatory Commission Washington DC 20555 Attention:

Theodore E. Quay, Director Standardization Project Directorate

Subject:

SBWR - GIRAFFE As-Built Drawings, Report TOGEl 10-T19, May 20,1995

Reference:

1. Letter from S.Q. Ninh (NRC) to Mr. James E. Quinn (GE), The Simplified Boiling Water Reactor - Giraffe As-Built Drawings, Report TOGEl10-T19, May 20,1995, dated August 10,1995.
2. Letter, MFN 124-95, from James E. Quinn (GE) to Theodore E. Quay (NRC),

SBWR - Giraffe As-Built Drawings, Report TOGEl10-T19, May 20,1995, dated July 24,1995.

3. Letter, MFN 045-95 from James E. Quinn (GE) to Richard W. Borchardt (NRC),

SBWR Test and Analysis Program Description, NEDO-32391, Revision B, dated April 13,1995.

Reference 1 requests that GE submit a non-proprietary version of the subject drawings transmitted by Reference 2. We have reviewed this with your staff and have concluded that it is highly impractical to develop a non-proprietary version of as-built drawings. For example, it would be possible to remove all of the as-built dimensions leaving an undimensioned but detailed layout of the GIRAFFE test facility. However, such a layout would still be considered as proprietary since it would retain all of the layout details of the original as-built drawings. The logical next step would be to simplify the undimensioned layout to eliminate any proprietary detail. Clearly, the resulting simplified layout would have little relationship to the original as-built drawings.

A logical and practical source of non-proprietary GIRAFFE test facility drawings would be the schematic drawings provided by Reference 3; specifically Figure A.3-20. Therefore, GE respec-tively declines your request for GE to provide the requested drawings and suggests the NRC make reference to the above schematic as the non-proprietary version of the subject drawings.

Sincerey,

[V 8B h

ames E. d'u'mn d u U.L 2 4 J

e 9510250177 951018 Qt PDR ADDCK 05200004 3

0 A

PDR

.g '*

October 18,1995 MFN 234-95 Docket No.52-004 cc:

P. A. Boehnert (NRC/ACRS)(2 paper copies plus E-Mail)

I. Catton (ACRS)

(1 paper copy plus E-Mail)

A. Drozd (NRC)

(1 paper copy plus E-Mail)

S. Q. Ninh (NRC)

(2 paper copies plus E Mail)

D. C. Scaletti (NRC)

(1 paper copy plus E-Mail)

J. H. Wilson (NRC)

(1 paper copy plus E-Mail) l l