Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20094M418 + (14:16:56, 13 December 2024)
- ML20094M417 + (14:16:57, 13 December 2024)
- ML20094M416 + (14:16:57, 13 December 2024)
- ML20094M413 + (14:16:58, 13 December 2024)
- B14075, Submits Addl Info on Util self-assessment & Enhancement Efforts Conducted to Electrical Distribution Sys (Eds) Since 1990.Effort Intented to Assess That Edss Function as Designed,Per Gdc,Current NRC Requirements & Industry Stds + (14:16:59, 13 December 2024)
- ML20094M412 + (14:16:59, 13 December 2024)
- NG-95-2969, Application for Amend to License DPR-49 Re RPT Operability & Surveillance Requirements + (14:17:00, 13 December 2024)
- ML20094M407 + (14:17:01, 13 December 2024)
- ML20094M405 + (14:17:03, 13 December 2024)
- 05000482/LER-1991-024, :on 911028,discovered That Incorrect Spring Packs Installed in Actuators for Spray Additive Tank Outlet. Team Initiated to Examine All Safety Related MOV Testing Programs.Mgt Action Plan Also Initiated + (14:17:05, 13 December 2024)
- ML20094M403 + (14:17:06, 13 December 2024)
- RBG-36652, Forwards Rev 14A to Physical Security Plan,Per AB Beach .Addl Changes Made to Plan to Reflect Current Activities of Security Program.Rev Withheld (Ref 10CFR 73.21) + (14:17:09, 13 December 2024)
- 3F0392-07, Provides Info Concerning Status of Requirements Associated w/NUREG-0737,Item III.D.3.4, Control Room Habitability. All Actions on Subj Item Were Complete as of May 1989 & Item May Be Closed Out + (14:17:11, 13 December 2024)
- ML20094M385 + (14:17:12, 13 December 2024)
- 3F0392-01, Discusses Activities Completed During Current Operating Cycle & Items Committed to Be Completed in Upcoming Refuel Outage 8R.List of Equipment Relocated to Resolve Reactor Bldg Flood Level Issue Encl + (14:17:13, 13 December 2024)
- ML20094M381 + (14:17:15, 13 December 2024)
- ML20094M380 + (14:17:16, 13 December 2024)
- ML20094M372 + (14:17:17, 13 December 2024)
- ML20094M374 + (14:17:17, 13 December 2024)
- ML20094M371 + (14:17:18, 13 December 2024)
- ML20094M370 + (14:17:20, 13 December 2024)
- 05000499/LER-1992-003, :on 920224,feedwater Flow Oscillations Observed on turbine-driven SG Feedwater Pump 23,resulting in Reactor Trip.Caused by Rain Water Leaking Through Expansion Joints.Control Sys Dried Out + (14:17:21, 13 December 2024)
- ML20094M363 + (14:17:23, 13 December 2024)
- 05000325/LER-1992-005, :on 920229,reactor Scram Occurred During Stop Valve Testing.Caused by Circuit Malfunction Which Prevented Inhibit Function of Master/Slave Logic.Limit Switch Replaced & Test Switch Installed + (14:17:25, 13 December 2024)
- ST-HL-AE-4048, Lists Property Insurance Coverage in Force at Facilities + (14:17:26, 13 December 2024)
- ML20094M355 + (14:17:27, 13 December 2024)
- ML20094M352 + (14:17:29, 13 December 2024)
- ML20094M350 + (14:17:29, 13 December 2024)
- JPN-95-050, Responds to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity + (14:17:30, 13 December 2024)
- ML20094M346 + (14:17:30, 13 December 2024)
- ML20094M343 + (14:17:32, 13 December 2024)
- 3F1195-01, Responds to GL 92-01,rev 1,suppl 1, Reactor Vessel Structural Integrity + (14:17:33, 13 December 2024)
- PY-CEI-NRR-2003, Responds to GL 92-08, Thermo-Lag 330-1 Fire Barriers, Specifically Ampacity Derating Issues + (14:17:33, 13 December 2024)
- ML20094M338 + (14:17:34, 13 December 2024)
- ML20094M337 + (14:17:35, 13 December 2024)
- ML20094M333 + (14:17:36, 13 December 2024)
- ML20094M332 + (14:17:37, 13 December 2024)
- NG-95-3157, Responds to NRC Bulletin 95-002, Unexpected Clogging of RHR Pump Strainer While Operating in Suppression Pool Cooling Mode + (14:17:38, 13 December 2024)
- ML20094M330 + (14:17:39, 13 December 2024)
- ML20094M317 + (14:17:40, 13 December 2024)
- ML20094M314 + (14:17:41, 13 December 2024)
- 05000285/LER-1992-006, :on 920125,discovered That Alarm Function on Radioactive Waste Bldg Stack Monitors Were Inoperable.Caused by Personnel Error.Training Re self-checking & post-mod Testing Requirements Will Be Performed + (14:17:43, 13 December 2024)
- ML20094M312 + (14:17:45, 13 December 2024)
- 05000339/LER-1992-002-02, :on 920229,inadvertent ESF Actuation Occurred During CDA Functional Test Due to Failure of Ssps Slave Relay Latch Mechanism.Cda Functional Test Procedures Will Be Revised + (14:17:47, 13 December 2024)
- ML20094M310 + (14:17:49, 13 December 2024)
- 05000306/LER-1992-002-01, :on 920220,interruption of One Train of RHR Occurred During RCS Draining Operation.Caused by Inadequate Supervisory Methods.Pressurizer Manway Removed to Vent RCS & Emergency Procedure 2E-4 Changed + (14:17:52, 13 December 2024)
- ML20094M307 + (14:17:57, 13 December 2024)
- ML20094M305 + (14:17:58, 13 December 2024)
- ML20094M302 + (14:18:00, 13 December 2024)
- ML20094M296 + (14:18:02, 13 December 2024)
- 05000321/LER-1992-006, :on 920226,HPCI Sys Declared Inoperable Due to Failure to Achieve Stable Flow & Pressure at Rated Conditions.Caused by Inadequate Maint Procedures.Flow Control Sys Adjusted to Increase Stability + (14:18:04, 13 December 2024)
- ML20094M283 + (14:18:09, 13 December 2024)