ML20094M302

From kanterella
Jump to navigation Jump to search
Amend 82 to License DPR-59,revising Surveillance Testing Frequency for Unit Coolers Serving ECCS Components
ML20094M302
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 08/03/1984
From: Vassallo D
Office of Nuclear Reactor Regulation
To:
Power Authority of the State of New York
Shared Package
ML20094M303 List:
References
DPR-59-A-082 NUDOCS 8408150613
Download: ML20094M302 (4)


Text

r

/ ># Hogg UNITED STATES

[

/g NUCLEAR REGULATORY COMMISSION s,

5

z WASHINGTON.D C.20555

'O

,5

  • ...+

POWER AUTHORITY OF THE STATE OF NEW YORK DOCKET NO. 50-333 JAMES A. FITZPATRICK NUCLEAR POWER PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 82 License No. DPR-59 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A..

The application for amendment by the Power. Authority of the State of New York (the licensee) dated February 25, 1983, as supplemented May 3,1984, complies with the standards and requirementsoftheAtomicEnergyActof1954,asamended(the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of l

the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The' issuance of this amendment is *n accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by t.hanges to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C(2) of Facility Operating License No.

DPR-59 is hereby amended to read as follows:

6,g

(

- 2.-

(2)--Technical Specifications The : Technical Specifications contained in Appendices A and B, as revised through Amendment No. 82,: are hereby-incorporated in the license. The licensee shall operate -the facility.in accordance with-the Technical-Specifications.

3.

This license amendment.is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION o-~_

_)

Domenic.B. Vassal ef

' Operating Reactors Branch #2 Division of Licensing

Attachment:

Changes to the Technical Specifications Date of Issuance:. August 3,1984 -

N a r.

l l

m.__

  • u,

-ATTACHMENT TO LICENSE AMENDMENT NO. 82 FACILITY OPERATING LICENSE NO. DPR-59 DOCKET N0. 50-333 Revise the-Appendix "A" Technical Specifications as follows:

Remove

- Insert

_m 239 239 P

O O

4 m

  • am -

l 4

e 2

9 I

\\

,r - l(,* > ' p r :..

g 3.11 g

.st'd)

JAJ1H'P

,4,11 (cont'd)

B.

Crescent Are'a Ventilation B.

Crescent Area Ventilation Crescentareaventilationan@ cooling Unit coolers serving ECCS equipsent shall be operable on a e

components shall be checked continuous basis whenever specification for operability once/3, months 3.5.A,.3.5.D, and 3.5.C are required j

to be satisfied.

1.

When it is determined that two unit coolers serving 1.

From and after the date that ECCS components in the same more than one unit cooler compartment are made or serving ECCS components in found inoperable, reactor the same compartment are made operation may continue for or found to be inoperable, 7 days unless one is made all ECCS components in that operable earlier.

compartment shall be considered e

to be inoperable for purposes 2.

Temperature Indicator of specification 3.5.A, 3.5.c, controllers shall,bo and 3.5.D.

calibrated once/ operating cycle.

C.

Battery Room Ventilation l'

3.

If 3.11.B.1 cannot be met, Dattery room ventilation shall be the reactor shal1 be placed operable on a continuous basis in a cold colidition within whenever specification 3.9.E is 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

required to be satisfied.

t C.. Battery Room Ventilation l

1.

From and after the date that one of the battery room ventil-Dattery room ventilation equip-ation systems is made or found ment shall be checked for to Ub inoperable,'Its associated operability once/ week, battery shall be considered to be inoperable for purposes of

,1.

When it is determined that j

specification 3.9.E.

one battery room ventilation system is inoperable, the remalning ventfaltion system j

shall be checked for operability and daily thereafter.

2.

Temperature transmitters and differential pressure switches j

Amendment No. )4I, 82 239 1

/

t

<