ML20094M417
| ML20094M417 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 07/20/1983 |
| From: | Warnick R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Smidth P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML19258A087 | List:
|
| References | |
| CON-BX20-006, CON-BX20-6, FOIA-84-96 NUDOCS 8408150643 | |
| Download: ML20094M417 (1) | |
Text
-
.x
.j [-
A 4
1 1 j
'JUL 2 0 1983 MRMnEANDUM POR: Pearl T. Saidth, n="4-III EDIA Coordinator
\\
FROM:
- 1. F. Warnick, Director, Office of Special Cases
SUBJECT:
RESPONSE TO POIA 83-397 POIA Raquest 83-397 has been reviewed. The below listed documents are submitted in response to this request. Please reproduce them and return them to me.
A total of one hour (1. Gardner
.5 hr.; J. Barrison
.5 hr.)
of professional time was spent in the retrieval of these documents.
Documents Supplied by J. J. Barrison and R. N. Cardner t
1.
Draft latter (T. Novak to J. Cook), subject: Caseload Forecast Panel Ratimata of Construction Completion Schedule 2.
Bandwritten notes of J. Barrison (7 pages) 3.
NRC Meeting Botice dated April 6, 1983 4.
Meeting Attaahace Sheet dated April 19, 1983 5.
CPCo Caseload Panel Presentation Data; total of 234 pages, sheets, graphs and drawings, presented to the NRC on April 19-21, 1983 Items 1, 3, 4 c7d 5 Messrs. Cardner and Barrison had the same documents.
Mr. Cardner had no handwritten or typed notes.
avgjgl,,cl ci z.d ';
?.. I' UCUICA t
- I. '.
<l
/>
R. P. Warnick, Director
- l. '.
Office of Special Cases N'
Enclosure:
. Documents supplied by OSC staff i~i ec w/o emel:
A. B. Davis h B g 43 84071g RICEB4-96 PDR q
"*>.RIII...QT....
....h.
,f, I
' ' Sum * > Gardn. e..r./l.s...,l.. H. a. r..r.i. sonqy...p.
Warnick e
- 4. 7./. 20./83....I l
l p....
' h.=.---- q
- i. g x ~.-_- -. A
-.---- t i
m.
~.
_.____m_..._,_
_,