Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20094N206 + (14:11:59, 13 December 2024)
- ML20094N212 + (14:11:59, 13 December 2024)
- ML20094N196 + (14:12:00, 13 December 2024)
- ML20094N195 + (14:12:01, 13 December 2024)
- ML20094N185 + (14:12:03, 13 December 2024)
- ML20094N184 + (14:12:03, 13 December 2024)
- ML20094N177 + (14:12:04, 13 December 2024)
- ML20094N178 + (14:12:04, 13 December 2024)
- ML20094N176 + (14:12:05, 13 December 2024)
- ML20094N173 + (14:12:06, 13 December 2024)
- ML20094N169 + (14:12:07, 13 December 2024)
- ML20094N159 + (14:12:08, 13 December 2024)
- ML20094N168 + (14:12:08, 13 December 2024)
- ML20094N151 + (14:12:09, 13 December 2024)
- ML20094N144 + (14:12:10, 13 December 2024)
- ML20094N149 + (14:12:10, 13 December 2024)
- ML20094N142 + (14:12:11, 13 December 2024)
- ML20094N129 + (14:12:11, 13 December 2024)
- ML20094N128 + (14:12:12, 13 December 2024)
- JAFP-92-0281, Forwards Monthly Operating Repts for Feb & Mar 1992 for Ja Fitzpatrick Nuclear Power Plant + (14:12:13, 13 December 2024)
- ML20094N107 + (14:12:14, 13 December 2024)
- RBG-42192, Dockets Util Interim Response to Items (2),(3) & (4) for Info Requirements Listed in GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity + (14:12:15, 13 December 2024)
- ML20094N098 + (14:12:16, 13 December 2024)
- ML20094N097 + (14:12:17, 13 December 2024)
- ML20094N091 + (14:12:17, 13 December 2024)
- ML20094N075 + (14:12:18, 13 December 2024)
- ML20094N070 + (14:12:19, 13 December 2024)
- ML20094N068 + (14:12:21, 13 December 2024)
- ML20094N066 + (14:12:22, 13 December 2024)
- ML20094N064 + (14:12:23, 13 December 2024)
- ML20094N059 + (14:12:24, 13 December 2024)
- ML20094N057 + (14:12:25, 13 December 2024)
- ML20094N050 + (14:12:30, 13 December 2024)
- ML20094N044 + (14:12:31, 13 December 2024)
- ML20094N040 + (14:12:32, 13 December 2024)
- ML20094N035 + (14:12:33, 13 December 2024)
- ML20094N027 + (14:12:33, 13 December 2024)
- ML20094N022 + (14:12:37, 13 December 2024)
- NRC-84-0106, Clarifies Snupps Design & Procedural Controls for Mitigation of Postulated Control Room Fires,Per Sser 3 (NUREG-0830). Requests Meeting W/Nrc,Per Procedures for Disposition of Backfitting Requirements Implemented by IE & NRR + (14:12:38, 13 December 2024)
- ML20094N018 + (14:12:38, 13 December 2024)
- AECM-84-0405, Final Part 21/Deficiency Rept PRD-84/10 Re Swelling of Gh Bettis Valve Actuator Ethylene Propylene Rubber Elastomer Seals in Contact W/Hydrocarbon Lubricant.Initially Reported on 840730.Reportable Under Part 21 for Unit 1 + (14:12:39, 13 December 2024)
- ML20094N014 + (14:12:40, 13 December 2024)
- ML20094N009 + (14:12:40, 13 December 2024)
- ML20094N008 + (14:12:41, 13 December 2024)
- 05000302/LER-1995-022, :on 951018,sys Flow Balancing Identified Low Flow to Components Resulting in Operations Outside Design Basis.Caused by Inadequate Procedures.Procedure Revised & DC Sys Rebalanced + (14:12:43, 13 December 2024)
- ML20094N003 + (14:12:44, 13 December 2024)
- ML20094M999 + (14:12:45, 13 December 2024)
- 05000272/LER-1995-026, :on 951023,MSSV Failed Lift Set Test.Cause Under Investigation.Appropriate Enhancements Will Be Made to Safety Valve Program Based on Results of Root Cause Determination + (14:12:47, 13 December 2024)
- ML20094M985 + (14:12:48, 13 December 2024)
- ML20094M987 + (14:12:48, 13 December 2024)
- RBG-42191, LAR 95-22,proposing Changes to Ts,By Eliminating Selected Response Time Testing Requirements + (14:12:49, 13 December 2024)