This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000397/LER-1984-077, :on 840720 & 21,control Room Emergency Filtration Unit Automatically Actuated.Caused by Spikes on Corresponding Control Room Outside Air Radiation Monitor. Emergency Filtration Unit Reset + (14:00:58, 13 December 2024)
- 05000395/LER-1984-029, :on 840713,three Speed & Transfer Switch Hinge Stud Assemblies on Svc Water Pump Torqued to Recommended Valve Failed.Util Contacting Brown Boveri for Corrective Action + (14:01:01, 13 December 2024)
- ML20094Q812 + (14:01:02, 13 December 2024)
- ML20094Q807 + (14:01:03, 13 December 2024)
- ML20094Q811 + (14:01:03, 13 December 2024)
- ML20094Q804 + (14:01:04, 13 December 2024)
- 3F0884-02, Provides Excerpts from Missile Impact Analysis Rept E/L 20622 Re turbine-driven Emergency Feedwater Pump Missile Potential,In Response to NUREG-0737,Item II.E.1.1. Response Satisfies Item 2b of 840501 SER + (14:01:05, 13 December 2024)
- SNRC-1051, Forwards Summary of Disposition of Generic Ltrs for CY83 + (14:01:06, 13 December 2024)
- ML20094Q794 + (14:01:07, 13 December 2024)
- 05000354/LER-1995-025-01, :on 951024,HPCI Sys Was Declared Inoperable Due to Out of Adjustment Limit Switch.Replaced Limit Switch & Repaired HPCI Turbine Steam Admission Valve + (14:01:09, 13 December 2024)
- ML20094Q780 + (14:01:11, 13 December 2024)
- ML20094Q771 + (14:01:12, 13 December 2024)
- ML20094Q768 + (14:01:13, 13 December 2024)
- DCL-84-277, Responds to NRC Re Violations Noted in IE Insp Rept 50-275/84-10.Corrective Actions:Procedure C-4S1, Mechanical Bypass,Jumper & Lifted Circuit Log, Revised to Include Jumpers in Clearance Package + (14:01:14, 13 December 2024)
- ML20094Q762 + (14:01:18, 13 December 2024)
- 05000354/LER-1995-020, :on 950908,automatic Actuation of HPCI Suction Path Swapover ESF Occurred.Caused by Absence of Realistic Operating Band Considering Loop Inaccuracies.Incorporated Realistic Band Into Operations Procedures + (14:01:20, 13 December 2024)
- 3F0884-03, Advises That Emergency Operating Procedure OP-404, DHR Sys, Addresses Concern Raised at 840215 Meeting Re Boron Precipitation Decay Heat Sys Flow Into Reactor Hot Leg + (14:01:21, 13 December 2024)
- ML20094Q727 + (14:01:22, 13 December 2024)
- ML20094Q734 + (14:01:22, 13 December 2024)
- 0CAN088409, Informs That Response to Recommendation GL-2 Re Inadvertent Closure to Condensate Storage Tank Isolation Valve (NUREG-0737,Item II.E.1.1) Will Be Delayed Until 840824 Due to Outage Preparation Work + (14:01:23, 13 December 2024)
- ML20094Q720 + (14:01:25, 13 December 2024)
- 05000259/LER-1984-026, :on 840620,unidentified Drywell Leakage Exceeded Tech Spec Coolant Leakage Rate of 5 Gpm.Orderly Shutdown Initiated & Unit Manually Scrammed at 59% Power. Seal Replaced + (14:01:27, 13 December 2024)
- 05000354/LER-1995-028, :on 951030,failed to Exert Best Efforts to Restore Liquid Effluent Radiation Monitoring Sys to Operable Status.Caused by Low Mgt Priority Given.Improved Related Processes + (14:01:29, 13 December 2024)
- ML20094Q708 + (14:01:30, 13 December 2024)
- ML20094Q707 + (14:01:31, 13 December 2024)
- TXX-4257, Interim Significant Deficiency Rept SDAR-132 Re Installation of Curtain Fire Dampers W/O Proper Provisions for Thermal Expansion.Initially Reported on 840330.Review Revealed 50 Dampers Required Rework or Mod.Next Rept by 840817 + (14:01:32, 13 December 2024)
- 05000298/LER-1995-016, :on 951027,during Core off-load,MCR Supply Fans Shut Down.Single Train CREFS Inoperable.Caused by Personnel Error.Cr Ventilation Restored 9 Minutes Later.Licensed Operator Responsible Counseled + (14:01:34, 13 December 2024)
- ML20094Q680 + (14:01:35, 13 December 2024)
- ML20094Q677 + (14:01:37, 13 December 2024)
- ML20094Q676 + (14:01:38, 13 December 2024)
- ML20094Q672 + (14:01:39, 13 December 2024)
- ML20094Q669 + (14:01:41, 13 December 2024)
- ML20094Q671 + (14:01:41, 13 December 2024)
- 05000387/LER-1984-034, :on 840715,while Operating at 100% power,230-kV Transmission Line Experienced phase-to-phase Fault,Resulting in Generator Load Rejection & Turbine Trip.Caused by Line Sagging Into Tree + (14:01:43, 13 December 2024)
- ML20094Q664 + (14:01:44, 13 December 2024)
- ML20094Q655 + (14:01:45, 13 December 2024)
- ML20094Q654 + (14:01:45, 13 December 2024)
- 3F0884-10, Requests Extension of Time to 841130 to Respond to 840702 Generic Ltr 84-15,requesting Data & Commentary Re Improvement to & Maint of Diesel Generator Reliability + (14:01:46, 13 December 2024)
- ML20094Q646 + (14:01:47, 13 December 2024)
- ML20094Q642 + (14:01:47, 13 December 2024)
- 05000354/LER-1995-027, :on 951027,grab Sample Not Taken within Required 8 Hour Period.Caused by Equipment Failure Resulting in 12 Hour Hot Shutdown.Investigation & Repair of Equipment Failures Initiated + (14:01:49, 13 December 2024)
- 05000250/LER-1984-021, :on 840714,reactor Tripped from Subcritical Condition.Caused by Power Interruption of Source Range Nuclear Instrumentation Control Power.Personnel Counseled.W/ + (14:01:51, 13 December 2024)
- 05000301/LER-1995-004-01, :on 951026,inadvertent ESF Actuation Occurred as Result of Improper Relay Alignment.Assigned Addl Technician to Concurrently Check Proper Removal & Installation of Remaining Relays + (14:01:53, 13 December 2024)
- ML20094Q608 + (14:01:55, 13 December 2024)
- ML20094Q606 + (14:01:56, 13 December 2024)
- ML20094Q604 + (14:01:56, 13 December 2024)
- ML20094Q594 + (14:01:57, 13 December 2024)
- ML20094Q592 + (14:01:58, 13 December 2024)
- HL-5050, Forwards Rev 14A to Ei Hatch Nuclear Plant Units 1 & 2 FSAR Update & Rev 11A to Ei Hatch Nuclear Plants Units 1 & 2 Fire Hazards Analysis & Fire Protection Program + (14:01:59, 13 December 2024)
- ML20094Q577 + (14:02:00, 13 December 2024)
- ML20094Q581 + (14:02:00, 13 December 2024)