LONG ISLAND LIGHTING COMPANY kom.2,,,,y SHOREHAM NUCLEAR POWER STATION P.O. BOX 618, NORTH COUNTRY ROAD + WADING RIVER N.Y.11792 I
JOHN D. LEONARD, JR.
VCE PRESIDENT NUCLEAR OPERATIONS August 14, 1984 SNRC-1051 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Summary of the Disposition of NRC Generic Letters for the Year 1983 Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322
Dear Mr. Denton:
The NRC generic letters for 1983 have been reviewed and the issues therein pertinent to the Shoreham Nuclear Power Station have been addressed.
This letter will serve to update our letter (SNRC-867 of June 7, 1983) and covers the subject for the calendar year 1983.
It is in furtherance of a request for this information by Mr. Ralph Caruso, Shoreham Project Manager for the NRC.
A check of 1983 generic letters not listed in Attachment I has indicated that they were not applicable to Shoreham.
The disposition of each generic letter received by LILCO is shown in Attachment I.
If additional information is required, please contact the undersigned.
Very truly yours,
\\
w.
hn D.
Leo ar r.
j
'ce President -
u lear Operations MJG:ck B408200328 840814
~
PDR ADDCK 05000322 Attachment A
PDR cc:
P. Eselgroth, Sr. Resident Inspector, NRC D
C. Petrone, Resident Inspector, NRC 1l[
r:
~-
{
ATTACHMENT I Generic Letter' Date of No. -
Issuance Disposition 83 ~1/11/83 SNRC-852 of March 7, 1983 lists a tenta-
~
tive schedule of NRC Shoreham site visit requirements-thru 1985.
83 1/10/83 A written response is not required - all items either incorporated or not appli-cable to Shoreham except challenges to the SRVs which are reported via annual SRV Surveillance Program.
83-04 2/1/83 A written response is not required.
Region I workshop on NUREG 0737, Supple-ment I - Requirements for Emergency Response Capability was attended by LILCO representatives.
o 83-05 2/8/83 SNRC-830 of February 3, 1983, covered submission of Shoreham specific Emergency Procedure Guidelines to the Commission.
NRC indicated their accept-ability via supplements No 3 and 4 of the SER.
83-06 1/31/83 A written response is not required to this Generic Letter.
It announced issuance of formal RO and SRO License Certificates in revised format.
83-07 2/16/83 SNRC-932 of July 11, 1983 replies to this Generic Letter and establishes that LILCO/ DOE contract #DE-CR01-83NE 44392 has been entered into to satisfy its requirements.
83-09 2/8/83 A written response is not required for this Generic Letter as it is applicable to Combustion Engineering PWRs only.
83-11 2/8/83 LILCO's Nuclear Engineering Department Procedure 5.04 " Computer Program Docu-mentation and Verification," approved and issued by the Manager, Nuclear Engineering Department provides for computer code verification instructions as required by this generic letter.
/
GenericlLetter Date of No.
Issuance Disposition
' 83-12 2/24/83-In conformance *.iith the requirements of this Generic Letter, the Shoreham Training Department will utilize NRC Form 398 for Operator License applications for licenses and renewals. 13 3/2/83 Surveillance requirements for HEPA filters and Charcoal Adsorbers as required by this generic letter are currently covered in Sections 4.6.5.3 and 4.7.2 of the draft Shoreham Technical Specifications.
83-14 3/7/83 A written response to this generic letter is not specifically required.
The LILCO Maintenance Department has reviewed this generic letter and will use the stated definition of key maintenance personnel when implementing the NRC policy on working hours for personnel performing maintenance functions at the Plant.
83-15 3/23/83 A written response to this generic letter is not required.
Preservice inspec' ion (PSI) of Shoreham's RPV c
predated Reg. Guide 1.150.
Guidance contained in Reg. Guide 1.150 has been used in the development of Shoreham's ISI program.
83-16 3/24/84 In accordance with the requirements of this generic letter, NUREG 0977 on the i
ATWS events at Salem Generating Station was studied in a Special Project of the l
Shoreham Independent Safety Engineering Group (ISEG).
On April 19, 1983, ISEG's report of the Special Project concerning NUREG 0977 was transmitted to the Plant Manager for distribution to operations personnel and for use by responsible training personnel.
The Salem ATWS events are discussed in Shoreham'n Operator Training Program.
83-17 4/8/84 The concerns of this generic letter on Integrity of Requalification Examina-tions for Reactor Operator and Senior Reactor Operator Licenses are well addressed under Shoreham Procedure S.P.
12.014.07, Rev. 1.
4 t
L.
g j,..;. E.:,.
m-Generic Letterl
~ Date of "No.
' Issuance Disposition l
.83-18.
'4/19/83 This issue has been addressed as follows:
o SNRC-863 of April 1.,:1983, 4
committed to~a. draft Detailed Control Room' Design. Review (DCRDR)
[
o SNRC-938 of' July-20, 1983, y
submitted a preliminary DCRDR program plan.
o SNRC-966 of September 16, 1983, in response to this generic letter, i
further' amplifies the preliminary, DCRDR program plan.
L 83-19' 5/2/83' A written response is not required to this generic letter on new procedures covering public notice concerning issuance of license amendments.
l 83-20 5/2/83 A written response is not required.
LILCO has a task force for preparation of a program to schedule implementation of future plant modifications.
83 5/11/83 The concerns of this generic letter are addressed in Shoreham procedure S.P.
l 92.001.02, Step 8.3.2.1 which permits l
police officers to carry weapons on site.
83-22 6/3/83 This generic letter applies to PWR Licensees only.
83-24 6/29/83 Response to this generic letter is contained in SNRC-1014 of February 16, 1984, with attachments and references 83-26 7/5/83 A written response is not required.
SNPS Draft Technical Specifications have incorporated the requirements of this generic letter.
l 83-27 7/6/83 A written response is not required.
l Information contained in-this generic letter concerning surveillance intervals-as reflected in Standard Technical Specifications has been disseminated to Plant Staff; i
,s -
Generic Letter Date of No.
Issuance Disposition 83-28 7/8/83 SNRC-960 of September 9, 1983 requests extension to allow incorporation of BWROG's efforts together with Shorehams assessment with respect to NRC proposed actions resulting from the Salem ~ event.
SNRC-1013 of March 9, 1984' transmitted LILCO's report in response to this generic letter.
83-30 7/11/83 A written response is not required.
The revisions required by this generic letter have been incorporated in the draft Shoreham Standard Technical Specifications.
83-31 9/19/83 A written response to this generic letter is not required as it'is applicable to Babcock & Wilcox PWR's only.
83-32 12/2/83 A written response is not required.
The Staff position expressed in this generic letter and attachment is reflected in the relevant Shoreham Emergency Operating Procedures.
83-33 10/19/83 A written response to this generic letter is not required.
The contents of this generic letter are under review by LILCO.
83-35 11/2/83 A written response is not required.
Shorehams FSAR, Chapter 6 demonstrates compliance with NUREG-0737, Items II.K.3.30 and II.K.3.31 as outlined in this generic letter and subsequent NRC letter (D. G. Eisenhut to R. M. Buchholz (GE) December 13, 1984) on the subject.
83-36 11/2/83 All NUREG-0737 items have been incorpo-rated as appropriate in the draft Shoreham Technical Specifications with the exception of Item III.D.3.4,
" Control Room Habitability," which has been drafted and is undergoing internal review.
83-37 11/1/83 A written response is not required.
This generic letter applies to PWR l,
Licensees only.
7.
s gi LGeneric Letter Date of No.
Issuance Disposition 83-40 12/21/83 SNRC-1006 of January 16, 1984 transmitted LILCO's estimates of need for operator. licensing examinations as requested by this generic letter.-
83-41 12/16/83 This generic letter requires reply from licensees of operating reactors only.
83-42 12/19/83 A written response is not required required.
The potential problem related to single failure with respect to cranes
.is being evaluated and will be factored o
into Shoreham's control of heavy loads.
83 12/19/83 The changes in reporting requirements reflected in this generic letter will be incorporated by the NRC in the draft l
Shoreham Technical Specifications for the Shoreham plant.
83-44 12/20/83 A written response is not required.
l-This generic letter was for information l
concerning the availability of l
This NUREG has been circulated to cognizant personnel.