Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20096E958 + (12:56:09, 13 December 2024)
- ML20096E955 + (12:56:10, 13 December 2024)
- ML20096E946 + (12:56:11, 13 December 2024)
- ML20096E953 + (12:56:11, 13 December 2024)
- ML20096E945 + (12:56:12, 13 December 2024)
- ML20096E944 + (12:56:13, 13 December 2024)
- ML20096E941 + (12:56:14, 13 December 2024)
- ML20096E938 + (12:56:15, 13 December 2024)
- RC-96-0014, Requests NRC Review & Approval of RB Tendon Force Predictions for Upcoming Fifth Period RB Tendon Surveillance.Calculations Generated for Fifth Period Surveillance Tendon Force Predictions Encl + (12:56:15, 13 December 2024)
- ML20096E933 + (12:56:16, 13 December 2024)
- ML20096E931 + (12:56:18, 13 December 2024)
- ML20096E930 + (12:56:19, 13 December 2024)
- ML20096E927 + (12:56:21, 13 December 2024)
- ML20096E924 + (12:56:22, 13 December 2024)
- ML20096E921 + (12:56:23, 13 December 2024)
- ML20096E912 + (12:56:23, 13 December 2024)
- RBG-42340, Special Rept:On 951204,Division I H Analyzer Discharge Piping Containment Penetration Check Valve Failed,Causing Containment Penetration to Be Isolated Rendering H Analyzer Inoperable + (12:56:24, 13 December 2024)
- ML20096E910 + (12:56:25, 13 December 2024)
- ST-HL-AE-5277, Monthly Operating Repts for Dec 1995 for South Texas Project + (12:56:26, 13 December 2024)
- B15500, Provides Update on Current Activities in Progress to Resolve Issues W/Spent Resin Tank Remediation + (12:56:27, 13 December 2024)
- ML20096E892 + (12:56:27, 13 December 2024)
- ML20096E882 + (12:56:29, 13 December 2024)
- ML20096E861 + (12:56:44, 13 December 2024)
- ML20096E864 + (12:56:44, 13 December 2024)
- ML20096E860 + (12:56:45, 13 December 2024)
- ML20096E845 + (12:56:46, 13 December 2024)
- ML20096E836 + (12:56:47, 13 December 2024)
- TAC:M82221 + (12:56:47, 13 December 2024)
- ML20096E834 + (12:56:54, 13 December 2024)
- ML20096E817 + (12:56:55, 13 December 2024)
- ML20096E822 + (12:56:55, 13 December 2024)
- ML20096E815 + (12:56:56, 13 December 2024)
- ML20096E811 + (12:56:56, 13 December 2024)
- ML20096E807 + (12:56:57, 13 December 2024)
- ML20096E794 + (12:56:58, 13 December 2024)
- ML20096E786 + (12:56:59, 13 December 2024)
- TAC:M81016 + (12:56:59, 13 December 2024)
- ST-HL-AE-4082, Forwards WCAP-13182, Analysis of Capsule V from Hl&P Co South Texas Unit 2 Reactor Vessel Radiation Surveillance Program & WCAP-13251, Evaluation of PTS for South Texas Unit 2, 10CFR50,App H + (12:57:00, 13 December 2024)
- ML20096E773 + (12:57:02, 13 December 2024)
- ML20096E769 + (12:57:02, 13 December 2024)
- 05000327/LER-1995-018, :on 951218,inoperability of C Dioxide Sys for Computer Room Resulted from Inadequate Design Change. Established Fire Watch + (12:57:04, 13 December 2024)
- 05000354/LER-1992-005-02, :on 920415,control Room Ventilation Isolation & Emergency Filter Started Resulting in ESF Actuation.Caused by Inadequate self-checking by Technician.Technician Counseled & Event Reviewed During Training + (12:57:06, 13 December 2024)
- B15504, Notifies NRC Re Current Status of RA Cox,Noting That Cox Had Not Completed 1995 Annual Operating Test in Accordance W/ Licensed Operator Requalification Program Because of Corrective Surgery During Last Quarter of 1995 + (12:57:08, 13 December 2024)
- 05000354/LER-1995-040, :on 951218,EDG B Inadvertently Started Due to Improper Removal from Svc.Caused by Lack of Questioning Attitude by Operations Personnel.Addressed Communications Issues & Made Procedural Revs + (12:57:10, 13 December 2024)
- ML20096E742 + (12:57:11, 13 December 2024)
- BSEP-96-0008, Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant + (12:57:12, 13 December 2024)
- ML20096E738 + (12:57:12, 13 December 2024)
- ML20096E724 + (12:57:13, 13 December 2024)
- ML20096E720 + (12:57:14, 13 December 2024)
- ML20096E721 + (12:57:14, 13 December 2024)
- 1CAN059203, Forwards Monthly Operating Rept for Apr 1992 for ANO Unit 1 & Revised Monthly Operating Rept for Mar 1992,consisting of Unit Shutdowns & Power Reductions Data + (12:57:15, 13 December 2024)
- 3F0592-02, Forwards Proposed Change to QA Program Description,Fsar Section 1.7 Re Frequency of Procedure Review.Qa Program Commitment Will Be Reduced to Comply W/Reg Guide 1.33,Rev 2 + (12:57:29, 13 December 2024)