Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000413/LER-1985-019, :on 850307,during Performance of Analog Channel Operational Test,Steam Generator C Level Channel 4 Found Inoperable.Caused by Personnel Error.Circuit Card Replaced + (10:38:21, 13 December 2024)
- ML20100K871 + (10:38:23, 13 December 2024)
- 05000254/LER-1985-005-07, :on 850306,at 100% Thermal Power Operation, Fuel Pool Radiation Monitor 1A Failed Downscale.On 850307, Monitors 1B & 1A Spiked High.Probably Caused by Electrical Noise Interference.Mod Issued + (10:38:24, 13 December 2024)
- JAFP-96-0075, Forwards Rev 4 to Security Contingency Plan.Rev Withheld,Per 10CFR73.21 + (10:38:25, 13 December 2024)
- ML20100K863 + (10:38:26, 13 December 2024)
- JAFP-96-0074, Forwards Rev 17 to Security Plan.Changes Do Not Decrease Safeguards Effectiveness of Plan.Rev Withheld,Per 10CFR73.21 & 2.790(d)(1) + (10:38:27, 13 December 2024)
- ML20100K854 + (10:38:28, 13 December 2024)
- ML20100K847 + (10:38:28, 13 December 2024)
- ML20100K844 + (10:38:29, 13 December 2024)
- ML20100K835 + (10:38:30, 13 December 2024)
- ML20100K834 + (10:38:31, 13 December 2024)
- ML20100K827 + (10:38:31, 13 December 2024)
- ML20100K826 + (10:38:32, 13 December 2024)
- ML20100K814 + (10:38:33, 13 December 2024)
- ML20100K813 + (10:38:34, 13 December 2024)
- 05000413/LER-1985-018, :on 850307,Train a Diesel Generator & Turbine Driven Auxiliary Feedwater Pump Concurrently Inoperable. Caused by Personnel Error Placing Batteries on Equalize Charge.Batteries Returned to Svc + (10:38:35, 13 December 2024)
- ML20100K803 + (10:38:37, 13 December 2024)
- ML20100K800 + (10:38:38, 13 December 2024)
- ML20100K799 + (10:38:39, 13 December 2024)
- ML20100K792 + (10:38:40, 13 December 2024)
- ML20100K791 + (10:38:40, 13 December 2024)
- 05000220/LER-1985-004, :on 850304,during Shutdown,Turbine Trip Signal Led to HPCI Initiation.Caused by High Reactor Water Level.Level Control Adjusted.Water Level Returned to Normal + (10:38:42, 13 December 2024)
- ML20100K787 + (10:38:44, 13 December 2024)
- ML20100K782 + (10:38:45, 13 December 2024)
- ML20100K777 + (10:38:45, 13 December 2024)
- BSEP-85-0402, Responds to NRC Re Violations Noted in Insp Repts 50-324/84-35 & 50-325/84-35.Corrective Actions:Main Steam Lines Drained & Inspected for Damage.Procedure OP-32 Revised to Include Drain Valves to Allow Complete Draining + (10:38:46, 13 December 2024)
- ML20100K774 + (10:38:47, 13 December 2024)
- ML20100K770 + (10:38:47, 13 December 2024)
- ML20100K768 + (10:38:48, 13 December 2024)
- 05000244/LER-1985-003, :on 850309,cable Tunnel Smoke Detection Sys Auto Deluge Inadvertently Removed from Svc.Caused by Personnel Error of Misreading Zone to Be Deactivated. Procedure Reviewed + (10:38:52, 13 December 2024)
- ML20100K763 + (10:38:54, 13 December 2024)
- 05000289/LER-1984-003, :on 840702,fire Area Identified W/O Fire Barrier Penetration Seals.Caused by Inadequate Supervision of Workers Installing Seals.Procedure Revised + (10:38:56, 13 December 2024)
- ML20100K748 + (10:38:59, 13 December 2024)
- BSEP-85-0386, Special Rept 2-SR-85-2:on 850206,fire Barrier Established for Fire Door 201.Caused by Routing Temporary Fire Suppression Supply Through Open Door to Provide Alternate Suppression for Stations 2-CB-1 & 2-CB-2 + (10:39:00, 13 December 2024)
- ML20100K740 + (10:39:00, 13 December 2024)
- ML20100K737 + (10:39:01, 13 December 2024)
- L-85-140, Special Rept:On 850322,main Steam Safety Valve Radiation Monitor Declared Inoperable.Caused by Inoperable Gm Tube Detector or Gm Tube Electronic Interface Due to Collected Condensation.Components Replaced.Monitor Returned to Svc + (10:39:02, 13 December 2024)
- 3F1284-06, Forwards to EPA Transmitting Fifth Quarterly Progress Rept for Crystal River 316 Study + (10:39:03, 13 December 2024)
- ML20100K730 + (10:39:04, 13 December 2024)
- ML20100K728 + (10:39:04, 13 December 2024)
- ML20100K727 + (10:39:05, 13 December 2024)
- 05000237/LER-1985-012-02, :on 850309,full Scram Occurred During Reactor Protection Sys Operating Procedure.Caused by Misaligned Styrofoam Block.Relay Calibr Procedures Revised to Require Physical Jumper on Contact + (10:39:07, 13 December 2024)
- ML20100K717 + (10:39:08, 13 December 2024)
- ML20100K710 + (10:39:09, 13 December 2024)
- ML20100K708 + (10:39:10, 13 December 2024)
- 3F0285-16, Annual Operating Rept,1984 + (10:39:10, 13 December 2024)
- 05000237/LER-1985-011-03, :on 850306,reactor Vessel Not Vented at Less than 149 F.Caused by Lack of Procedural Steps to Ensure Vent Path Exists Prior to Completion of Head Vent Piping Replacement.Procedures Changed + (10:39:12, 13 December 2024)
- ML20100K699 + (10:39:13, 13 December 2024)
- ML20100K690 + (10:39:14, 13 December 2024)
- ML20100K698 + (10:39:14, 13 December 2024)
- 05000247/LER-1985-004, :on 850306,reactor Trip Occurred.Caused by Improperly Functioning Feedwater Regulating Valve.Relays in Instrumentation Sys for Feedwater Regulating Valves Replaced + (10:39:17, 13 December 2024)