ML20100K814
| ML20100K814 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 11/30/1984 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| ANPP-31259-TDS, DER-84-74, NUDOCS 8412110295 | |
| Download: ML20100K814 (2) | |
Text
50-52g itEC tion.
Arizona Nuclear Power Project UM CEC 33 /3 3 2g P O. box 52034 e PHOENIX. ARIZONA 85072-2M4 "EG:Cir.> ; g November 30, 1984 ANPP-31259-TDS/TRB U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects Time Extension For Report - DER 84-74
Subject:
A 50.55(e) Potentially Reportable Deficiency Relating To Class 1E Inverters Supplied By Elgar.
File: 84-019-026; D.4.33.2 (A) Telephone conversation between C. Sorenson and T. Bradish
Reference:
on September 28, 1984 (B) ANPP-31008, dated October 29, 1984 (Interim Report)
(C) ANPP-31152, dated November 15, 1984 (Time Extension)
Dear Sir:
The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by November 30, 1984.
'Due to the extensive investigation and evaluation required, it is now 11, 1984, at expected that this information will be finalized by December which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly yours, fF. log E. E. Van Brunt, Jr.
APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two 8412110295 841130 PDR ADOCK 05000528 PDR S
t 0 TE-17
c::
~
/
-Mr. D. F. Kirsch, DER 84-74
.Page Two-Richard'DeYoung, Director cc:.
Office of Inspection and. Enforcement U. S. Nuclear Regulatory' Commission Washington,'D.
C.-
20555 T.b. Woods,Jr.
D. B. Karner-
.- W. E. Ide' D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D.-Shriver C. N.~ Russo B. S. Kaplan J. R._:Bynum
- 3. M. Allen
- A. C.'Gehr
- W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster.
D. R. Hawkinson R.. P. Zimmerman lL. Clyde M. Matt T.- J. Bloom Records Center.
Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA' 30339 I
%