Interim Deficiency Rept DER 84-54 Re Containment Sump Isolation Valve.Initially Reported on 840817.Due to Extensive Investigation & Evaluation,Final Rept Delayed Until 841211
ML20100K710
Person / Time
Site: Palo Verde  
Issue date: 11/30/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-31263-TDS, DER-84-54, NUDOCS 8412110255
Download: ML20100K710 (2)


Text

< ^j y,.,

A 3ECEIVED t:T.C Arizona Nuclear Power Project IE4 DEC 33 !Ji 0 29 P.O. box 52034 e PHOENIX, Am2ONA 85072-2034 TGCNV4F November 30, 1984 ANPP-31263-TDS/TRB U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects

Subject:

Time Extension For Report - DER 84-54 A 50.55(e) Potentially Reportable Deficiency Relating To Containment Sump Isolation Valve.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and T. Bradish on August 17, 1984 (B) ANPP-30543, dated September 17, 1984 (Interim Report)

(C) ANPP-30871, dated October 17, 1984 (Time Extension)

(D) ANPP-31000, dated October 30, 1984 (Time Extension)

(E) ANPP-31153, dated November 15, 1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B),

and Time Extensions were requested by References (C), (D), and (E). At that time, it was estimated that a Final Report would be available by November 30, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by December 11, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, 2.z. % % & /ggi c E. E. Van Brunt, Jr.

h2[h5

((b APS Vice President 0

Nuclear Production S

PDR ANPP Project Director EEVB/TRB/nj cc: See Page Two 0

Zh?

i*E,-

tg 1

~ Mr. D. F. Kirsch DER 84-54 Page Two'

.- cc :

. Richard DeYoung, Director Office of-Inspection and Enforcement i '

- U. S.-Nuclear Regulatory Commission Washington, D. C.

20555

~ T. G. Woods,'Jr.

D. B. Karner W.'E.

Ide D. B. Fasnacht

' A. C. Rogers i:

L. A. Souza s

D. E. Fowler T. D.. Shriver-p C. N. Russo-B. S. Kaplan J. R. Bynum J.' M. Allen-A. C. Gehr W..J.

Stubblefield W. G. Bingham R. L. Patterson R.

W.~ Welcher H. D. Foster =

D. R. Hawkinson R. P. Zimmerman L.' Clyde:

M. Matt-T. J. Bloom Records Center Institute of Nuclear Power Operations

-1100 Circle 75 Parkway, Suite 1500

,l' Atlanta,-GA" 30339 i.

i.:

a r-I t

1

-r r

. w r.#,

<4.

-m..

,,,.w.,

--,..w..--

-,..,,,.--m.-...,-,~-.w..,

,,,w...,--4,

..-w,.4 iw...-

--.--%.e-

,'.-.-~m-,'

-