List of results
- ML20101B509 + (10:12:53, 13 December 2024)
- ML20101B502 + (10:12:54, 13 December 2024)
- ML20101B501 + (10:12:55, 13 December 2024)
- ML20101B497 + (10:12:56, 13 December 2024)
- ML20101B500 + (10:12:56, 13 December 2024)
- ML20101B493 + (10:12:57, 13 December 2024)
- ML20101B479 + (10:12:58, 13 December 2024)
- 05000321/LER-1984-027-01, :on 841117,diesel Generator 1B Declared Inoperable Because Lube Oil Temp Dropped Below 105 F,Causing Three Diesel Generators to Be Inoperable Simultaneously.W/ + (10:13:00, 13 December 2024)
- 05000321/LER-1984-012-01, :on 841114 & 20,reactor Protective Sys Logic Actuations Occurred for No Apparent Reason.Further Investigation Revealed No Cause + (10:13:03, 13 December 2024)
- ML20101B469 + (10:13:04, 13 December 2024)
- 05000483/LER-1984-060, :on 841114,high Steam Generator Level Caused Reactor Trip,Feedwater Isolation,Auxiliary Feedwater Actuation & Steam Generator Blowdown Isolation + (10:13:07, 13 December 2024)
- 05000454/LER-1984-009-08, :on 841116,auxiliary Bldg Vent Stack Monitor 1RE-PR028 Tripped Due to Filter Loading.Particulate Filter & Iodine Cartridge Not Analyzed within 48 H Because of Lack of Instructions from Lab Foreman to Technician + (10:13:13, 13 December 2024)
- ML20101B445 + (10:13:19, 13 December 2024)
- ML20101B438 + (10:13:20, 13 December 2024)
- 05000261/LER-1984-003-01, :on 840521,two Steam Generator Snubbers Being Tested Offsite Were Low on Fluid.Rear Monoball Bearing on One Steam Generator Snubber Failed at Less than Design Load. All Snubbers Rebuilt + (10:13:23, 13 December 2024)
- ML20101B424 + (10:13:24, 13 December 2024)
- ML20101B422 + (10:13:25, 13 December 2024)
- ML20101B416 + (10:13:26, 13 December 2024)
- HL-2229, Responds to NRC Re Violations Noted in Insp Repts 50-321/92-08 & 50-366/92-08.Corrective Actions:Design Change Request 92-075 Implemented to Install Jumpers Around Thermal Overload Devices of 12 Unit 1 motor-operated Valves + (10:13:29, 13 December 2024)
- ML20101B403 + (10:13:30, 13 December 2024)
- HL-2204, Submits Proposed Schedule for Addressing Items in App a of Se, ,of Second 10-yr Insp Insp Interval,Per 920416 Telcon W/Nrc.Response/Revised Relief Request for Table 1 & 2 Items Will Be Submitted by 920605 + (10:13:31, 13 December 2024)
- ML20101B395 + (10:13:32, 13 December 2024)
- 1CAN128403, Forwards Info Re Insp Techniques to Be Employed for Exam of 10 Sleeved once-through Steam Generator Tubes,Per 841010 Commitment + (10:13:33, 13 December 2024)
- 05000219/LER-1984-027, :on 841103,during Startup,Standby Liquid Control Sys Vol/Concentration Below Tech Spec Min Limit. Caused by Personnel Error & Improper Procedures.Chemicals Added & Procedures Will Be Improved + (10:13:36, 13 December 2024)
- ML20101B381 + (10:13:37, 13 December 2024)
- ML20101B375 + (10:13:41, 13 December 2024)
- ML20101B369 + (10:13:42, 13 December 2024)
- ML20101B355 + (10:13:43, 13 December 2024)
- ML20101B346 + (10:13:44, 13 December 2024)
- 05000440/LER-1992-011, :on 920503,two IRM Channels Became Inoperable Due to Failure to Complete TS 3.3.1 Surveillance Requirements.Caused by Personnel Error.Plant Licensed Operators Will Be Instructed on Lessons Learned + (10:13:46, 13 December 2024)
- 05000440/LER-1992-010, :on 920430,inadvertent Outboard Balance of Plant Containment Isolation Occurred.Caused by Inadequate Work Order.Personnel Assisted in Investigation & Have Been Made Aware of Errors + (10:13:48, 13 December 2024)
- PY-CEI-NRR-1505, Forwards Licensee Event Repts 92-010 & 92-011 for Perry Nuclear Power Plant + (10:13:49, 13 December 2024)
- ML20101B331 + (10:13:51, 13 December 2024)
- 05000413/LER-1984-020-02, :on 841112,0928 & 1020,Mode 4 Entered W/ Unacceptable Test Results on Certain Fuses Associated W/ Containment Electrical Penetrations.Caused by Personnel Error + (10:13:53, 13 December 2024)
- 05000219/LER-1992-004, :on 920424,discovered That Testing Methodology for Flow Converter Units for RPS Resulted in Loss of High Recirculation Flow Scram Protection.Caused by Procedural Inadequacy.Surveillance Procedure Revised + (10:13:57, 13 December 2024)
- 05000302/LER-1992-004, :on 920428,emergency Feedwater Block Valves Failed to Close During Differential Pressure Testing.Caused by Normal Valve Wear & Inadequate Motor Operator Capabilities.Cable Combinations Modified + (10:14:01, 13 December 2024)
- ML20101B313 + (10:14:03, 13 December 2024)
- ML20101B305 + (10:14:03, 13 December 2024)
- ML20101B303 + (10:14:04, 13 December 2024)
- SNRC-1123, Forwards Executed Amend 1 to Indemnity Agreement B-87 + (10:14:05, 13 December 2024)
- 05000259/LER-1992-002-05, :on 920324,reactor Protection Sys Experienced Unexpected Failure,Causing Actuation of Esf.Cause Not Determined.Bus 1B Placed on Alternative Power,Alarms Reset & ESF Actions Returned to Normal + (10:14:09, 13 December 2024)
- ML20101B293 + (10:14:11, 13 December 2024)
- 3F0396-08, Submits ISI Program Relief Request 95-030,Suppl 2,revising Response to RAI Re Reactor Vessel Stress in Structural Integrity Rept SIR-95-135 + (10:14:12, 13 December 2024)
- ML20101B289 + (10:14:13, 13 December 2024)
- ML20101B288 + (10:14:14, 13 December 2024)
- ML20101B285 + (10:14:15, 13 December 2024)
- 05000327/LER-1992-011, :on 920429,unit Experienced Safety Injection Signal While Preparing for Reactor start-up.Caused by Failure in steam-dump Control Circuitry.Equipment That Caused Actuation of steam-dump Valves Replaced + (10:14:17, 13 December 2024)
- 05000266/LER-1992-003-01, :on 920428,EDG G01 Automatically Started When Potential Transformer for Supplied Bus Deenergized.Caused by Personnel Error.Addl Loads on Bus 1B04 Secured & Isolated & Buses 1B03 & 1B04 Reenergized + (10:14:19, 13 December 2024)
- ML20101B277 + (10:14:21, 13 December 2024)
- 05000425/LER-1992-009-01, :on 920507, a MFP Was Tripped & Out of Svc While Being Filled & Vented.Caused by Failure to Maintain MFP Lube Oil Temp.Procedures 14992-1 & 2 Will Be Enhanced by 920630 + (10:14:23, 13 December 2024)
- ML20101B271 + (10:14:24, 13 December 2024)