Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101Q142 + (09:14:00, 13 December 2024)
- RBG-19706, Forwards Summarization of Sys Component Evaluation Work Sheets Submitted on 841019 to Assist Equipment Qualification Branch Review of balance-of-plant & NSSS Electrical Equipment Located in Harsh Environ + (09:14:26, 13 December 2024)
- W3P85-0025, Submits Addl Info on Basemat Hairline Cracks at Facility. Cracks Documented on 771013,821123 & 820323 Not Absolutely Identified W/Cracks on 1983 Map.Repairs Neither Structurally Significant Nor Pertinent to Basemat Evaluation + (09:14:39, 13 December 2024)
- ML20101Q095 + (09:14:46, 13 December 2024)
- ML20101Q087 + (09:14:59, 13 December 2024)
- ML20101Q086 + (09:15:00, 13 December 2024)
- ML20101Q082 + (09:15:00, 13 December 2024)
- ML20101Q058 + (09:15:02, 13 December 2024)
- ML20101Q048 + (09:15:09, 13 December 2024)
- ML20101Q036 + (09:15:22, 13 December 2024)
- ML20101Q031 + (09:15:23, 13 December 2024)
- ML20101Q029 + (09:15:23, 13 December 2024)
- ML20101Q027 + (09:15:24, 13 December 2024)
- ML20101Q013 + (09:15:33, 13 December 2024)
- ML20101Q012 + (09:15:34, 13 December 2024)
- ML20101Q006 + (09:15:34, 13 December 2024)
- ML20101Q004 + (09:15:35, 13 December 2024)
- ML20101P995 + (09:15:40, 13 December 2024)
- ML20101P992 + (09:15:40, 13 December 2024)
- 3F0185-01, Forwards Conceptual Design to Control Complex Dedicated HVAC Cooling Sys for Safe Shutdown Panel,Power Supply & Switchgear,Per 10CFR50 App R,In Response to 830106 Request + (09:16:00, 13 December 2024)
- ML20101P987 + (09:16:02, 13 December 2024)
- ML20101P985 + (09:16:03, 13 December 2024)
- ML20101P980 + (09:16:04, 13 December 2024)
- ML20101P979 + (09:16:04, 13 December 2024)
- ML20101P973 + (09:16:05, 13 December 2024)
- ML20101P944 + (09:16:07, 13 December 2024)
- ST-HL-AE-4267, Forwards Suppl Response to Initial SALP Rept.Informs That Company Determined to Apply Mgt Attention & Resources Required to Reverse Causes of Declining Performance Noted in Rept + (09:16:08, 13 December 2024)
- ML20101P936 + (09:16:08, 13 December 2024)
- ML20101P932 + (09:16:09, 13 December 2024)
- ML20101P922 + (09:16:10, 13 December 2024)
- RBG-42677, Responds to Violations Noted in Insp Rept 50-458/96-06 on 960126-0202.Corrective Actions:During Future outages,186 Elevation of Refueling Floor Will Be Posted as Airborne Radioactivity Area Prior to Movement of Rv Internals + (09:16:10, 13 December 2024)
- ML20101P909 + (09:16:11, 13 December 2024)
- 05000219/LER-1992-007, :on 920610,reactor Scram Occurred During Reactor Startup.Caused by Failed Bypass Switch.Plant Placed in Cold Shutdown Condition & Both Bypass Switches Replaced + (09:16:13, 13 December 2024)
- ML20101P901 + (09:16:14, 13 December 2024)
- ML20101P899 + (09:16:14, 13 December 2024)
- ML20101P898 + (09:16:18, 13 December 2024)
- ML20101P893 + (09:16:21, 13 December 2024)
- RBG-37-110, Forwards Response to Rev 1 to Generic Ltr 92-01, Reactor Vessel Structural Integrity, Per 10CFR50.60 & 10CFR50.61 & Commitments Made in Response to Generic Ltr 88-11 + (09:16:22, 13 December 2024)
- ML20101P883 + (09:16:23, 13 December 2024)
- JAFP-92-0522, Final SPDES Annual Biological Monitoring Rept Ja FitzPatrick Nuclear Power Plant 1991 + (09:16:24, 13 December 2024)
- ML20101P871 + (09:16:26, 13 December 2024)
- 05000254/LER-1989-014, :on 890910,determined That Measured,Combined Leakage Rate from All Penetrations & Valves,Excluding Misvs, Exceeded TS Limits.On 890911,MSIV Leaked in Excess of Ts. Valve Seating Surfaces Machined & Lapped + (09:16:28, 13 December 2024)
- ML20101P869 + (09:16:29, 13 December 2024)
- ML20101P867 + (09:16:30, 13 December 2024)
- ML20101P866 + (09:16:30, 13 December 2024)
- ML20101P855 + (09:16:33, 13 December 2024)
- ML20101P853 + (09:16:34, 13 December 2024)
- ML20101P852 + (09:16:35, 13 December 2024)
- ML20101P842 + (09:16:36, 13 December 2024)
- ML20101P841 + (09:16:37, 13 December 2024)
- ST-HL-AE-5325, Forwards Response to Violations Noted in Insp Repts 50-498/96-12 & 50-499/96-12.Corrective Actions:Written Guidance on Mgt Expectations Re EOP Compliance Issued on 951220,prior to Reactor Startup + (09:16:38, 13 December 2024)