Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000361/LER-1985-001, :on 850103,during Routine Fire Watches in Electrical Tunnel,Security Officers Did Not Respond Properly to Allow Entry.Caused by Failure of Personnel to Implement Revised Access Routing of Firewatch + (08:52:20, 13 December 2024)
- ML20101U805 + (08:52:21, 13 December 2024)
- ML20101U800 + (08:52:22, 13 December 2024)
- 05000454/LER-1985-003-01, :on 850111 & 12,reserve Offsite Transmission Circuits Unavailable & Periodic Surveillance of Remaining Circuits Not Performed.Caused by Personnel Error + (08:52:24, 13 December 2024)
- ML20101U792 + (08:52:26, 13 December 2024)
- ML20101U774 + (08:52:27, 13 December 2024)
- ML20101U763 + (08:52:28, 13 December 2024)
- ML20101U762 + (08:52:28, 13 December 2024)
- RBG-20046, Forwards Response to NRC 841105 Request for Addl Info on Initial Test Program.Response Also Addresses SER Confirmatory Item 61 Re Program Revs & Generic Ltr 83-24 + (08:52:29, 13 December 2024)
- RBG-20025, Forwards Final Response to SER Confirmatory Item 18 Re Containment Purge Valves.Response Addresses Staff Position 6 Re Operation of Drywell Purge Sys.Encl Revised FSAR Pages Will Be Incorporated Into Next Amend + (08:52:30, 13 December 2024)
- ML20101U711 + (08:52:31, 13 December 2024)
- ML20101U682 + (08:52:32, 13 December 2024)
- ML20101U672 + (08:52:36, 13 December 2024)
- ML20101U671 + (08:52:37, 13 December 2024)
- ML20101U669 + (08:52:38, 13 December 2024)
- 05000353/LER-1992-007-02, :on 920624,discovered That Main Control Room Operator Failed to Return Reactor Encl Isolation Valves a & B Reset Switches Back to as-found Auto Position.Caused by Design Deficiency.Alarm Annunciation Installed + (08:52:41, 13 December 2024)
- 05000352/LER-1992-013, :on 920624,determined That RHR HX Failed Heat Transfer Capacity Test,Per Generic Ltr 89-13.Caused by HX Fouling & Leaking RHR HX 1B Bypass Valve.Restricting Orifice Removed to Allow Increased Flow + (08:52:45, 13 December 2024)
- ML20101U661 + (08:52:47, 13 December 2024)
- 05000353/LER-1992-005, :on 920605,EDG D21 Inadvertently Started During Performance of Shutdown of DG Operating Procedure.Caused by Personnel Error.Operator Counseled,Operator Aid Applied to Manual Air Start Valves & Chapter Revised + (08:52:49, 13 December 2024)
- ML20101U648 + (08:52:50, 13 December 2024)
- BVY-92-084, Responds to NRC Request for Addl Info Re Rept Made by Vynp on 920625 of NRC-licensed Operator Who Tested Positive Following fitness-for-duty Test.Response Withheld (Ref 10CFR2.790) + (08:52:51, 13 December 2024)
- ML20101U635 + (08:52:52, 13 December 2024)
- ML20101U599 + (08:52:53, 13 December 2024)
- ML20101U584 + (08:52:55, 13 December 2024)
- ML20101U564 + (08:52:56, 13 December 2024)
- ML20101U559 + (08:52:57, 13 December 2024)
- ML20101U556 + (08:52:58, 13 December 2024)
- ML20101U554 + (08:52:58, 13 December 2024)
- RBG-19993, Final Deficiency Rept DR-276 Re Potential Failure of RCIC Condensate Storage Tank Suction Line Isolation Valve. Initially Reported on 841226.HPCS Check Valve Relocated Upstream of Tank Takeoff + (08:52:59, 13 December 2024)
- ML20101U509 + (08:53:01, 13 December 2024)
- ML20101U508 + (08:53:02, 13 December 2024)
- ML20101U485 + (08:53:03, 13 December 2024)
- ML20101U479 + (08:53:03, 13 December 2024)
- ML20101U475 + (08:53:04, 13 December 2024)
- ML20101U465 + (08:53:05, 13 December 2024)
- ML20101U463 + (08:53:06, 13 December 2024)
- 05000339/LER-1992-015, :on 920621,hi Hydrogen Main Control Room Annunicator for Containment Analyzer Discovered Inoperable & Local Panel Incorrectly Wired.Caused by Personnel Error. Relay Correctly Wired & Test Results Verified + (08:53:08, 13 December 2024)
- ML20101U429 + (08:53:10, 13 December 2024)
- ML20101U435 + (08:53:10, 13 December 2024)
- ML20101U419 + (08:53:11, 13 December 2024)
- ML20101U415 + (08:53:12, 13 December 2024)
- ML20101U414 + (08:53:14, 13 December 2024)
- ML20101U409 + (08:53:16, 13 December 2024)
- ML20101U411 + (08:53:16, 13 December 2024)
- ML20101U398 + (08:53:17, 13 December 2024)
- ML20101U395 + (08:53:18, 13 December 2024)
- ML20101U366 + (08:53:20, 13 December 2024)
- ML20101U376 + (08:53:20, 13 December 2024)
- ML20101U362 + (08:53:21, 13 December 2024)
- ML20101U361 + (08:53:22, 13 December 2024)
- 05000301/LER-1991-007-01, :on 911110,DHR Requirement Violated During SG Crevice Cleaning.Caused by Inadequate Procedural Guidance. Need to Continue Performing SG Crevice Cleaning Procedure Will Be Assessed + (08:53:26, 13 December 2024)
- ML20101U355 + (08:53:27, 13 December 2024)