Responds to NRC Questions,Transmitted in Re Util Proposal to Install Dedicated Power Source from Conowingo Hydroelectric Power Station to Facility Onsite Distribution Sys & Station Blackout Analysis
ML20101U661
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/17/1992
From: Beck G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9207230164
Download: ML20101U661 (1)


Text

.

PIIILADELi'lilA EI.ECTRIC COMi%NY NUCLEAR OROUP liRADQUARTERS 955 05 CilRSTERilROOli ilLVD.

WAYNE, PA 19087 5691 (215) 64(M000 July 17, 1992 Docket Nos. 50-277 NUClIAR LNotNir. RING & 50RVICES DEPARTMENT 50-278 License Nos. DPR-44 DPR-56 U.

S.

Nuclear Regulatory Commission Attn Document Control Desk Washington, DC 20555 Subjects Peach Bottom Atomic Power Station, Units 2 and 3 Response to Questions on Conowingo Feeder and Station Blackout

Reference:

Letter from C. L. Mi ler (NRC) to D. M. Smith (PEco) dated June _23, 1992 Dear Sirt o

On May 15,_1992, Philadelphia Electric Company (PECo) met with the NRC and presented a proposal to install a dedicated power source from the Conowingo !!ydroelectric Power Station to the Peach Bottom Atomic Power Station (PBAPS) onW +e distribution system.

In the above referenced letter, the NRC t:

Sted questions regarding the use of this power sourca as t h altch..

?C -source for the PBAPS, Units 2 and 3 Station alackout analysis, hosponses to these questions were requested by July 24, 1992.

The PECo technical staff responsible for providing answers to the NRC questions has been involved in responding to the July 4, 1992 transformer fire at PBAPS and the subsequent NRC inspection.

Because of these unforeseen events, we are unable to meet the response date requested by the NRC.-

We plan to submit responses to the NRC questions by August 7, 1992.

This revised response date has been discussed with the NRC Project Manager for PBAPS.

We apologize for any inconvenience this delay may cause.

L Sincerely b

,- ;, y j

'j George J.

Beck Manager-Licensing 9207230164 920717 PDR ADOCK 05000277 N

P PDR V

dl

/p V

cca T.-T.

Martin, Administrator, Region I, USNRC J. J. Lyash, USNRC Senior Resident Inspector, PBAPS

...,.