ML20101U475
| ML20101U475 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 07/17/1992 |
| From: | Powers K PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CCN-92-14086, NUDOCS 9207230039 | |
| Download: ML20101U475 (2) | |
Text
CCN 92-14086-PIIILADELPIIIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION R. D.1, Box 208 PM DELTA, PA 17314 C
0 17) 456-7014 July 17, 1992 EN M'ERS PLANT MANAGER U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washingtc,n, DC 20555
SUBJECT:
Permanent Re-assignment of Senior Licensed Operator Pursuant to 10CFR 50.74(a), this is to notify you that effective June 29, 1992, Donald B. Warfel (License # SOP-3851-4) has been permanently reassigned from a position that required a NRC license. We request that this license be terminated.
If you have any questions or require additional information, please do not hesitate to contact us.
Sincerely, k $ 7 Q (,} w g 3 > g'e s -
i>
cc:
R. A. Burricelli, Public Service Electriv & Gas T. M. Gerusky, Commonwealth of Pennsylvania J. J. Lyash, USNRC Senior Resident Inspector T. T. Martin, Administrator, Region I, USNRC H. C. Schwemm Atlantic Electric R. I. McLean, State of Maryland C. D. Schaefer, Delmarva Power A
E?
9PO7230037 920717 (DR ADOCK 0500 1
lQ,
a 7,.
U. 5. Nuclear Regulatory Commission.
Page 2 bcc: D. B. Warfel 638 5,Chesterbrook J. A. Basilio 52A-5, Chesterbrook J. J. Stankiewicz PB-TC D. A. Ahmuty PB-TC
'G. V. Cranstor.
'638-5, Chesterbrook
. Correspondence Control Program 618-3, Chesterbrook E. J. Cullen S23-1, Main Office A. A..fulvio A4-4N, Peach Bottom
-D.lR. Helwig SlA-ll, Chesterbrook D. B. Miller, Jr.
SMO-1, Peach Bottom PB Nuclear Records A4-2S, Peach Bottom K. P. Powers' A4-lS, Peach Bottom l~
t l'
.