Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20102A375 + (08:50:33, 13 December 2024)
- ML20102A383 + (08:50:33, 13 December 2024)
- 05000346/LER-1992-005, :on 920619,hourly Fire Watch of Inoperable Fire Barriers Exceeded Allowable Interval by Five Minutes.Caused by Personnel Error.Importance of Fire Watch Patrol During Surveillance or Maint Reiterated W/Individual + (08:50:35, 13 December 2024)
- ML20102A369 + (08:50:37, 13 December 2024)
- JPN-92-040, Forwards Summary of IGSCC Insp During 1992 Refueling Outage. Core Spray Piping B in Primary Containment Replaced w/347 Modified Stainless Steel.Electrochemical Potential Monitoring Sys Installed in Reactor Water Recirculation Sys + (08:50:38, 13 December 2024)
- ML20102A359 + (08:50:39, 13 December 2024)
- HL-2315, Responds to NRC Re Violations Noted in Insp Rept 50-321/92-12.Corrective Actions:On 920507 Clearances 1-92-539 & 2-92-381 Were Issued on Control Switches for Excess Flow Check Valves 1B21-F051C & 2B21-F051C + (08:50:40, 13 December 2024)
- ML20102A353 + (08:50:40, 13 December 2024)
- ML20102A350 + (08:50:41, 13 December 2024)
- ML20102A345 + (08:50:42, 13 December 2024)
- 05000331/LER-1992-010, :on 920617,RW Pump Circuit Failure Caused Fire to Break Out in 1B20 Load Center.Caused by Inadequate Review of Breaker Disconnect Compatability W/Load Ctr Cubicle Stabs in Design.Procedural Revisions Re Design Made + (08:50:45, 13 December 2024)
- ML20102A336 + (08:50:47, 13 December 2024)
- ML20102A330 + (08:50:48, 13 December 2024)
- ML20102A322 + (08:50:49, 13 December 2024)
- ML20102A328 + (08:50:49, 13 December 2024)
- HL-2314, Forwards Revs 10C to FSAR Updates for Units 1 & 2 + (08:50:50, 13 December 2024)
- ML20102A319 + (08:50:51, 13 December 2024)
- ML20102A318 + (08:50:52, 13 December 2024)
- ML20102A314 + (08:50:53, 13 December 2024)
- RS-91-137, Rev 0 to RCIC Reliability Analysis,River Bend Nuclear Station + (08:50:54, 13 December 2024)
- ML20102A298 + (08:50:55, 13 December 2024)
- ML20102A293 + (08:50:56, 13 December 2024)
- RBG-37217, Forwards Rev 0 to RS-91-137, RCIC Reliability Analysis, River Bend Nuclear Station. Rept Submitted as Followup to Sys Reliability Program Presentation at Facility on 920623 & Will Serve as Addl Info for Remick to Clarify Questions + (08:50:56, 13 December 2024)
- 05000366/LER-1992-008-01, :on 920620,RWCU Isolation Signal Was Received Resulting in Group 5 Primary Containment Isolation Sys Actuation.Caused by Component Failure.Components Replaced & Controller Was Calibrated Satisfactorily + (08:50:59, 13 December 2024)
- 05000278/LER-1991-017-01, :on 910924,MSRV SV Wiring Insulation Was Discovered to Be Degraded Due to Improper Installation. Caused by Temp Increase from Insulation Installation.Thermal Insulation Was Properly Reinstalled + (08:51:02, 13 December 2024)
- ML20102A285 + (08:51:03, 13 December 2024)
- HL-2322, Forwards Response to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Fire Damage. Fire Watch for Drywell Access Room Will Be Performed + (08:51:04, 13 December 2024)
- ML20102A283 + (08:51:05, 13 December 2024)
- ML20102A280 + (08:51:06, 13 December 2024)
- BECO-92-075, Responds to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Fire Damage. Thermo-Lag Matl Not Installed at Facility + (08:51:07, 13 December 2024)
- ML20102A273 + (08:51:07, 13 December 2024)
- ML20102A272 + (08:51:08, 13 December 2024)
- ML20102A271 + (08:51:09, 13 December 2024)
- 05000321/LER-1992-017, :on 920626,determined That Requirements of Unit 1 TS Table 3.2-8,item 3 Not Being Met.Caused by Less than Adequate Procedures.Wiring Changes Will Be Implemented & Procedure 57SV-D11-007-2S Will Be Revised + (08:51:12, 13 December 2024)
- ML20102A258 + (08:51:16, 13 December 2024)
- ML20102A256 + (08:51:17, 13 December 2024)
- PY-CEI-NRR-1517, Forwards Perry Nuclear Power Plant Individual Plant Exam, Per Generic Ltr 88-20.Plant Improvements Made Due to Individual Plan Exam Insights Listed on Encl + (08:51:18, 13 December 2024)
- ML20102A250 + (08:51:19, 13 December 2024)
- B14180, Forwards Rev to 911017 Requests for Relief from Second 10-yr Inservice Insp Testing Program.Encl Describes Alternate Testing for Centrifugal Charging Pump Measurements & Vibration Monitoring + (08:51:20, 13 December 2024)
- ML20102A248 + (08:51:21, 13 December 2024)
- ML20102A242 + (08:51:22, 13 December 2024)
- ML20102A241 + (08:51:22, 13 December 2024)
- ML20102A239 + (08:51:23, 13 December 2024)
- ML20102A237 + (08:51:24, 13 December 2024)
- ST-HL-AE-4155, Forwards Change QA-010 to Operations QA Plan.Change Will Be Incorporated in Operations QA Plan in Next Annual Update + (08:51:25, 13 December 2024)
- ML20102A234 + (08:51:26, 13 December 2024)
- HL-2225, Application for Amends to Licenses DPR-57 & NPF-5,revising TSs to Add Addl Electrical Sys Requirements,Per Generic Ltr 91-11, Resolution of Generic Issues 48, LCOs for Class 1E & 49, Interlocks & LCOs for Class 1E Tie Breakers.. + (08:51:27, 13 December 2024)
- ML20102A223 + (08:51:33, 13 December 2024)
- ML20102A220 + (08:51:34, 13 December 2024)
- ML20102A218 + (08:51:35, 13 December 2024)
- RBG-20-034, Forwards Change to FSAR Section 6.2.6.5.1 Re Upcoming Drywell Bypass Leakage Test.Change Provides Max Allowable Leakage Rates & Revised Min Duration for Tests.Min Test Duration Reduced Per Listed Bases + (08:51:36, 13 December 2024)