Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20106B091 + (08:11:27, 13 December 2024)
- ML20106B086 + (08:11:28, 13 December 2024)
- ML20106B052 + (08:11:29, 13 December 2024)
- ML20106B076 + (08:11:29, 13 December 2024)
- ML20106B047 + (08:11:30, 13 December 2024)
- RBG-20010, Final Deficiency Rept DR-208 Re Pipe Support Clamp Supplied by Bergen Paterson Nonconformance & Disposition Rept 5835 Issued to Install Two 1/16-inch Thick Washers on Part. Condition Not Reportable Per 10CFR50.55(e) + (08:11:31, 13 December 2024)
- ML20106B041 + (08:11:31, 13 December 2024)
- ML20106B040 + (08:11:32, 13 December 2024)
- NRC-92-0115, Forwards Response to GL 92-04, Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in Bwrs + (08:11:33, 13 December 2024)
- ML20106B032 + (08:11:34, 13 December 2024)
- B14247, Responds to Concerns Raised in SG Replacement Project Insp 50-336/92-26 During Wk of 920831 & at 920904 Exit Meeting. RCS Pipe Cutting Chronology & Pipe Stress Analysis Action Plan Encl + (08:11:35, 13 December 2024)
- 05000352/LER-1985-003-01, :on 850105,nuclear Steam Supply Shutoff Isolation Signal Resulted in Isolation of Reactor Water Cleanup Outboard Valve.Caused by Inadvertent High Differential Flow Signal + (08:11:37, 13 December 2024)
- ML20106B024 + (08:11:38, 13 December 2024)
- JPN-92-052, Forwards Rev 1 to Ja Fitzpatrick Nuclear Power Plant Colr. Rept Covers Reload 10/Cycle 11 & Contains Operating Limits Applicable to Next Operating Cycle + (08:11:39, 13 December 2024)
- ML20106B018 + (08:11:39, 13 December 2024)
- ML20106B006 + (08:11:40, 13 December 2024)
- HL-2923, Forwards Response to GL 92-04, Resolution of Issues Re Reactor Vessel Water Level Instrumentation in BWRs Per 10CFR50.54(f). Walkdown Performed on Instrument Panels & Ref Leg Tubing.No Visible Leakage Indentified + (08:11:41, 13 December 2024)
- ST-HL-AE-4050, Application for Amend to License NPF-76,proposing one-time Amend to TS 4.3.4.2 to Extend 40-month Insp Interval for Turbine Valves to Approx 52 Months + (08:11:41, 13 December 2024)
- ML20106A994 + (08:11:42, 13 December 2024)
- ML20106A992 + (08:11:43, 13 December 2024)
- BVY-92-115, Responds to NRC Bulletin 92-001 Supplement 1 Failure of Thermo-Lag Fire Barrier Sys to Maintain Cabling in Wide Cable Trays & Small Conduits Free from Fire Damage. Temporary Fire Detection Installed + (08:11:44, 13 December 2024)
- HL-2925, Forwards Response to NRC Re Violations Noted in Insp Repts 50-321/92-18 & 50-366/92-18.Corrective Actions: Temporary Mod 2-92-61 Written to Electrically Bypass Temp Switch 2U61-N110B & Valve 1G41-F041 Repacked + (08:11:45, 13 December 2024)
- ML20106A990 + (08:11:45, 13 December 2024)
- ML20106A987 + (08:11:46, 13 December 2024)
- ML20106A984 + (08:11:47, 13 December 2024)
- ML20106A973 + (08:11:48, 13 December 2024)
- ML20106A965 + (08:11:49, 13 December 2024)
- ML20106A956 + (08:11:50, 13 December 2024)
- ML20106A936 + (08:11:51, 13 December 2024)
- ML20106A900 + (08:11:52, 13 December 2024)
- ML20106A909 + (08:11:52, 13 December 2024)
- RBG-37-509, Provides Response to NRC Bulletin 92-001,Supplement 1 Failure of Thermo-Lag 330 Fire Barrier Sys to Perform Specified Fire Endurance Function. All Barriers Declared Inoperable on 891026 Following Unsuccessful Testing + (08:11:53, 13 December 2024)
- ML20106A885 + (08:11:54, 13 December 2024)
- ML20106A874 + (08:11:55, 13 December 2024)
- ML20106A849 + (08:11:55, 13 December 2024)
- ML20106A842 + (08:11:56, 13 December 2024)
- ET-NRC-92-3750, Forwards Proprietary Info in Partial Response to 920721 RAI Re AP600 Testing Program.Encl Withheld (Ref 10CFR9.17(a)(4)). Proprietary Portion of Document Sent to Westinghouse + (08:11:57, 13 December 2024)
- ML20106A836 + (08:11:57, 13 December 2024)
- 0CAN018512, Responds to Generic Ltr 84-24 Re Certification of Compliance of Environ Qualification Program,Per 10CFR50.49. Implementation of Environ Program to Satisfy Requirements Affirmed + (08:11:58, 13 December 2024)
- ML20106A820 + (08:11:59, 13 December 2024)
- ML20106A827 + (08:11:59, 13 December 2024)
- ML20106A818 + (08:12:00, 13 December 2024)
- 0CAN018510, Requests Extension Until 850426 for Response to 841218 Request for Addl Info Re 1982 Relief & Safety Valve Tests, Per NUREG-0737,Item II.D.1 + (08:12:01, 13 December 2024)
- ML20106A806 + (08:12:01, 13 December 2024)
- LD-92-098, Forwards Structural Models for Sys 80+ Seismic Analysis for Nuclear Island & Nuclear Annex,Per Apr 1992 Audit Meeting in Bethesda,Md + (08:12:04, 13 December 2024)
- 0CAN088412, NPDES Noncompliance Notification:On 840720,undetermined Quantity of Wastewater Discharged Due to Mechanical Failure of Sanitary Sewage Treatment Sys.Caused by Partial Clogging of One Grinder Pump.Pump Breaker Reset.Commode Repaired + (08:12:05, 13 December 2024)
- ML20106A774 + (08:12:05, 13 December 2024)
- ML20106A772 + (08:12:06, 13 December 2024)
- ML20106A769 + (08:12:07, 13 December 2024)
- ST-HL-AE-4225, Forwards Pages to Be Added to South Texas Project Electric Generating Station Level 2 PRA & IPE, Transmitted Via + (08:12:08, 13 December 2024)
- ML20106A768 + (08:12:08, 13 December 2024)