Forwards Proprietary Process Control Programs SS-001,Rev E & FI-002,Rev C Re Solidification of Wet Wastes.Programs Will Be Used to Process All Wet Radwaste Until Permanent Sys Fully Tested.Programs Withheld (Ref 10CFR2.790)
ML20106A818
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/11/1984
From: Jens W
DETROIT EDISON CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML19269A634 List:
References
EF2-71992, NUDOCS 8410170242
Download: ML20106A818 (12)


Text

-

adI -x,-eO~

Wsyne H. Jesu 9

Vio Pres &nt -

Nuclear Operatxn Fermi-2

. 6400 North Dwe Highway Newport uen.gan 48iss October 11, 1984 ISOn 9131586*53 EF2-71992 e...

Director of Nuclear Reactor Regulation Attention:

Mr.'B. J.

Youngblood, Chief Licensing Branch No. 1.

U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear-Mr. Youngblood:

Reference:

Fermi 2

-NRC Docket No. 50-341

Subject:

Radwsste Processing Based on the current schedule it appears that the preoperational testing of the permanent Fermi 2 radwaste system will not be complete at the time of initial fuel load.

Hence, Edison intends to utilize portable radwaste processing system supplied by NUS Corporation.

This system is described in NUS Topical Report PS-53-00378, "NUSPSC Topical Report on Radwaste Solidification System" which has been submitted to the NRC.

In addition, conformance of the waste form to 10CFR61 requirements is discussed in NUS Topical Report TR-002 submitted to the NRC in May 1984 and revised in September 1984.

Two process control programs (PCP) are being submitted for your review (attachments A and B).

One governs dewatering and the other covers solidification.

These are the PCP's that will be used by the vendor to dewater or solidifv all Net wastes until Edison's permanent system has been fully tested.

Attachment C consists of a revision to the FSAR which amplifies the existing discussion concerning the use of vendor supplied portable processing systems.

It has been written in a manner which would describe several vendor supplied systems currently available.

If Detroit Edison finds it necessary or-expedient to utilize the services of a vendor other than NUS, the NRC will be notified and the necessary documentation and PCP's will be submitted or referenced prior to implementation.

\\

S c6 P

pl g

b 8410170242 841011 FJph yd o

PDR ADOCK 05000341 A

PDR L?OA 994 co j

)

o o

Mr. B. J. Youngblood l

October 11, 1984 l

EF2-71992 Page 2 Attachments A and B contain information proprietary to NUS Corporation and it is requested that they be withheld from public disclosure as permi tted by 10CFR2.79 0.

An affidavit by NUS Corporation is attached.

Should you have any questions on this matter please contact l

Mr. O. K. Earle at (313) 586-4211.

I Sincerely, 7

Attachments

'g l

cc:

Mr.

P. M.

Byron Mr. C. M. Nichols Mr. M. D.

Lynch USNRC, Document Control Desk Washington, D.C.

20555 l

w

.A

r

,~.

fm

]

Y Attachments A and B to this letter are identified below:

Attachment A:

NUS Process Services Report No. SS-001, " Process Control Program for NUSPSC Radwaste Solidification Systems", Re-vision E.

Attachment B:

NUS Process Services Report No. FI-002, " Standard Process Control Program for Dewatering Transfix Disposable Pressure Vessels", Revision C.

These reports are proprietary NUS Process Services Corporation reports as indicated in the following affidavit.

Fifteen (15) copies of these reports and the cover letter were docketed coincident with the docketing of this letter.

t l

l l

1 l

N J

m

g-)

fm

()

N_,]

=*

Affidavit Submitted to the Nuclear Regulatory Commission Concerning Confidential Information and Trade Secrets Contained in Procedures Prepared by NUS Process Services Corporation State of South Carolina County of Richland

)

Steven B.

McCoy states as follows on behalf of NUS Process Services Corporation:

1 1.

I am the Director of Support Services for NUS Process Services Corporation.

2.

I have prepared and am familiar with the following procedures, hereinafter referred to as " procedures",

prepared by NUS Process Services Corporation:

o SS-001, Rev.

E,

" Process Control Program for NUSPSC i

Radwaste Solidification Systems" o

FI-002, Rev. C,

" Standard Process Control Programfor Dewatering TRANSFIX" Disposable Pressure Vessels" 3.

NUS Process Services Corporation, hereinafter "NUSPSC" has granted permission for Detroit Edison Company to submit copies of the procedures to the Nuclear Regulatory Commission.

The copies of the procedures contain proprietary information which should be withheld l

from public disclosure.

l l

j i

Q].

[Jl

/

- 7, y _

\\

~

s an; *

-- 4. - NUSPSC's Radwaste Solidification and TRANSFIX" systems are major components of its waste processing business.

These systems for processing radioactive liquid wastes-are unique to NUSPSC.

Design and fabrication details for these systems are held in strictest' confidence-by all employees.

All employees of NUSPSC complete an agreement with NUSPSC regarding protection and non-disclosure' of trade secret information at the commencement of their employ-ment.

The information included in the procedures contains the type of information covered under the non-disclosure agreement.

NUSPSC routinely stresses that such information is not to be discussed outside the company either during or after employment.

NUSPSC is in the process of making its initial entry into the radwaste processing service market.

The Rad-waste Solidification and TRANSFIX" systems and associated chemical control information represent a substantial commitment of personnel and financial resources for research, development, design and procedural controls.

This commitment has resulted in systems currently superior to that provided by I

competitors and this superiority is the basis on which system details are withheld from public disclosure.

The information included in the procedures is not l

available through public sources.

Release through public channels of the procedures will substantially l

harm the competitive position of NUSPSC.

NUSPSC has l

l L.

.i

(

lh

_c.

expended over $750,000 in salaries and capital equipment during the last year and is engaged in a capital building project to make these systems available.

Duplication of this effort by competitors would require both similar capital expenditures and the assembly of a team of experts similar to the design team employed by NUSPSC.

b Steven B.

McCoy Director Support Services Sworn and subscribed before me this f M day of October, 1984.

'o

, [,

eudd My commission expires-wb /[/ffd Nota Pu ic i

l i-L.._

""*"*" r w

EF-2.FSAR j.

Protect plant personnol from rcdiction expoauro end incorporate the basic "as low as is reasonably achiev-able" (ALARA) objectives by the use of automated

.j

~

systems, shielding, and remotely operated instrumenta-tion and controls.

11.2.2

System Description

The liquid radwaste system is composed of two major subsystems--

the floor drain collector (FDC) subsystem and the waste collector subsystem.

The overall radwaste system's piping and instrumenta-42l tion diagram is included as Figure 11.2-1 (Sheets 1 through 14),

and Figure 11.2-2 (Sheets 1 through 5) depicts the process flow 38 diagrams and the sump-pump diagrams.

53l Tables 11.2-1, 11.2-2, and 11.2-3 list the estimated inputs to the liquid radwaste system along with the corresponding process flow diagram stream numbers (Figure 11.2-2).

On an infrequent basis, the liquid radwaste system may produce water that may not be required for reuse in the station's water balance, in which case the system effluent will be discharged in a controlled manner to the circulating-water reservoir blowdown line.

Processed liquid not meeting the criteria for either dis-iS3l charge or reuse is normally returned to the system for g pipresi.1-2 Sked C.

reprocessing, 1

The liquid and solid radwaste systems have a number of p iping connections for use by portable waste-processing systems

,in the

.)

event of normal system unavailability (see Table 11.2-4fk 4M-speci-f!

Syste.5e are ir.cluded in the radweste system-description 42 s4nce these connectione eso for external use and vuly in the euent of in=talled syste malfunction.

Tempcrary coner-act cer"-

ices vill be brought-to the cite-for waste-processtng and solid-i-Mcat-ic..

Thace carvicee vill cet apAicable regulat-lons--when they ere required.

In se ct atackel para raph as e,otino.fion of g g ;) goye )

su esce.

11.2.2.1 Floor Drain Collector Subsystem The FDC subsystem will receive periodic and uncontrolled inputs from a variety of plant floor drain sources.

The sources to this subsystem have been segregated from the waste collector sub-system because their water quality will probably be poor, will have high conductivity, and will normally contain higher contents of suspended and dissolved solids.

The activity content will be 38 generally lower than that of the waste collector subsystem.

The 3l4 2 estimated chemical characteristics of liquid radwaste input streams for this subsystem are listed in Table 11.2-5.

The chamical nature of the FD0 subsystem inpute will also be highly variable.

The effluent from the chemical waste tank will be particularly important to the overall stream process require-ments because it is a source of high concentrations of dissolved solids.

Periodic and variable quantities of oil and grease me3t 11.2-2 Amendment 53 - February 1984

o o

Blid n.4s : E s.A p va y.pk,,

p g a it 2 z s.1,J.

~.m.

These connections are for external use, primarily in the event of system malfunction and/or if the permanent system is not conpletely available for initial plant fuel load. Tmporary vendor-contract services are available onsite for waste processing and solidification. These services meet applicable regulations and are nore fully described in sections 11.2.10 and 11.5.6.

4' 1

n.

1 er

,% og

.S*.

M a.

4etM 6

e D.

-*i.

O es,

a We me.

eG p.

-ee m &

. ~.

  • 9

[

E r

,-r.

,-n-,--,-.,,,_.,r,,

.--.-m,--,,_-n nw--

r,-n-g,,.,-,,,,-_,...,.----------+,.,---,e,-

-.-...n----,

v

. 2<<

3 r3 1

U 4

,s.

-11.2.10% Vendor Liquid Processing Systems N.If the described permanent Fermi 2 liquid processing system is not operational at the time of initial fuel load, or is not available for some other reason, then a vendor-supplied portable system will be utilized.

The system will be operated by the vendor and will be closely monitored by Detroit Edison personnel.

The types and quantities of waste to be processed are_the same as for the permanent radwaste systems (as described in Section 11.2.2).

Fermi-2-specific operating procedures have been developed for operating this system as inter-faced with the Fermi liquid radwaste system.

This vendor-supplied portable system will be installed.

in the areas immediatelycadjacent.to the: truck-bay.of the.'-

Onsite Storage Facility (OSSF). 'These areas of the OSSF.

were specifically designed and' constructed to contain and handle mobile process systems (see FSAR section ll.B.2.2.ll).

Concrete floors and walls in this region are coated, and all drains are. routed back to.the. liquid radwaste system.

The remote-operated overhead crane is available to move the process. equipment.

The design of these OSSF areas' O.

and the methods of operation have incorporated features to maintain personnel exposures ALARA.

Permanent piping installed in the shielded.OSSF: pipe tunnel'wil1Jtransport the radioactive process fluid to the vendor's equipment.

The interface connections between the mobile system and the Fermi 2 system are shown in Fig. 11.2-2 (sheet 1),

and described in Table 11.2-4.

The portable radwaste system operates by passing the contaminated water through a series of pressure vessels, as necessary, containing filtration media or ion-exchange resins.

When these vessels are removed from service, the media are dewatered in situ or solidified, and then shipped to an approved burial site for-disposal.

In both cases, the resulting end products comply with all federal and state disposal regulations.

The processed water is, in turn, routed to the Waste Sample Tanks when established conductivity limits are met.

s'

O EF 2 FSAR O

The system is designed to

)

a.

Collect, process, and solidify radioactive wastes,

)

which consist primarily of evaporator bottoms, filter backwash, tank sludge letdown, and spent resins e

b.

Provide for the transfer of decantate, resin sluice water, etc., to the LRS for processing and eventual 42 reuse or controlled discharge c.

Package, handle, and temporarily store solidified and compressed radioactive wastes generated as a result of the normal operation of the plant, including those from anticipated operational occurrences d.

Provide a means to transfer the packaged wastes to vehicles that transport them to an offsite burial facility 38 3~.

Package the-radioactive-wastes ~ in a ' manner that will '

e 53 allow shipment and burial in accordance with all ap-plicable federal and state ragulations f.

Provide a' process for the solidification of wet wastes that leaves no freestanding water in the finali product g.

Provide a means: to transfer wet. wastese.to atmobileu contractor-supplied system, if needed h.

Compact dry waste in a container that is suitable for offsite transportation and burial 1.

Protect plant personnel from radiation exposure and incorporate the basic ALARA principles through the use of automated systems, shielding, and remotely operated instrumentation and controls Standard Technical Specification 3.11.3.1 requires the establish-ment of a process control program (PCP).

The purpose of this PCP 10 to provide reasonable assurance of the complete solidification 42 of processed wastes and the absence of free water in the proc-ocsed waste.

Fermi 2 will be operated in accordance with its p3l PCP, which is to be reviewed and approved by the NRC before implementation.*

11.5.2 S

Inputs b 38.Tcble 1.5-1 lists all major inputs to the SRS.

This table shows that the greatest input to the SRS is from the condensate filter /

d:m neralizer backwash, stream 21.

This source dominates the de ign daily volume, representing 81 percent of a volume of about Ibr vendor-supplied solidification services, an approved PCP f

will be utilized. This is more fully described in section 11.5.6.

t j

11.5-2 Amendment 53 - FeDruary 1984

f3

- f3 U

\\..)

~o=

11.5.6 Vendor Solidification System f'2 If the permanent Fermi 2 solidification system is not-operational at the time of initial fuel load, or is not available for some other reason, then a vendor-supplied portable solidification system will be utilized.

The portable solid waste management system will be supplied-and operated by the vendor per the requirements and description in their topical report, which has been submitted to the NRC.

The types and quantities of waste to be processed are the same as for the permanent Fermi solidification system and are described in section 11.5.2.

The system operation will be closely monitored by Detroit Edison personnel.

The vendor will utilize its own Process Control Program (PCP), which has also been submitted to the NRC for review and approval.

Conformance to 10 CFR 61 criteria is discussed in the vendor-supplied documentation, which has been submitted to the NRC.

Fermi 2 specific operating procedures have been developed for operating this system as interfaced with the Fermi solid radwaste system.

The portable system will be installed in the laydown-areas immediately_ adjacent to the truck-bay area of the Onsite Storage Facility (OSSF), with the exception of a bulk cement trailer, which may be: located outside of the truck-bay door.

These areas of the'OSSF were specifically designed and constructed to contain and handle mobile process systems -(see FSAR section 11.B.2.2.11).

Concrete floors and wallslof this region are coated, and all drains are routed'back to the liquid radwaste system.

The remote-operated overhead crane is available to move equipment onto or from trucks located in the truck-bay.

The. basi:

design of. these areas and the methods of system operation

~

have incorporated features to maintain operator exposures oJALARA.

Permanent piping installed in the shielded OSSF pipe tunnel will transport the radioactive process fluid to the vendor's equipment.

The interface connections between the portable system and the Fermi 2 system are shown in Fig. 11.2.2 (sheet 1) and described in Table 11.2.4.

In general, liquid from the Centrifuge Feed Tank is transported directly to the vendor equipment, and clarified liquid is returned to the Waste Clarifier Tank.

The waste is pumped to a disposable solidification liner.

Pretreatment of the waste with chemical additives is then conducted in accordance with talues derived from the Process Control Program (PCP).

Coment is then added and the waste is allowed to cure to complete the solidification process.

The solidification liners are suitable for transportation and burial at an approved burial facility.

Additionally, the solidification liners are compatible with numerous approved shipping i

casks if a liner requires shipment in a cask.

l l

L 118.2.2.10 Comp ctirn 9

(:)

Ta d:crocco tho voluna of col d wroto to be.rbmovcd frca tha

}

l Oito, the onsite storage facility uses a high-efficiency, in-l drua,, ram head compactor system with a filtration and ventilation I-cyctea.

l Tho ventilation system controls any contaminated particles that may be released-while the packaging equipment is being operated.

Tho c:mpacting press has an air exhaust system, consisting of a l

hood, o prefilter and absolute filter, and an exhaust fan.

Thio cystem is so arranged that when the ram descends to compress waoto material, the air exhaust system descends until the hood is juct cbove the drum and in position to filter the air from the drua oc the material is compressed.

Th3 compressible trash, which is made up of low-activity mate-ricl, including glass, paper, rags, mop heads, booties, gloves, cnd towels, is normally transported from the radwaste building to tho compactor room in plastic bags.

The trash is then placed in tho drums and compacted.

When a drum is filled, the top is

[

footoned on the drum, and a forklift truck transports the drum froa the compactor room to drum staging or drum-storage areas.

-f r1B,2.2.11 Temporary Solidification and Processing 1

Piping is routed from the main radwaste system to the onsite gstorcgo. facility to allow temporary processing and/or solidifica-

/

ticn of wet waste.in.the truck-hay. area.

All. pipes run in a shielded pipe tunnel beneath the storage fccility and conform to ANSI B31.1.

An access hatch to the pipe tunnol beneath the storage facility-is located in the truck bay.

.Th3orcdwaste pipelines terminate in'.the truck bay (see Figure llB-2).

A blind flange is at the termination of each line.

Each pipoline is capable of being flushed and hydro-tested as neces-ccry with recycled condensate.

Water decanted from clurried pr*f"'*b "#""

d 4

- reeir in the truck bay will be returned -through 'the pipelinegte lthe liauld radwaste treatment sys sin the radwas.te building.

nen Ausu r uovoo-insa,msur A ue/en

-M t gpr!-ary8olidification system in the radwaste building te 4AE 8

tcmporarily unavailable, the wet waste elurrie would then be t' pump:d through the pipelines to commercial, transportable, and NRC-opproved cclidific= tion equipment brought in by trucks.

The Pt#NAMau f redwcote p ing will be connected at the flange fittings to the d

tecnspor le equipment with temporary linesy There ter; :: y 1 1...

provided by the vendor. g b > D tails concerning the vendor-supplied mobile g

j} faces 35 1

processing and solidification equipment are given J

in sections ES.2.10 and 11.5.6.

Il

)

11B-10 Amendment 54 - March 1984