Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20108A367 + (06:39:46, 13 December 2024)
- ML20108A365 + (06:39:47, 13 December 2024)
- W3P84-2963, Final Rept,Rev 1,on Significant Const Deficiency 84 Re Tube Track Welding.Reevaluation Performed by Ebasco Engineering to Establish Max Stress Levels Expected to Exist at Tube Track Welded Connections + (06:39:48, 13 December 2024)
- ML20108A354 + (06:39:48, 13 December 2024)
- ML20108A348 + (06:39:50, 13 December 2024)
- ML20108A338 + (06:39:51, 13 December 2024)
- ML20108A334 + (06:39:53, 13 December 2024)
- ML20108A330 + (06:39:54, 13 December 2024)
- ML20108A328 + (06:39:55, 13 December 2024)
- W3P84-2976, Interim Rept of Potentially Reportable Deficiency 179 Re Welding Program.Review & Evaluation of Welds Ongoing.Next Rept Will Be Submitted by 841130 + (06:39:56, 13 December 2024)
- ML20108A314 + (06:39:57, 13 December 2024)
- 05000354/LER-1996-012, :on 960320,missed Offgas Sample Resulting in Condition Prohibited by Ts.Caused by Defective Needle Luer Lock Adapter.Needle Luer Lock Adapter on Backup Sample Apparatus Replaced + (06:39:58, 13 December 2024)
- ML20108A307 + (06:39:59, 13 December 2024)
- W3P84-2961, Final Rept of Significant Const Deficiency 78 Re American Bridge Structural Steel.Reinsp of Connections in Steam Generator Framing Performed Scope of American Bridge Work Reviewed & Review of Existing Documentation Performed + (06:40:00, 13 December 2024)
- JPN-96-019, Informs of Extension of Second 10-yr ISI & IST Intervals by Period of Nine Months.Extension Being Applied to Third Period of Second Interval Currently Scheduled to End Sept 1996.Addl Nine Months Extends Interval Through June 1997 + (06:40:01, 13 December 2024)
- ML20108A298 + (06:40:01, 13 December 2024)
- ML20108A288 + (06:40:02, 13 December 2024)
- W3P84-2965, Interim Rept of Significant Const Deficiency 93 Re Charging & Letdown Containment Isolation Valves.Valve Replaced W/New Seats.Further Testing Recommended to Verify Proper Valve Operation.Next Rept Will Be Submitted by Dec 1984 + (06:40:03, 13 December 2024)
- RBG-19292, Interim Deficiency Rept DR-185 Re Placement of Two Isolation Valves Outside Containment for RCIC Turbine Exhaust Line Vacuum Breaker Sys.Interim or Final Status Rept Will Be Provided by 850116 + (06:40:03, 13 December 2024)
- W3P84-2964, Final Rept of Significant Const Deficiency 90 Re Overstressed Electrical Conduit.Revised Design Criteria Based on Analysis Issued.Items Remaining in Balance of Plant Will Be Completed by 841103 + (06:40:04, 13 December 2024)
- ML20108A269 + (06:40:06, 13 December 2024)
- ML20108A258 + (06:40:07, 13 December 2024)
- ML20108A257 + (06:40:07, 13 December 2024)
- ML20108A251 + (06:40:08, 13 December 2024)
- PY-CEI-NRR-1999, Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process + (06:40:09, 13 December 2024)
- BSEP-84-2107, Forwards Monthly Operating Repts for Sept 1984 & Corrected Feb 1983 Rept.Gross Thermal Energy Gen (Line 16) Incorrect Due to Apparent Software Problem.Problem Being Investigated. W/O Feb 1983 Rept + (06:40:10, 13 December 2024)
- ML20108A239 + (06:40:11, 13 December 2024)
- ML20108A236 + (06:40:11, 13 December 2024)
- ML20108A228 + (06:40:13, 13 December 2024)
- ML20108A212 + (06:40:16, 13 December 2024)
- ML20108A178 + (06:40:22, 13 December 2024)
- 05000255/LER-1984-027, :on 841122 & 1204,charging Pump Could Not Be Started from Control Room or W/Local Start Button.Caused by Closing Coil Failure in Breaker.Breakers Will Be Included in Preventive Maint Program + (06:40:24, 13 December 2024)
- BSEP-85-0106, Responds to NRC Re Violations Noted in Insp Repts 50-324/84-34 & 50-325/84-34.Corrective Actions:Util & GE Demonstrated That Cracks in 28-inch Weld Would Have Been Detected + (06:40:25, 13 December 2024)
- ML20108A150 + (06:40:26, 13 December 2024)
- ML20108A143 + (06:40:26, 13 December 2024)
- ML20108A131 + (06:40:27, 13 December 2024)
- ML20108A125 + (06:40:29, 13 December 2024)
- ML20108A129 + (06:40:29, 13 December 2024)
- ML20108A117 + (06:40:30, 13 December 2024)
- ML20108A111 + (06:40:31, 13 December 2024)
- ML20108A104 + (06:40:35, 13 December 2024)
- ML20108A098 + (06:40:39, 13 December 2024)
- ML20108A063 + (06:40:40, 13 December 2024)
- 3F0496-30, Special Rept 96-02:on 960313,fire Detection Zones Required by Fire Protection Plan Out of Svc for Greater than Fourteen Days.Hourly Fire Watch Established + (06:40:41, 13 December 2024)
- 05000302/LER-1996-009, :on 960327,failure to re-attach Instrument Tubing to Seismic Supports After Mod Leads to Operation Outside Design Basis Occurred.Caused by Personnel Error. Instrument Tubing Properly Supported + (06:40:43, 13 December 2024)
- ML20108A046 + (06:40:44, 13 December 2024)
- ML20108A035 + (06:40:46, 13 December 2024)
- ML20108A025 + (06:40:47, 13 December 2024)
- ML20108A022 + (06:40:48, 13 December 2024)
- ML20108A019 + (06:40:49, 13 December 2024)
- ML20108A012 + (06:40:49, 13 December 2024)