.i.

OPERATING DATA REPORT i

DOCKET NO.

50 244 DATE October 12, 1984 COMPLETED BY dO " r I.Mhh,

A n d r e w E.. M c N a'm a r a TELEPHONE (315)S24-4446 OPERATING STATUS Ext.- 301 Ginna

1. Unit Name:

GINNA STATION. UNIT #1 Notes

2. Reporting Perial:

September. 1984 The reactor power level

3. I.icensed Thermal Power (Mit):

15_20 was maintained at 100%

49 for the entire report

4. Nameplate Rating (Gross MWe):

470 Period

5. Design Electrical Rating (Net MWe):

490

6. Maximum Dependable Capacity (Gross Mic):
7. Maximum Dependable Capacity (Net MWe):

470

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

Power Level'to Yhich Restricted, If Any (Net Mic):

10. Reasons l'or Restrictions, If Any:

This Month Yr. to Date Cumulative 720 6.575 130.151 i1. Ilours In Reporting Period

12. Number of Ilours Reactor Tas Critical 720 4,639.73 98,239.71 0

56.23 1,687.55*

! L Reactor Reserve Shutdown flours 720 4.571.75 96.083.38

14. Ilours Generator On.Line
15. Unit Reserve Shutdown llours 8.5*

0 0

1,089,792 6 689,928 132,947,697

16. Gross Thermal Energy Generated (Mtil) 2
17. Gross Electrical Energy Generated (Mill) 357.755 L 212. 565 43.376.935 iH. Net Electrical Energy Generated (MTil) 340,137 2_,101,928 41.128.173 100%

69.53%

73.82%

19. Unit Service Factor 100%

69.53%

73.83%

20. Unit Availability Factor 100.51%

68.02%

68.94%

21. Unit Capacity Factor (Using MDC Net) 100.51%

68.02%

68.94%

22. Unit Capacity Factor (Using DER Net) 21 Unit Forced Outage Rate 5.48%

7.90%

0 2 8. Shutdowns Scheduled Over Next 6 Months (Type, Date and Dusation of Each):

60 days

_ Refueling _shu.talown_LMarch_2 1985) 2I. If Shut Down At End Of Report Period, Estimated Date of Startup:

26. linits In Test Status (Prior to Commercial Opers. tion):

Forecas t Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • Cummulative total commencing January 1, 1975

..... m v.

in.

R P

l

a.

v'

, c AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT

  1. 1, Ginna Station DATE Octqber 12, 1984 COMPLETED BY 6,h f.M{m >

Andrew E.

McNamara TELEPHONE 1 (315) 524-4446 Ext. 301 at Ginna hoNTH September, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

469 17.

475 2.

468 18, 476 l

3.

470 19.

476 4.

474 20.

475 5.

471 21.

474 6.

472 22.

474 7.

468 23.

476 S.

466 24.

472 9.

465 25.

473 10.

463 26.

473 11.

473 27.

474 12.

473 28.

474 13, 476 29.

473 14.

475 30.

474 15.

475 31.

16.

474

)

INSTRUCTIONS On this format, list the average daily unit power level in MWo-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

DOCKET NO.

50 244

)

UNIT NAME #LGinna Station UNIT SHUTDOWN AND POWER REDUCTIONS DATE October 12, 1984 COMPLETED BY k {1 b '* f M W :--_ %

Andrew E.

McNamara REPORT MONTli SEPTEMBER TELEPilONE f315)524-4446 Ext. 301~G1nna n

N

=

Ewa Couse & Corrective Eq

  • fa Licensee g,

e j$

3 i $"e Report #

M

[0 No.

Date 1.

5E 3

1II Event 2e 3

Action to Prevent Recurrence 2

g u

o No Shutdowns or power reductior s to report.

t I

1 2

3 4

F: Forced Reason:

Method:

Exhibit G -Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction' 4-Other (Explain) 0161)

E-Operator Training ac License Examination F-Administrative 5

E G-Operatioma! Error (Explain) e.. in e v. ine.

H-Other (Explain)

Exhibit 1 - Same Source f

s,

~

1.

_4_

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 244 UNIT Ginna' Station, Unit #1 DATE-October 12, 1994 E.h%

COMPLETED BY.

Andrew E.

McNhmara TELEPHONE 1 (315) 524-4446

~

-EXT. 301 at Ginna MONTH September 1984 The reactor power level was maintained at 100% for the report period, with no reductions.

l t

I

J%

I e

GINNA STATION MAINTENANCE REPORT

SUMMARY

GEPTEMBER, 1984 1.

Repack 1-A Charging Pump.

2.

Minor P.M.

Inspection of-the 1-D Service Water Pump.

3.

Operability verification _of the Bus 18 Undervoltage Protection System.

I

r..

1 f='27

o a. ::
  • "W1 GEQ

.~e*~L-~?'k lgf hygf

'fflN N**

0 5G1hbya's ct.1 Li"'_f.:-l* l

  • W Q

ROCHESTER GAS AND ELECTRIC CORPORATION

  • 89 EAST AVENUE, ROCHESTER, N.Y.14649 N

T E L E P w CN E' anca coos vis 546-2700 GINNA STATION October 12, 1984 l

Director, Of fice of 11anagement Information and Program Analysis U.S.

NUCLEAR REGULATORY COMMISSION Washington, DC 20555

Subject:

Monthly Report for September, 1984 Operating Status Information R.

E.

Ginna Nuclea'J Power Plant Unit No. 1 Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of September, 1984.

Very truly yours, I% use &

l Bruce A.

Snow Plant Superintendent BAS /ecg Attachments cc:

Dr. Thomas E. Murley NRC (1) k N

.